My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 60 00 - 1 Product Requirements <br />SECTION 01 60 00 <br />PRODUCT REQUIREMENTS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This section describes basic product requirements governing material and equipment. <br />1. General product requirements. <br />2. Product list. <br />3. Quality assurance. <br />4. Delivery, storage, and handling. <br />B. Related Requirements: <br />1. Section 01 25 00: Substitution procedures. <br />2. Section 01 30 00: Submittal of manufacturers' certificates. <br />3. Section 01 77 00: Operation and maintenance data. <br />1.2 GENERAL PRODUCTS REQUIREMENTS <br />A. Products include material, equipment, and systems. <br />B. Comply with Specifications, referenced standards, and applicable codes and <br />regulations as minimum requirements. <br />C. Provide new materials except as specifically allowed by Contract Documents. <br />D. Materials to be supplied in quantity within a Specification section shall be by one <br />manufacturer, shall be the same, and shall be interchangeable. <br />E. Provide equipment and systems composed of materials from a single manufacturer <br />except where otherwise recommended by equipment or systems manufacturer or <br />where otherwise indicated in Contract Documents. <br />F. Contractor’s Options: Comply with following options; requests for substitutions for <br />named manufacturers and products shall comply with requirements specified in <br />Section 01 25 00 – Substitution Procedures. <br />1. Products Identified by Reference Standards: Select product meeting referenced <br />standard for products specified only by reference standard. <br />a. Requests for Substitutions to be limited to products not complying with <br />referenced standards. <br />1) Submit justification for non-compliance with reference standards as part <br />of Request for Substitutions; if product is foreign made submit rationale <br />why foreign standards and basic materials indicates compliance. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.