My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> 01 32 10 - 5 Construction Schedule – Bar Chart <br />1. Description. <br />2. Total cost. <br />3. Percentage complete. <br />4. Value prior to current period. <br />5. Value this period. <br />6. Value to date. <br />1.11 EARLY WORK SCHEDULE <br />A. Shall establish scope of work to be performed during the first 60 days of Contract. <br />B. Shall contain the following phases and activities: <br />1. Procurement activities to include mobilization, shop drawings and sample <br />submittals. <br />2. Identification of key and long-lead elements and realistic delivery dates. <br />3. Construction activities in units of whole days limited to 14 days for each activity <br />except non-construction activities for procurement and delivery. <br />4. Approximate cost and duration of each activity. <br />C. Shall contain seasonal weather considerations. Seasonal rainfall shall be 10 year <br />average for the month as evidenced by Local Climatological Data obtained from U.S. <br />National Weather Service. <br />D. Activities shall be incorporated into Construction Schedule. <br />E. No application for payment will be evaluated or processed until Early Work Schedule has <br />been submitted and reviewed. <br />F. Shall be updated on a monthly basis while Construction Schedule is being developed. <br />G. Failure to submit an adequate or accurate Early Work Schedule or failure to submit on <br />established dates will be considered a substantial breach of Contract. <br />1.12 CONSTRUCTION SCHEDULE <br />A. Shall include Early Work Schedule as first 60 days of Construction Schedule. <br />B. Shall be a fully developed horizontal bar-chart-type schedule. <br />C. Shall indicate a completion date for project that is no later than required completion date. <br />D. Conform to mandatory dates specified in the contract documents. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.