My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> 01 45 80 - 3 Testing Laboratory Services <br /> B. Include: <br /> <br /> 1. Date issued, <br /> <br /> 2. Project title and number, <br /> <br /> 3. Name of inspector, <br /> <br /> 4. Date and time of sampling or inspection, <br /> <br /> 5. Identification of product and Specifications section, <br /> <br /> 6. Location in the Project, <br /> <br /> 7. Type of inspection or test, <br /> <br /> 8. Date of test, <br /> <br /> 9. Ambient conditions at time of test or sample-taking, <br /> <br /> 10. Results of tests and interpretation of test results, <br /> <br /> 11. Professional opinion as to whether tested work is in conformance with <br />Contract Documents, <br /> <br /> 12. Recommendations on retesting. <br /> <br /> C. Verification of Test Reports: Each testing agency shall submit to the Architect <br />and the Division of the State Architect a verified report in duplicate covering all <br />of the tests which were required to be made by that agency during the progress <br />of the project. Such report shall be furnished each time that work on the project <br />is suspended, covering the tests up to that time and at the completion of the <br />project, covering all tests. <br /> <br /> 1.7 LIMITS ON TESTING LABORATORY AUTHORITY <br /> <br /> A. Laboratory may not release, revoke, alter, or enlarge on requirements of <br />Contract Documents. <br /> <br /> B. Laboratory may not approve or accept any portion of the Work. <br /> <br /> C. Laboratory may not assume any duties of Contractor. <br /> <br /> D. Laboratory has no authority to stop the Work. <br /> <br /> 1.8 CONTRACTOR RESPONSIBILITIES <br /> <br /> A. Submit proposed mix designs to Architect for review in accordance with <br />Section 03 30 00. <br /> <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.