My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />FINISH GRADING 312219 - 3 <br />be responsible for repairing these areas to a condition equal to their original condition, <br />and in so doing shall prevent further drainage problems from occurring. <br />I. Toe of slope: To prevent soil creep or erosion across pavement, where pavement (walk, curb, <br />etc.) is at the toe of a slope, finish grade is to level out or swale slightly at least 6” before <br />reaching pavement. <br />J. Moisture Content: The soil shall not be worked when the moisture content is so great that <br />excessive compaction occurs, nor when it is so dry that dust may form in the air or that clods do <br />not break readily. Water may be applied, if necessary, to provide moisture content for tilling and <br />planting operations. It is the Contractor’s responsibility to control dust that is spread as a result <br />of grading operations. <br />K. Grades: The finish grade in areas to be planted with turf shall be 2 inches below grade of <br />adjacent pavement and walks unless shown otherwise on landscaping plans and details. <br />L. Compaction: Soils in planted areas shall be loose and friable, yet firm enough that no settling <br />occurs from normal foot traffic or irrigation. <br />3.4 FIELD OBSERVATION <br />M. It is the Contractor's responsibility to contact the Architect 48 hours or two working days in <br />advance of each agreed observation or conference. <br />N. Schedule for On-Site Reviews: at completion of finish grading and prior to any planting <br />operations. <br /> <br />END OF SECTION 312219 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.