GENERAL NOTES
<br />1. REFER TO ADDITIONAL NOTES ON SHEET T0.001.
<br />2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
<br />NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
<br />WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
<br />ARCHITECT.
<br />3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
<br />THAT ARE TO REMAIN.
<br />4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED WALL,
<br />U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY
<br />THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
<br />ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
<br />5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
<br />REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
<br />ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
<br />THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
<br />6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE NOT
<br />BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON THE
<br />EXTERIOR OF THE BUILDING.
<br />7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE WINDOWS.
<br />COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY MEASURES IN PLACE
<br />ON SITE.
<br />8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS ARE
<br />TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
<br />9. PREP AND PAINT ALL PLASTER WALLS. PATCH AND REPAIR AREAS AS REQUIRED, FOR COST
<br />ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING. REPAIR ANY DAMAGED OR MISSING
<br />MOLDINGS TO MATCH ADJACENT PROFILE.
<br />10. (E) TRUSSES AND NEW CEILING AND ROOF FRAMING SHOWN FOR REFERENCE ONLY. REFER TO
<br />STRUCTURAL DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E) CONDITIONS TO BE FIELD
<br />VERIFIED.
<br />11. MECHANICAL EQUIPMENT, LIGHT FIXTURES AND UTILITY LOCATIONS TO BE COORDINATED IN THE
<br />FIELD WITH (E) TRUSSES AND NEW FRAMING.
<br />LEGENDKEYNOTES
<br />xx
<br />00
<br />WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
<br />DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
<br />LIGHT FIXTURE TAG, REFER TO SHEET A1.20 FOR FIXTURE SCHEDULE Fx
<br />AREA OF DEMO
<br />AREA OF PATCH AND/OR REPAIR, REFER TO KEYNOTE
<br />NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
<br />2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
<br />EXISTING WOOD STUD WALL TO REMAIN
<br />-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
<br />-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
<br />123
<br />10' - 2"02-11 02-10
<br />02-20
<br />02-07
<br />02-0102-01
<br />02-2802-12
<br />TYP.
<br />02-17
<br />06 07
<br />16
<br />TYP.
<br />02-47
<br />FINISH FLOOR
<br />0"
<br />1
<br />A3.00
<br />8 9
<br />07
<br />16
<br />2
<br />A3.00
<br />123
<br />10' - 2"09-01
<br />17
<br />08-05
<br />08-06
<br />09-0409-04
<br />F9
<br />F10
<br />TYP.
<br />05-08
<br />TYP.
<br />09-03
<br />09-06
<br />BEHIND HVAC UNIT
<br />09-02
<br />23-03
<br />23-07
<br />26-02
<br />23-08
<br />EQ EQ
<br />11
<br />'
<br />
<br />-
<br />
<br />6
<br />"
<br />1' - 4"
<br />7'
<br />
<br />-
<br />
<br />6
<br />"
<br />(E
<br />)
<br />
<br />1
<br />6
<br />'
<br />
<br />-
<br />
<br />2
<br />"
<br />
<br />V
<br />I
<br />F
<br />1 2 3
<br />02-06
<br />02-26
<br />02-16
<br />02-14
<br />02-1502-14
<br />02-15
<br />02-27
<br />26
<br />03
<br />1
<br />02-47
<br />FINISH FLOOR
<br />0"
<br />1
<br />A3.00
<br />0201 03
<br />E N G I N E C O M P A N Y N 48"0
<br />2
<br />A3.00
<br />1 2 3
<br />TYP.
<br />07-04
<br />07-08
<br />TYP.
<br />07-04
<br />07-08
<br />07-05
<br />07-05
<br />7'
<br />
<br />-
<br />
<br />0
<br />"
<br />EQ EQ
<br />4'
<br />
<br />-
<br />
<br />6
<br />"
<br />1
<br />F9
<br />26 BEHIND GRILLE
<br />10-02
<br />10-03
<br />05-05
<br />09-05
<br />TYP.
<br />09-03
<br />10-01
<br />F9 F9
<br />02-47
<br />13
<br />A5.05
<br />13
<br />A5.05
<br />10
<br />'
<br />
<br />-
<br />
<br />3
<br />"
<br />
<br />T
<br />Y
<br />P
<br />.
<br />6"
<br />(E
<br />)
<br />
<br />2
<br />0
<br />'
<br />
<br />-
<br />
<br />1
<br />1
<br />"
<br />,
<br />
<br />V
<br />I
<br />F
<br />,
<br />
<br />T
<br />O
<br />P
<br />
<br />O
<br />F
<br />
<br />R
<br />O
<br />O
<br />F
<br />Scale
<br />Project number
<br />Date
<br />Drawn by
<br />Jen Dunbar, AIA
<br />phone: 310.435.3928
<br />12314 La Maida Street
<br />Valley Village, CA 91607
<br />jen@dunbararchitecture.com
<br />DUNBAR
<br />ARCHITECTURE
<br />JD/AP
<br />1/4" = 1'-0"
<br />4/
<br />7
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />9
<br />:
<br />2
<br />1
<br />:
<br />3
<br />9
<br />
<br />P
<br />M
<br />A2.00
<br />EXTERIOR
<br />ELEVATIONS
<br />23004
<br />CYPRESS CENTER
<br />RESTORATION
<br />CITY OF SANTA ANA
<br />1/17/2025
<br />625 S. CYPRESS AVE.
