My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2120 3%4 S Bristol St WCC02 - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bristol St
>
2120 3/4 S Bristol St Unit# WCC02
>
2120 3%4 S Bristol St WCC02 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 5:00:12 AM
Creation date
4/17/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20188147
Full Address
2120 3/4 S Bristol St Unit# WCC02
Street Number
2120
Partial
3/4
Street Direction
S
Street Name
Bristol
Street Suffix
St
Unit Number
WCC02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> Page 30 of 111 <br /> <br />Report No.: 2410B0143SHA-001 <br /> <br />TRF No. ANSI/CAN/UL 9540A_Unit <br /> <br />ANSI/CAN/UL 9540A <br />Clause Requirement – Test Result - Remark Verdict <br />9.4.4 <br />Target BESS shall be installed on the wall on each <br />side of the initiating BESS, at the same height above <br />the floor as the initiating BESS. <br />(keep the min. physical spacing <br />between BESS units specified by <br />the manufacturer) <br />N/A <br />9.4.5 The wall on which the initiating and target BESS units <br />are mounted shall be instrumented. N/A <br />9.4.6 <br />For residential use systems, the gas collection data <br />gathered in 9.2 shall be compared to the smallest room <br />installation specified by the manufacturer to determine <br />if the flammable gas collected exceeds 25% LFL in air. <br />(gas collection methods per <br />clause 9.2) N/A <br />9.4.7 For residential use BESS, the DUT shall be covered <br />with a single layer of cheese cloth ignition indicator. (see equipment list) N/A <br />9.4.8 When testing BESS for residential only installations, <br />the criteria in 9.2.9. 9.2.18 and 9.2.19 may be waived. (added by UL CRD-2020.10.21) N/A <br />9.5 Test Method – Outdoor wall mounted units -- <br />9.5.1 <br />Testing of outdoor wall mounted BESS shall be in <br />accordance with Section 9.2, except as modified <br />in this section. <br />(see Figure 9.4) N/A <br /> <br />If intended for outdoor use only wall mount <br />installations, the smoke release <br />rate, the convective and chemical heat release rate; <br />and the content, velocity and temperature of the <br />released vent gases need not be measured. <br /> N/A <br />9.5.2 Test samples shall be mounted on an instrumented <br />wall (undersurface of the eave shown in Figure 9.4). N/A <br />9.5.3 <br />The initiating BESS unit shall be positioned on the <br />instrumented wall, with its center located 4-ft above the <br />floor, and halfway between wall edges. <br /> N/A <br />9.5.4 <br />Target BESS shall be installed on the wall on each <br />side of the initiating BESS, at the same height <br />above the floor as the initiating BESS and keep the <br />min. separation distances specified by the <br />manufacturer. <br /> N/A <br />9.5.5 The wall on which the initiating and target BESS units <br />are mounted shall be instrumented. (see clause 9.2) N/A <br />9.5.6 For residential use BESS, the DUT shall be covered <br />with a single layer of cheese cloth ignition indicator. (see testing equipment list) N/A <br />9.6 Rooftop and open garage installations -- Pass <br />9.6.1 <br />Testing of BESS intended for non-residential use <br />rooftop or open garage installations shall be in <br />accordance with 9.2. <br />Complied <br />(see clause 9.2) Pass <br />9.6.2 <br />If intended for rooftop and open garage use only <br />installations, the smoke release rate, the <br />convective and chemical heat release rate and content, <br />velocity and temperature of the released vent <br />Measured Pass
The URL can be used to link to this page
Your browser does not support the video tag.