Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />FINISH GRADING 312219 - 3 <br />be responsible for repairing these areas to a condition equal to their original condition, <br />and in so doing shall prevent further drainage problems from occurring. <br />I. Toe of slope: To prevent soil creep or erosion across pavement, where pavement (walk, curb, <br />etc.) is at the toe of a slope, finish grade is to level out or swale slightly at least 6” before <br />reaching pavement. <br />J. Moisture Content: The soil shall not be worked when the moisture content is so great that <br />excessive compaction occurs, nor when it is so dry that dust may form in the air or that clods do <br />not break readily. Water may be applied, if necessary, to provide moisture content for tilling and <br />planting operations. It is the Contractor’s responsibility to control dust that is spread as a result <br />of grading operations. <br />K. Grades: The finish grade in areas to be planted with turf shall be 2 inches below grade of <br />adjacent pavement and walks unless shown otherwise on landscaping plans and details. <br />L. Compaction: Soils in planted areas shall be loose and friable, yet firm enough that no settling <br />occurs from normal foot traffic or irrigation. <br />3.4 FIELD OBSERVATION <br />M. It is the Contractor's responsibility to contact the Architect 48 hours or two working days in <br />advance of each agreed observation or conference. <br />N. Schedule for On-Site Reviews: at completion of finish grading and prior to any planting <br />operations. <br /> <br />END OF SECTION 312219 <br /> <br /> <br />