<br />SANTA ANA, CA 92701
<br />1/4" = 1'-0"A2.00
<br />1 EAST ELEVATION - EXISTING/DEMO
<br />1/4" = 1'-0"A2.00
<br />2 EAST ELEVATION - REAR - PROPOSED
<br />1/4" = 1'-0"A2.00
<br />3 WEST ELEVATION - FRONT - EXISTING/DEMO
<br />1/4" = 1'-0"A2.00
<br />4 WEST ELEVATION - FRONT - PROPOSED
<br />02-01 DEMO (E) NON-ORIGINAL CARPORT STRUCTURE AND SLAB
<br />02-06 DEMO INFILL AT ORIGINAL OPENINGS
<br />02-07 (E) WINDOW TO BE RESTORED, PROTECT AS REQUIRED; REFER TO A6.00 WINDOW SCHEDULE AND
<br />A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION
<br />02-10 (E) DOOR OPENING TO REMAIN, REFER TO A1.00 FOR NEW DOOR OR WINDOW REPLACEMENT
<br />02-11 (E) NON-HISTORIC DOOR OPENING IN ORIGINAL WINDOW OPENING TO BE INFILLED
<br />02-12 DEMO PORTION OF WALL FOR RELOCATED SALVAGED WINDOWS
<br />02-14 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED; PROTECT (E) SHEATHING
<br />IN PLACE; REFER TO A1.10 FOR ADDITIONAL SCOPE
<br />02-15 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS
<br />AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL
<br />MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S
<br />STANDARDS FOR REHABILITATION
<br />02-16 (E) CONDUCTOR HEAD AND DOWNSPOUT TO BE SALVAGED, CLEANED AND RESTORED; IF
<br />DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS
<br />POSSIBLE
<br />02-17 DEMO (E) PARAPET CAP
<br />02-20 (E) ORIGINAL WINDOW OPENING FRAMING TO REMAIN FOR RELOCATED WINDOW, ORIGINAL
<br />WINDOW MISSING
<br />02-26 (E) UPPER DOWNSPOUT AND CONDUCTOR HEAD TO BE SALVAGED, CLEANED AND RESTORED;
<br />LOWER DOWNSPOUT IS MISSING; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS
<br />SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE
<br />02-27 ORIGINAL WOOD ARCHED WINDOW AND DOOR DAMAGED BEYOND REPAIR, REMOVE MATERIAL
<br />AND SALVAGE FOR REFERENCE; REBUILD NEW TO MATCH ORIGINAL
<br />02-28 AREA IS MISSING WOOD SHEATHING AND PLASTER FINISH; CURRENTLY THE AREA IS COVERED
<br />WITH VANDAL PROTECTION
<br />02-47 (E) PLASTER DETAIL TO REMAIN, PATCH AND REPAIR AS REQUIRED
<br />05-05 REPAIR AND RESTORE ORIGINAL DECORATIVE WROUGHT IRON WINDOW GRILLE
<br />05-08 PARAPET CAP
<br />07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD
<br />SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE
<br />SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR
<br />BLEND AND INSTALL NEW BIRD STOPS AT END TILES
<br />07-05 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS CLOSE
<br />AS POSSIBLE
<br />07-08 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS
<br />AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL
<br />MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S
<br />STANDARDS FOR REHABILITATION; INSTALL NEW METAL MESH DEBRIS COVER
<br />08-05 RELOCATED SALVAGED WINDOW SET FROM SOUTH ELEVATION
<br />08-06 RELOCATED SALVAGED WINDOW FROM NORTH ELEVATION
<br />09-01 REPAIR AND PATCH (E) WALL STUDS, 1x6 SHEATHING AND PLASTER WALL FINISH; ALL NEW
<br />MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS POSSIBLE; REFER TO STRUCTURAL DRAWINGS
<br />FOR REPAIR DETAIL
<br />09-02 PATCH AND REPAIR PLASTER FINISH, ALL NEW MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS
<br />POSSIBLE IN FINISH AND TEXTURE
<br />09-03 (E) PLASTER WALL FINISH TO REMAIN, PROTECT IN PLACE; PATCH AND REPAIR AREAS AS
<br />REQUIRED, FOR COST ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING; ALL AREAS TO BE
<br />PAINTED
<br />09-04 AREA OF CARPORT DEMO STRUCTURAL ATTACHMENT; PATCH AND REPAIR PLASTER FINISH, ALL
<br />NEW MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS POSSIBLE IN FINISH AND TEXTURE
<br />09-05 CLEAN AND RESTORE ALL ORIGINAL INLAY TILE
<br />09-06 INFILL WALL AT (E) DOOR OPENING, MATCH ADJACENT PROFILE AND TEXTURE, INCLUDING
<br />PLASTER BASE
<br />10-01 SIGNAGE, PAINTED METAL DIMENSIONAL PIN LETTERS, TO MATCH ORIGINAL
<br />10-02 ADDRESS NUMBERS
<br />10-03 4" x 5" HISTORIC DESIGNATION MARKER PER CITY OF SANTA ANA STANDARDS
<br />23-03 HVAC CONDENSING UNIT, FLOOR MOUNTED TO 6" CONCRETE HOUSEKEEPING PAD, REFER TO
<br />MECHANICAL & STRUCTURAL DWGS.
<br />23-07 HVAC CONDENSING UNIT, WALL MOUNTED, REFER TO MECHANICAL AND STRUCUTRAL DWGS.
<br />23-08 EXHAUST FAN, REFER TO MECHANICAL DRAWINGS
<br />26-02 MAIN METER/ MAIN DISTRIBUTION PANELBOARD MOUNTED TO 4" CONCRETE HOUSEKEEPING PAD,
<br />REFER TO ELECTRICAL AND STRUCTURAL DRAWINGS
<br />No. Description Date
<br />DESIGN DEVELOPMENT 1/12/2024
<br />75% CD 3/15/2024
<br />90% CD 5/14/2024
<br />PERMIT SET 5/17/2024
<br />OCFA SUBMITTAL 9/26/2024
<br />BACKCHECK SET 1/17/2024
<br />BACKCHECK SET_V2 4/8/2025
|