ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />QUALITY REQUIREMENTS 014000 - 7 <br />H. Factory-Authorized Service Representative Qualifications: An authorized representative of <br />manufacturer who is trained and approved by manufacturer to inspect installation of <br />manufacturer's products that are similar in material, design, and extent to those indicated for this <br />Project. <br />I. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing <br />for compliance with specified requirements for performance and test methods, comply with the <br />following: <br />1. Contractor responsibilities include the following: <br />a. Provide test specimens representative of proposed products and construction. <br />b. Submit specimens in a timely manner with sufficient time for testing and analyzing <br />results to prevent delaying the Work. <br />c. Provide sizes and configurations of test assemblies, mockups, and laboratory <br />mockups to adequately demonstrate capability of products to comply with <br />performance requirements. <br />d. Build site-assembled test assemblies and mockups using installers who will <br />perform same tasks for Project. <br />e. Build laboratory mockups at testing facility using personnel, products, and <br />methods of construction indicated for the completed Work. <br />f. When testing is complete, remove test specimens and test assemblies, <br />and mockups; do not reuse products on Project. <br />2. Testing Agency Responsibilities: Submit a certified written report of each test, <br />inspection, and similar quality-assurance service to Architect and Commissioning <br />Authority, with copy to Contractor. Interpret tests and inspections and state in each report <br />whether tested and inspected work complies with or deviates from the Contract <br />Documents. <br />J. Mockups: Before installing portions of the Work requiring mockups, build mockups for each <br />form of construction and finish required to comply with the following requirements, using <br />materials indicated for the completed Work: <br />1. Build mockups of size indicated. <br />2. Build mockups in location indicated or, if not indicated, as directed by Architect. <br />3. Notify Architect seven days in advance of dates and times when mockups will be <br />constructed. <br />4. Employ supervisory personnel who will oversee mockup construction. Employ workers <br />that will be employed to perform same tasks during the construction at Project. <br />5. Demonstrate the proposed range of aesthetic effects and workmanship. <br />6. Obtain Architect's approval of mockups before starting corresponding work, fabrication, <br />or construction. <br />a. Allow seven days for initial review and each re-review of each mockup. <br />7. Maintain mockups during construction in an undisturbed condition as a standard for <br />judging the completed Work.