My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />CLOSEOUT PROCEDURES 017700 - 5 <br />F. Provide additional copies of each warranty to include in operation and maintenance manuals. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or <br />fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous <br />to health or property or that might damage finished surfaces. <br />PART 3 - EXECUTION <br />3.1 FINAL CLEANING <br />A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply <br />with local laws and ordinances and Federal and local environmental and antipollution <br />regulations. <br />B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each <br />surface or unit to condition expected in an average commercial building cleaning and <br />maintenance program. Comply with manufacturer's written instructions. <br />1. Complete the following cleaning operations before requesting inspection for certification <br />of Substantial Completion for entire Project or for a designated portion of Project: <br />a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, <br />including landscape development areas, of rubbish, waste material, litter, and other <br />foreign substances. <br />b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other <br />foreign deposits. <br />c. Rake grounds that are not planted, mulched, or paved to a smooth, even-textured <br />surface. <br />d. Remove tools, construction equipment, machinery, and surplus material from <br />Project site. <br />e. Remove snow and ice to provide safe access to building. <br />f. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, <br />free of stains, films, and similar foreign substances. Avoid disturbing natural <br />weathering of exterior surfaces. Restore reflective surfaces to their original <br />condition. <br />g. Remove debris and surface dust from limited access spaces, including roofs, <br />plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces. <br />h. Sweep concrete floors broom clean in unoccupied spaces. <br />i. Vacuum carpet and similar soft surfaces, removing debris and excess nap; clean <br />according to manufacturer's recommendations if visible soil or stains remain.
The URL can be used to link to this page
Your browser does not support the video tag.