My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />PROJECT MANAGEMENT AND COORDINATION 013100 - 4 <br />b. Dimensions of major components, such as dampers, valves, diffusers, access <br />doors, cleanouts and electrical distribution equipment. <br />c. Fire-rated enclosures around ductwork. <br />7. Electrical Work: Show the following: <br />a. Runs of vertical and horizontal conduit 1-1/4 inches in diameter and larger. <br />b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire- <br />alarm locations. <br />c. Panel board, switch board, switchgear, transformer, busway, generator, and motor- <br />control center locations. <br />d. Location of pull boxes and junction boxes, dimensioned from column center lines. <br />8. Fire-Protection System: Show the following: <br />a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler <br />heads. <br />9. Review: Architect will review coordination drawings to confirm that in general the Work <br />is being coordinated, but not for the details of the coordination, which are Contractor's <br />responsibility. If Architect determines that coordination drawings are not being prepared <br />in sufficient scope or detail, or are otherwise deficient, Architect will so inform <br />Contractor, who shall make suitable modifications and resubmit. <br />10. Coordination Drawing Prints: Prepare coordination drawing prints according to <br />requirements in Section 013300 "Submittal Procedures." <br />C. Coordination Digital Data Files: Prepare coordination digital data files according to the <br />following requirements: <br />1. File Preparation Format: Same digital data software program, version, and operating <br />system as original Drawings. <br />2. File Preparation Format: DWG, Version, operating in Microsoft Windows operating <br />system. <br />3. File Submittal Format: Submit or post coordination drawing files using PDF format. <br />4. BIM File Incorporation: Develop and incorporate coordination drawing files into BIM <br />established for Project. <br />a. Perform three-dimensional component conflict analysis as part of preparation of <br />coordination drawings. Resolve component conflicts prior to submittal. Indicate <br />where conflict resolution requires modification of design requirements by <br />Architect. <br />5. Architect will furnish Contractor one set of digital data files of Drawings for use in <br />preparing coordination digital data files. <br />a. Architect makes no representations as to the accuracy or completeness of digital <br />data files as they relate to Drawings. <br />b. Digital Data Software Program: Drawings are available in BIM. <br />c. Contractor shall execute a data licensing agreement in the form of Agreement form <br />acceptable to Owner and Architect.
The URL can be used to link to this page
Your browser does not support the video tag.