My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />206 <br />9.11 PROTECTION OF EXISTING SITE IMPROVEMENTS <br />Restore disturbed turf areas, irrigation systems, concrete, etc. Repair damaged park <br />equipment and turf caused by the Contractor to new condition, including backfill and <br />sodding of trench surface to the Engineer’s satisfaction. <br />9.12 GUARANTEE <br />The Contractor shall guarantee all work under this Contract to be free from defects in <br />material and workmanship for a period of one (1) year from the date of acceptance of the <br />work for filing of the Notice of Completion. <br />The Contractor shall repair or otherwise make good at its own expense all defects <br />developed during the guarantee period. The Agency may notify the Contractor by the <br />telephone or in wiring, and all the guarantee work shall be performed within 48 hours <br />after receiving notice from the Agency. <br />The Contractor’s general guarantee shall be on their letterhead, and shall include the <br />foregoing provisions and emergency telephone numbers. Together with the required <br />manufacturer’s guarantees, the Contractor’s guarantee shall be bound and furnished to the <br />Engineer in at least three (3) copies. Lamps shall be guaranteed as follows: <br />Lamps – 5,000 hours. <br />Ballasts shall be guaranteed for a minimum of one year. <br />9.13 MATERIALS <br />A. GENERAL <br />All materials and equipment shall be new and bear the label of or be listed by the <br />Underwriter’s Laboratories or the National Fire Protection Association, where <br />applicable. All materials shall be the standard products of manufacturers regularly <br />engaged in the production of such material and shall be the latest improve design. All <br />materials of the same type of one system shall be supplied by the same manufacturer. <br />In no case shall conduits, wires, etc. be smaller in size or less in number than that <br />shown on plans or called for in these specifications, even though codes may accept <br />otherwise. <br />Exposed conduit shall be hot dipped galvanized rigid steel conduit. All ells shall be <br />factory made rigid galvanized steel conduit. No PVC ells shall be used unless noted <br />on drawings. All ells 45 degrees and larger shall be sweep bends. All rigid steel <br />conduits exposed to earth 12” above finished grade shall be wrapped with 20 mil <br />PVC tape. Scotchrap No. 40 (green) or equal. PVC conduits shall be U.L. listed <br />Schedule 40 with properly cemented fittings. All underground shall be the PVC <br />Schedule 40. PVC conduit shall contain a green grounding conductor. All stub ups <br />into switchboard shall be green grounding conductor. All stub ups into switchboards <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.