Laserfiche WebLink
RTU <br />1 <br />AI <br />R <br />F <br />L <br />O <br />W <br />. <br />MAU <br />1 <br />RTU <br />2 <br />KEF <br />2 <br />F <br />P-13&15&17 <br />F <br />P-25&27 <br />F <br />P-7&9&11 <br />P-1&3&5 <br />F <br />F <br />P-19&21&23 <br />WP <br />P-2 <br />P-2 <br />WP <br />P-2 <br />KEF <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />3 <br />4 <br />5 <br />PROPOSED METAL <br />LADDER TO ROOF <br />GENERAL NOTES: <br />A.ALL EQUIPMENT AND DEVICES OUTDOOR SHALL BE NEMA 3R RATED AND <br />WEATHER PROOF. <br />B.ELECTRICAL CONTRACTOR SHALL COORDINATE THE ROUTING OF <br />CONDUIT/WIRING TO ROOF-MOUNTED EQUIPMENT WITH EQUIPMENT INSTALLER <br />PRIOR TO ROUGH-IN. WHERE ROOF-MOUNTED EQUIPMENT IS MANUFACTURED TO <br />BE FED FROM WITHIN MECHANICAL CURB ASSEMBLY - SEPARATE ROOF <br />PENETRATIONS FOR WIRING CONNECTIONS SHALL NOT BE PERMITTED. ALL <br />WIRING SHALL BE BELOW THE ROOF IN AN ACCESSIBLE CEILING SPACE LOCATION. <br />C.ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL <br />CONNECTION POINTS WITH THE EQUIPMENT INSTALLER PRIOR TO ROUGH-IN. <br />ELECTRICAL CONTRACTOR SHALL PROVIDE LOCAL REMOTE DISCONNECTING <br />MEANS FOR ALL ELECTRIC HEATING EQUIPMENT AS REQUIRED BY THE LOCAL <br />ELECTRICAL CODE. <br />D.ELECTRICAL CONTRACTOR SHALL REFER TO MECHANICAL/PLUMBING AND <br />ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND CHARACTERISTICS OF <br />ALL EQUIPMENT LISTED IN SCHEDULE. ANY MODIFICATIONS AND/OR ADDITIONAL <br />WORK NECESSARY SHALL BE INCLUDED IN THE BASE BID. <br />E.ALL TEMPERATURE CONTROL AND INTERLOCK CONDUIT AND WIRING SHALL BE BY <br />ELECTRICAL CONTRACTOR. <br />KEY NOTES: <br />VERIFY AND COORDINATE EXACT LOCATION AND CONTROL <br />REQUIREMENT WITH MECHANICAL PLANS AND IN THE FIELD. (TYPICAL) <br />PROVIDE WP 60AS, 45AF,3P DISCONNECT SWITCH. PROVIDE 1-1/2"C-3#4 <br />+ 1#10 GRD. <br />PROVIDE WP 30AS, 30AF,3P DISCONNECT SWITCH. PROVIDE 3/4"C-3#10 <br />+ 1#10 GRD. <br />PROVIDE WP 30AS, 20AF,3P DISCONNECT SWITCH. PROVIDE 3/4"C-3#12 <br />+ 1#12 GRD. <br />PROVIDE WP 30AS, 20AF,2P DISCONNECT SWITCH. PROVIDE 3/4"C-2#12 <br />+ 1#12 GRD. <br />PROVIDE WP 60AS, 60AF,3P DISCONNECT SWITCH. PROVIDE 1-1/4"C-3#4 <br />+ 1#10 GRD. <br />1 <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />14 <br />3 <br />0 <br /> <br />E <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />NOVUM <br />A R C H I T E C T U R E, Inc <br />www.novumarchitecture.com <br />OFFICES: SOUTH BAY / ORANGE COUNTY <br />116 S CATALINA AVE. STE. 122, <br />REDONDO BEACH, CA 90277 <br />TEL: 310-383-1827 / 310-709-4476 <br />N <br />AS SHOWN <br />TO <br />M <br />' <br />S <br /> <br />J <br />R <br />CAD <br />Author <br />9-1-2023 <br />tom's2023 <br />Mr <br />. <br /> <br />S <br />p <br />i <br />r <br />o <br />s <br /> <br />P <br />o <br />l <br />i <br />t <br />i <br />s <br />No.Description Date <br />1 PC Comments 08/08/2024 <br />2 HlthDep.Corr.2 09/03/2024 <br />1 SCALE: 1/4" = 1'-0" <br />ELECTRICAL ROOF PLAN <br />NORTH <br />ELECTRICAL <br />ROOF PLAN <br />E-113 <br />2 <br />3 <br />4 <br />5 <br />6 <br />6 <br />1 <br />1430 E Edinger Ave <br />3/27/2025