My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 6 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 6 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 1:27:25 PM
Creation date
2/25/2026 1:26:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Public Library Renovation <br />Smith, Fause & McDonald Inc.Group 4 Architecture Research + Planning, Inc. <br />Conform SetASI #026 – August 72, 20254 Group 4 Project No. 22575-01 <br />SECTION 27 4116-68 INTEGRATED AUDIOVISUAL SYSTEMS AND EQUIPMENT <br />6.Routing and dressing of wire and cable. <br />7.All wiring, including polarity and continuity, including conformance with wire <br />designations on running sheets, field and shop drawings. <br />8.Mechanical integrity of all support provisions. <br />C.Rig temporary power and grounding. Comply with all applicable Codes, regulations and <br />ordinances. <br />D.Determine the proper sequence of energizing systems to minimize the risk of damage. <br />Energize. Burn in for at least 168 hours. <br />E.Sound Systems: <br />1.Gain control settings: Establish tentative normal settings for all gain controls. Set all <br />equalizers flat. Set all automatic gain control devices to bypass. Terminate power <br />amplifier outputs with power load resistors with resistance value within 10% the <br />nominal output impedance of the respective amplifier. Adjust all gain controls on <br />equipment for optimum signal-to-noise ratio and signal balance and, unless they are <br />sub-panel mounted, cap them to prevent tampering. Unless specified or directed <br />otherwise, adjust gains such that in a given system the "front end" operates at unity <br />gain and maintains 10 dB of clip margin referenced to the first onset of clipping of the <br />associated power amplifier(s). Measure and document system gains at 1 kHz. <br />Settings may require further adjustment by the Contractor, a result of testing by the <br />City's Representative. <br />2.Freedom from parasitic oscillation and radio frequency pickup: Maintain previous <br />setup. Set up for each mode of operation specified in the functional requirements; <br />verify that all systems are free from spurious oscillation and radio-frequency pickup <br />using broadband oscilloscope. Correct any such defects. <br />3.Hum and noise level/signal to noise level/signal to crosstalk level: Maintain previous <br />setup. Terminate microphone and line-level inputs with shielded resistors of 150 and <br />600 ohms, respectively. Set available variable gain controls such that full power <br />amplifier output would be achieved with -40 dBm input level at a microphone input <br />and +12 dBm at a line-level input. Measure and document the specified parameters <br />of the system overall for each microphone input channel and line-level input channel. <br />Compare with nominal signal level. <br />4.Total Harmonic Distortion: Maintain previous setup. Measure at reference operating <br />level at least at 63 Hz, 125 Hz, 1 kHz, 10 kHz. <br />F.Baseband Video Systems: <br />1.Picture Monitors: <br />a.Apply crosshatch. Verify linearity. <br />b.Apply red field. Adjust purity. <br />c.Apply SMPTE bars and PLUGE. Adjust to standards. <br />2.Video Path Test: Use manufacturer's procedures. Use full field or line signals. <br />G.Data/Graphics Systems: <br />1.Projector: <br />a.Apply crosshatch. Converge at design distance. Verify linearity. <br />b.Apply red, green and blue field. Adjust purity. <br />2.Wideband Component Analog Video Path Test: Use manufacturer's procedures. <br />H.Control System: <br />1.Demonstrate complete operation. <br />3.10 PROJECTION SCREEN INSTALLATION
The URL can be used to link to this page
Your browser does not support the video tag.