Laserfiche WebLink
<br /> <br /> Page 29 of 111 <br /> <br />Report No.: 2410B0143SHA-001 <br /> <br />TRF No. ANSI/CAN/UL 9540A_Unit <br /> <br />ANSI/CAN/UL 9540A <br />Clause Requirement – Test Result - Remark Verdict <br /> <br /> <br />If intended for outdoor use only installations, the smoke <br />release rate, the convective and chemical heat release <br />rate and content, velocity and temperature of the <br />released vent gases need not be measured. <br /> N/A <br />9.3.3 Test samples shall be installed as shown in Figure 9.2 <br />in proximity to an instrumented wall section. <br />(instrumented wall size and <br />construction, see equipment list) <br />See attachment 3 <br />Pass <br /> <br />The sample shall be mounted on a support substrate <br />and spaced from the wall in accordance with the <br />minimum separation distances specified by the <br />manufacturer. <br />(see photo documentation for <br />sample installation set up) <br />Complied <br />Pass <br /> <br />Exception: If the manufacturer requires installation <br />against non-flammable material, the test setup may <br />include manufacturer recommended backing material <br />between the unit and plywood wall. <br />Not specified by manufacturer N/A <br />9.3.4 <br />Target BESS shall be installed on each side of the <br />initiating BESS and keep the min. separation <br />disctances specified by the manufacturer. <br />See attachment 3 <br />Target BS was installed on right <br />side of the initiating BS. <br />Two more instrumented walls <br />were used to represented for <br />target BESS on other two sides of <br />the initiating BS. <br />The min. separation disctances <br />were specified by the <br />manufacturer. <br />Pass <br />9.4 Test Method – Indoor wall mounted units -- <br />9.4.1 <br />Testing of indoor wall mounted BESS shall be in <br />accordance with Section 9.2, except as modified <br />in this section. <br />(see Figure 9.3) N/A <br />9.4.2 Conduct testing in a standard NFPA 286 fire test room <br />(12 x 8 x 8-ft) high, with a 2-1/2 x 7-ft high opening. N/A <br />9.4.2.1 <br />BESS intended for residential installations only may be <br />tested using instrumented wall sections not less than <br />2.44m (8-ft) in height & width instead of the test room. <br />(added by UL CRD-2020.10.21) N/A <br />9.4.3 <br />The initiating BESS unit shall be positioned on the wall <br />opposite of the door opening, with the center located 4 - <br />ft above the floor, and halfway between adjacent walls. <br /> N/A <br />9.4.3.1 <br />When residential BESS are tested in accordance with <br />9.4.2.1, the initiating BESS unit shall be positioned with <br />the center located 1.22m (4-ft) above the floor, and <br />halfway between adjacent walls. <br />(added by UL CRD-2020.10.21) N/A