Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />197 <br />16. Adaptors/Coupling Gaskets <br />Jack and bore equipment, appurtenance, and process submittals shall include, but not be <br />limited to the following manufacturer information: <br />1. Casing pipe and carrier pipe material including the standard to which it is <br />manufactured, outside diameter, wall thickness, joint configuration, and certificate <br />of compliance certifying that the pipe meets these specifications. <br />2. Details of casing spacers, including manufacturer’s recommended spacing. <br />3. Details of end seals for casing. <br />4. Working drawings of jacking pit and receiving pit <br />5. Details of jacking pit bracing, casing, jacking head, concrete support blocks, <br />bracing to prevent pipe shifting or floatation. <br />6. Concrete mix design. Concrete placement method and equipment. <br />7. Air-blown sand. <br />8. As-built drawings to include both alignment and profile. Drawings should be <br />constructed from actual field measurements. Raw data shall be submitted as part <br />of the As-built document. Contractor shall stipulate the tracking method to ensure <br />the data was captured. <br />9. Adaptors/Couplings/Gaskets <br /> <br />505 E Central Ave <br />#B11/6/2024