My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />202 <br />9.00 SPECIAL PROVISIONS - ELECTRICAL SYSTEM <br />9.01 SCOPE OF WORK <br />The following is a brief list of the electrical work to this Contract for the installation of <br />equipment as listed below. The work shall be complete as described in the specifications <br />and shown on the drawings, and shall result in a complete operating electrical system for <br />the purpose intended. <br />Furnish and install all material, labor, and equipment necessary for complete, operating <br />systems, except as noted complete and detailed list of work and materials to be supplied, <br />but shall be used as a guide: <br /> Distribution and control equipment. <br /> Underground distribution conduit, cable and pull boxes. <br /> Pole foundations and concrete work. <br /> Poles. <br /> Branch circuit panels. <br /> Branch circuit wiring and miscellaneous work. <br /> Light fixture and lamps. <br /> Spare parts. <br /> Shop drawings, material submittals, and work schedule. <br /> Record drawings, material submittals, and work schedule <br /> Record drawings and guarantees. <br /> Excavation for pole foundations. <br /> Excavation, backfill and compaction for trenches and pullboxes. <br /> Disposal of excess earth. <br /> Approved shoring, lights, and barricades. <br /> Bore under existing walks, walls, and pavement. <br /> Sod all trenches, and repair all damage to existing facilities caused by this work. <br /> Apply for and obtain all necessary permits, building department inspections, and <br />service connections. <br /> Temporary power and associated fees and charges will be obtained and paid for r <br />by the Contractor; Fees and hookup charges for permanent power will be paid by <br />the City. <br />9.02 SCHEDULE OF WORK <br />The Contractor shall schedule his work and shall coordinate with the City and all other <br />contracts in progress on the site at all times. Necessary coordination will be specified <br />during the construction conference. <br />Contractor shall submit a complete work schedule at the pre-construction conference. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.