My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />195 <br />However, due to the age of the pipe and valves the Contractor should not expect an <br />absolute shutdown and shall be prepared to employ pumping equipment in the event that <br />an absolute shutdown cannot be achieved. The Engineer shall judge the shutdown to be <br />adequate for the tie-in to proceed as indicated on the plans and specified here in. The City <br />will not be responsible for any delays due to system shutdown and isolation when an <br />adequate shutdown can be achieved. <br />When an extensive water main shutdown is required and cannot be achieved adequately, <br />the Water Resources Division will determine what temporary service connections may be <br />required. The Contractor shall furnish all necessary appurtenances (i.e. hose, piping, <br />valves, and water trucks) and associated labor required to provide such temporary <br />service. All piping and associated equipment used in temporary service connections shall <br />be flushed and disinfected. All hoses shall be NSF approved. <br />Water main and services abandonment shall be per the engineering plans and these <br />Special Provisions. Any deviations shall require prior approval by the Engineer. <br />7.23 ASBESTOS CEMENT PIPE (ACP) <br />The Contractor may encounter existing asbestos materials (i.e. asbestos cement pipe) <br />during constructing water main improvements within the City. The Contractor is warned <br />that asbestos is a known human carcinogen when inhaled and poses serious health risks. <br />Asbestos fibers are easily inhaled and can result in chronic respiratory illness, cancer, and <br />other severe health effects. <br />Removal, handling and disposal of existing asbestos cement pipe (ACP) shall be <br />performed by a contractor or subcontractor registered by CAL/OSHA and certified by the <br />State Contractors Licensing Board for asbestos removal. Submit copies of the <br />certification to the City prior to the commencement of any asbestos removal activities. <br />The contractor or subcontractor shall comply with all State and Federal laws and <br />regulations regarding the handling and removal of asbestos materials. Th e contractor or <br />subcontractor shall properly identify, remove, and dispose of all asbestos materials. <br />Provide sufficient supervision and monitoring to assure conformance. <br />In specific instance of making connections to existing asbestos cement pipe, disconnect, <br />at the nearest joints, the length of asbestos cement pipe to be connected to the new pipe. <br />This length of existing asbestos cement pipe will be replaced by the new pipe making the <br />tie-in. No cutting, snap cutting or milling of the asbestos cement pipe will be allowed. <br />All removed ACP shall be wrapped in 6 mil polyethylene sheeting or bags sealed with <br />appropriate tape, and properly labeled and removed away from the construction area to <br />prevent damage. The contractor or subcontractor shall be responsible for the proper <br />identification, removal and disposal of the ACP pipe. Contractor or subcontractor shall <br />provide the City of Santa Ana field representative with the manifest for proper ACP <br />disposal. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.