My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 6 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 6 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 1:27:25 PM
Creation date
2/25/2026 1:26:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Public Library Renovation <br />Group 4 Architecture Research + Planning, Inc.Smith, Fause & McDonald Inc. <br />Group 4 Project No. 22575-01 Conform Set – August 2, 2024Bid Set Addendum-03 – June 05 <br />INTEGRATED AUDIOVISUAL SYSTEMS AND EQUIPMENT SECTION 27 4116-67 <br />C.Provide a permanent label on the front of each equipment rack including the rack <br />designation, and the circuit breaker number and associated electrical distribution panel <br />designation servicing same. <br />D.Maintain separation of wiring classifications as specified herein. Separately dress, route and <br />land microphone and line level cables and related on the right side of the equipment <br />enclosure, as viewed from the rear; dress, route, and land loudspeaker level and control <br />cables on the left side of the equipment enclosure, as viewed from the rear. <br />E.Access shall not require demounting or de-energizing of equipment. Install access covers, <br />hinged panels, or pull-out drawers to insure complete access to terminals and interior <br />components. <br />F.Fasten removable covers containing any wired component with a continuous hinge along one <br />side, with associated wiring secured and dressed to provide an adequate service loop. <br />Provide an appropriate stop locks to hold all hinged panels and drawers in a serviceable <br />position. <br />G.Provide permanent labels for all equipment and devices. Where possible, fasten such labels <br />to the rack frame or to blank or vent panels which will remain in place when active equipment <br />is removed for possible service. <br />H.At jackfields, provide service loop to permit removal of jackfields from rack sufficient to <br />conveniently access all jack contacts for routine cleaning and maintenance. Organize the <br />service loop and harness such that reasonable reconnection of jacks and jack normals is <br />possible without cutting apart the harness. <br />I.Coordinate the design and execution of wire harnessing of multi-bay rack ensembles with <br />conditions of delivery to installation locations at Project Site, and with the requirement herein <br />for test of the completely wired system in the shop prior to delivery to the Project Site. <br />Organize the wiring harnesses such that they will fold within one shippable unit without risk of <br />damage, or provide polarized multipin connectors and related interconnect systems as <br />specified elsewhere herein. <br />J.At each equipment backboard, provide UL Listed surge suppressing multi-outlet assembly <br />with at least six (6) receptacles. <br />3.9 EQUIPMENT RACK AND EQUIPMENT TESTING AND ADJUSTING PROCEDURES <br />A.Conduct procedures in fabrication shop. Verify safe and proper operation of all components, <br />devices, or equipment, establish nominal signal levels within the systems and verify the <br />absence of extraneous or degrading signals. Make all preliminary adjustments and <br />document the setting of all controls, parameters of all corrective networks, voltages at key <br />system interconnection points, gains and losses, as applicable. Submit test report. Request <br />and coordinate verification of submitted test data by the City's Representative. Correct all <br />non-conforming conditions prior to shipment to Project Site. Perform at least the following <br />procedures: <br />B.Preliminary: Verify: <br />1.Grounding of devices and equipment. Integrity of signal and electrical system ground <br />connections. <br />2.Proper provision of power to devices and equipment. <br />3.Integrity of all insulation, shield terminations and connections. <br />4.Integrity of soldered connections. Absence of solder splatter, solder bridges. <br />5.Absence of debris of any kind, tools, etc.
The URL can be used to link to this page
Your browser does not support the video tag.