CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />188 <br /> <br />All butterfly valves shall be tested for leakage at the same time that the connecting <br />pipelines are hydrostatically tested. <br /> <br />In addition, all butterfly valves 12-inches in diameter and larger shall be field tested for <br />leakage. Valves may be tested in a horizontal position. All valves shall be tested bi - <br />directionally after the actuator/operator is installed and the adjustment stops are set. Each <br />side of the valve is to be tested for a duration of at least five (5) minutes at the pressure <br />rating of the valve with zero loss or leakage. The field pressure test shall be witnessed by <br />the City’s representative. Final field tests shall be performed within 75 miles o f the <br />project site. A minimum of 72 hours (or three working days) advance notice to the City <br />for testing is required. <br />All valve box frame and covers shall require PCC collars and shall be adjusted to finished <br />grade following paving operations. <br />Portland cement concrete pavement for gate collars shall conform to Sections, 400, 200, <br />201, and 302 of the Standard Specifications and these Special Provisions. <br />PCC used for gate collars construction shall be minimum class 560-A-3250. In addition <br />to these minimum requirements, the concrete shall possess the following characteristics: <br /> Flexural strength at 28 days: 550 p.s.i. min. <br /> Flexural strength at 7 days: 430 p.s.i. min. <br /> Compressive strength at 7 days: 2500 p.s.i. min. <br />All cement to be used or furnished on this Project shall be Type II low alkaline Portland <br />Cement conforming to ASTM C150. <br />Prior to the start of construction, the Contractor shall furnish to the Engineer laboratory <br />test data for the particular mix design he will use. The data will include the following: <br />A. A detailed concrete mix design including the type and amount of cement used; <br />complete gradation and source of the aggregate used; the amount of water used; and <br />any proposed admixtures. <br />B. Flexural strength test data for the same batch of concrete used in A above showing <br />the compressive strength of the concrete at 3, 7, and 28 days. <br />Section 302-6.4.4 entitled "Final Finishing" of the Standard Specifications shall be <br />modified as follows: <br />Delete all reference to wetted burlap. Final finish of the surface shall be textured <br />by stiff broom process that will produce scoring perpendicular to the centerline of <br />the street, performed at a time and in a manner to produce a hardened surface <br />have a coefficient of friction of not less than 0.38 as determined by California <br />Test 342. Curing to be applied immediately following broom process. <br />505 E Central Ave <br />#B11/6/2024