My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 50 00 - 1 Temporary Facilities and Controls <br />SECTION 01 50 00 <br />TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This section describes temporary construction facilities and temporary controls. <br />1. Electricity and lighting. <br />2. Heat and ventilation. <br />3. Water and sanitary facilities. <br />4. Construction aids. <br />5. Temporary enclosures. <br />6. Barriers. <br />7. Cleaning during construction. <br />8. Project identification. <br />9. Cellular telephone service. <br />10. Storage. <br />B. Related Requirements: <br />1. Section 01 70 00: Progress cleaning and final cleaning. <br />2. Section 01 74 10: Waste management. <br />C. Provide temporary construction facilities and temporary controls as required to <br />conform to applicable authorities and as required to complete Project in accordance <br />with Contract Documents. <br />1. Authorities: Contact governing authorities to establish extent of temporary <br />facilities and temporary controls required by authorities. <br />2. Building Manager: Contact Building Manager to establish extent of temporary <br />facilities and temporary controls required by building management. <br />1.2 ELECTRICITY AND LIGHTING <br />A. Provide electrical service required for construction operations, with branch wiring and <br />distribution boxes located to allow service and lighting by means of construction-type <br />power cords. <br />1. Connection to existing electrical service is permitted. <br />2. Owner will pay costs of energy used from existing on-site services. <br />3. Provide separate metering and reimburse Owner for costs of energy used from <br />existing on-site services. <br />B. Provide lighting for construction operations. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.