My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />COMMON WORK RESULTS FOR ELECTRICAL 260500 - 1 <br />SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Electrical equipment coordination and installation. <br />2. Sleeves for raceways and cables. <br />3. Sleeve seals. <br />4. Grout. <br />5. Common electrical installation requirements. <br />1.3 DEFINITIONS <br />A. EPDM: Ethylene-propylene-diene terpolymer rubber. <br />B. NBR: Acrylonitrile-butadiene rubber. <br />1.4 SUBMITTALS <br />A. Product Data: For sleeve seals. <br />1.5 COORDINATION <br />A. Coordinate arrangement, mounting, and support of electrical equipment: <br />1. To allow maximum possible headroom unless specific mounting heights that reduce <br />headroom are indicated. <br />2. To provide for ease of disconnecting the equipment with minimum interference to other <br />installations. <br />3. To allow right of way for piping and conduit installed at required slope. <br />4. So connecting raceways, cables, wireways, cable trays, and busways will be clear of <br />obstructions and of the working and access space of other equipment. <br />B. Coordinate installation of required supporting devices and set sleeves in cast -in-place concrete, <br />masonry walls, and other structural components as they are constructed.
The URL can be used to link to this page
Your browser does not support the video tag.