CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />202 <br />9.00 SPECIAL PROVISIONS - ELECTRICAL SYSTEM <br />9.01 SCOPE OF WORK <br />The following is a brief list of the electrical work to this Contract for the installation of <br />equipment as listed below. The work shall be complete as described in the specifications <br />and shown on the drawings, and shall result in a complete operating electrical system for <br />the purpose intended. <br />Furnish and install all material, labor, and equipment necessary for complete, operating <br />systems, except as noted complete and detailed list of work and materials to be supplied, <br />but shall be used as a guide: <br /> Distribution and control equipment. <br /> Underground distribution conduit, cable and pull boxes. <br /> Pole foundations and concrete work. <br /> Poles. <br /> Branch circuit panels. <br /> Branch circuit wiring and miscellaneous work. <br /> Light fixture and lamps. <br /> Spare parts. <br /> Shop drawings, material submittals, and work schedule. <br /> Record drawings, material submittals, and work schedule <br /> Record drawings and guarantees. <br /> Excavation for pole foundations. <br /> Excavation, backfill and compaction for trenches and pullboxes. <br /> Disposal of excess earth. <br /> Approved shoring, lights, and barricades. <br /> Bore under existing walks, walls, and pavement. <br /> Sod all trenches, and repair all damage to existing facilities caused by this work. <br /> Apply for and obtain all necessary permits, building department inspections, and <br />service connections. <br /> Temporary power and associated fees and charges will be obtained and paid for r <br />by the Contractor; Fees and hookup charges for permanent power will be paid by <br />the City. <br />9.02 SCHEDULE OF WORK <br />The Contractor shall schedule his work and shall coordinate with the City and all other <br />contracts in progress on the site at all times. Necessary coordination will be specified <br />during the construction conference. <br />Contractor shall submit a complete work schedule at the pre-construction conference. <br />505 E Central Ave <br />#B11/6/2024