Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />QUALITY REQUIREMENTS 014000 - 8 <br />K. Integrated Exterior Mockups: Construct integrated exterior mockup according to approved Shop <br />Drawings. Coordinate installation of exterior envelope materials and products for which <br />mockups are required in individual Specification Sections, along with supporting materials. <br />Comply with requirements in "Mockups" Paragraph. <br />1.11 QUALITY CONTROL <br />A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, <br />Owner will engage a qualified testing agency to perform these services. <br />1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing <br />agencies engaged and a description of types of testing and inspection they are engaged to <br />perform. <br />2. Payment for these services will be made from testing and inspection allowances, as <br />authorized by Change Orders. <br />3. Costs for retesting and re-inspecting construction that replaces or is necessitated by work <br />that failed to comply with the Contract Documents will be charged to Contractor. <br />B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are <br />Contractor's responsibility. Perform additional quality-control activities, whether specified or <br />not, to verify and document that the Work complies with requirements. <br />1. Unless otherwise indicated, provide quality-control services specified and those required <br />by authorities having jurisdiction. Perform quality-control services required of Contractor <br />by authorities having jurisdiction, whether specified or not. <br />2. Engage a qualified testing agency to perform quality-control services. <br />a. Contractor shall not employ same entity engaged by Owner, unless agreed to in <br />writing by Owner. <br />3. Notify testing agencies at least 24 hours in advance of time when Work that requires <br />testing or inspection will be performed. <br />4. Where quality-control services are indicated as Contractor's responsibility, submit a <br />certified written report, in duplicate, of each quality-control service. <br />5. Testing and inspection requested by Contractor and not required by the Contract <br />Documents are Contractor's responsibility. <br />6. Submit additional copies of each written report directly to authorities having jurisdiction, <br />when they so direct. <br />C. Retesting/Re-inspecting: Regardless of whether original tests or inspections were Contractor's <br />responsibility, provide quality-control services, including retesting and re-inspecting, for <br />construction that replaced Work that failed to comply with the Contract Documents. <br />D. Testing Agency Responsibilities: Cooperate with Architect, Commissioning Authority and <br />Contractor in performance of duties. Provide qualified personnel to perform required tests and <br />inspections. <br />1. Notify Architect, Commissioning Authority, and Contractor promptly of irregularities or <br />deficiencies observed in the Work during performance of its services.