PIPE SUPPORT SCHEDULE <br />1/2 <br />NOMINAL PIPE <br />DIAMETER <br />NPS (IN) <br />3/4 <br />1 <br />1 1/4 <br />1 1/2 <br />2 <br />2 1/2 <br />3 <br />4 <br />6 <br />8 <br />10 <br />12 <br />MAXIMUM SUPPORT SPACING <br />(FEET) <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />CAST IRON <br />9 <br />12 <br />13 <br />14 <br />15 <br />17 <br />21 <br />24 <br />26 <br />30 <br />9 <br />COPPER <br />8 <br />12 <br />5 <br />5.5 <br />6 <br />7 <br />7 <br />7.5 <br />8.5 <br />9 <br />10 <br />11.5 <br />5.5 <br />SCH 40 PVC <br />- <br />6 <br />60°F <br />5 <br />5.5 <br />6 <br />7 <br />7 <br />7.5 <br />8.5 <br />9.5 <br />10.5 <br />11.5 <br />5.5 <br />5 <br />6 <br />73°F <br />SCH 40 CPVC <br />5 <br />5.5 <br />6 <br />6.5 <br />7 <br />7.5 <br />8 <br />9.5 <br />10.5 <br />10.5 <br />5.5 <br />4.5 <br />5.5 <br />100°F <br />4.5 <br />5.5 <br />5.5 <br />6.5 <br />7 <br />7 <br />7.5 <br />8.5 <br />9.5 <br />10 <br />5 <br />4.5 <br />5.5 <br />120°F <br />4 <br />5 <br />5 <br />6 <br />6 <br />6.5 <br />7 <br />7.5 <br />8 <br />8.5 <br />4.5 <br />4 <br />5 <br />140°F <br />1.SUPPORT SPACING ABOVE IS FOR STRAIGHT HORIZONTAL PIPE. PROVIDE SUPPORTS ON EACH SIDE OF <br />ELBOWS, FLANGES, VALVES, SPECIALTIES, ETC. <br />2.ALL PIPING SUPPORTS, THREADED ROD SIZES AND HANGERS SHALL BE PER MSS SP-69 <br />7 <br />10 <br />11 <br />12 <br />12 <br />12 <br />12 <br />12 <br />12 <br />STEEL <br />9 <br />TABLE TO CALCULATE SUPPLY FIXTURE UNITS <br />PLUMBING FIXTURE <br />SUPPLY <br />FIXTURE <br />UNITS <br />NUMBER OF <br />FIXTURES <br />TOTAL SUPPLY <br />FIXTURE UNITS <br />WATER CLOSET FLUSH TANK 5.0 1 5.0 <br />LAVATORY 2.0 1 2.0 <br />HAND SINKS 2.0 2 4.0 <br />MOP SINK 3.0 1 3.0 <br />3 COMPARTMENT SINK (S-1)4.0 1 4.0 <br />POT FILLER 0.5 1 .5 <br />TOTAL SUPPLY FIXTURE <br />UNITS 18.50 <br />WATER PIPE SIZE= 1" <br />TABLE TO CALCULATE DRAINAGE FIXTURE UNITS <br />PLUMBING FIXTURE <br />DRAINAGE <br />FIXTURE <br />UNITS <br />NUMBER OF <br />FIXTURES <br />TOTAL DRAINAGE <br />FIXTURE UNITS <br />WATER CLOSET FLUSH TANK 4 1 4 <br />LAVATORY 2 1 2 <br />HAND SINKS 2 2 4 <br />MOP SINK 3 1 3 <br />3 COMPARTMENT SINK (S-1)5 1 5 <br />POT FILLER 2 1 2 <br />TOTAL DRAINAGE <br />FIXTURE UNITS 20 <br />SANITARY WASTE SIZE= 4" <br />VOLT/PHASEMFRMARKMODELSTORAGE HEAT INPUT REMARKS <br />WATER HEATER SCHEDULE <br />1: SET WATER HEATER TEMPERATURE TO 140°f. <br />2:CONSULT MANUFACTURER PRIOR TO PURCHASE FOR EXACT MODEL AND ALL ACCESSORIES <br />FOR A COMPLETE SYSTEM. <br />3:CONFIRM MBH WITH PLUMBING CONTRACTOR PRIOR TO PURCHASE AND ROUGH IN. <br />WH-1 RINNAI INSTANTANEOUS 120/1 199 1,2,3 <br />SAN. <br />RESTROOM FIXTURES <br />MARK FIXTURE VENT C.W.MANUFACTURERH.W.MODEL#VALVE MFG GPM/GPF REMARKS <br />VALVE MODEL # <br />BATTERY MANUAL <br />L-1 2"2"1/2"1/2"WALL HUNG LAVATORY <br />WITH CONCEALED ARM <br />FLOOR PEDESTAL CARRIER <br />ADA COMPLIANT <br />TOTO <br />KOHLER <br />GERBER <br />LT-307 <br />K-2007-0 <br />12-654 <br />TOTO <br />KOHLER <br />DELTA <br />SLOAN <br />K-13466 <br />TEL145 <br />K-15198 <br />631TP320 22C1 <br />EFX250 <br />ADDITIONAL REMARKS <br />1.ANGLE STOPS SHALL BE LOOSE KEYED WITH INTEGRAL CHECK VALVE. MCGUIRE LFCK SERIES OR EQUIVALENT. <br />2.ALL ADA ACCESSIBLE SINKS PTRAP AND DRAIN PIPING SHALL BE PROVIDED WITH MCGUIRE PREWRAPPED PW2125 SERIES OR EQUIVALENT. ALL SUPPLIES SHALL BE <br />TRUEBRO LAVGUARDS OR EQUIVALENT. WATCO IDEALLAV LAV DRAIN GRID DRAIN WITH INTERNAL STOPPER WITH P-TRAP WRAPPED IN TRUEBRO LAV GAURD IS <br />ACCEPTABLE ALTERNATE. <br />MARK QTY DESCRIPTION PROV. BY <br />OTHERS <br />PROV. BY <br />KITCHEN <br />PROV. BY <br />G.C. <br />PROV. BY <br />TENANT EQUIPMENT REMARKS <br />7 24" x 24" MOP SINK, FIAT MODESTO ●w/ HOSE AND HOSE HANGER <br />7.1 FAUCET, SERVICE SINK ● <br />1 <br />1 <br />20 SINK, SCULLERY, 3 COMPARTMENTS ●120" (24" DRAIN BOARD EACH SIDE) <br />20.2 ADD ON FAUCET FOR 3 COMPARTMENT <br />SINK ●INSTALLED BY GENERAL CONTRACTOR <br />21 HAND SINK, WALL MOUNTED w/ FAUCET ●INSTALLED BY GENERAL CONTRACTOR <br />1 <br />1 <br />2 <br />NOTE: G.C. SUPPLIER TO VERIFY QUANTITIES <br />G.C. IS TO VERIFY ALL EXISTING FIELD CONDITIONS PRIOR TO ORDERING ANY EQUIPMENT SHOWN ON THIS PLAN. IF ANY CONFLICTS ARE FOUND, <br />CONTACT ARCHITECT AND OWNER IMMEDIATELY. CONFLICTING EQUIPMENT IS NOT TO BE ORDERED UNTIL ISSUE IS RESOLVED. <br />ALL EQUIPMENT SHALL BE INSTALLED BY THE EQUIPMENT SUPPLIER UNLESS NOTED OTHERWISE. <br />1. PLUMBING CONTRACTOR SHALL ABIDE BY THE LOCAL CODES AND ORDINANCES. <br />2. PLUMBING CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATIONS AND SIZES OF ALL UTILITIES, INCLUDING THE DEPTHS OF ALL <br />BELOW GRADE SANITARY SEWERS, PRIOR TO START OF WORK. THIS DRAWING IS NOT INTENDED TO INDICATE ALL EXISTING UTILITIES. <br />3. CONTRACTOR SHALL BE FAMILIAR WITH LANDLORD'S STANDARDS, RULES AND REGULATIONS. OBTAIN COPY OF MALL'S CRITERIA <br />PACKAGE AND CONFORM TO ALL REQUIREMENTS. ALL LANDLORD'S CRITERIA SHALL BE COMPILED WITH AND INCLUDED IN THIS BID. <br />4. CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID AND FIELD VERIFY EXISTING CONDITIONS TO ENSURE THAT THE WORK <br />REPRESENTED ON THE DRAWINGS AND IN THESE SPECIFICATIONS CAN BE INSTALLED AS INDICATED. CONTRACTOR SHALL TAKE ALL <br />INTERFERENCES INTO CONSIDERATION. PROVIDE ALL NECESSARY OFFSETS TO SUIT FIELD CONDITIONS AS REQUIRED. <br />5. CONTRACTOR SHALL VERIFY AND COORDINATE ALL UTILITY CONNECTION POINTS, INCLUDING SIZES AND INVERTS WITH EXISTING <br />FIELD CONDITIONS PRIOR TO START OF WORK. <br />6. MAKE ALL UTILITY CONNECTIONS AND INSTALLATIONS IN FULL ACCORDANCE WITH ALL UTILITY REGULATIONS. PROVIDE ALL <br />ADDITIONAL APPURTENANCES AS REQUIRED BY UTILITY COMPANY. THE COMPLETED INSTALLATION SHALL BE IN ACCORDANCE WITH <br />ALL APPLICABLE INDUSTRY STANDARDS OF GOOD PRACTICE AND SAFETY, AND THE MANUFACTURER'S STRICTEST <br />RECOMMENDATIONS FOR EQUIPMENT AND PRODUCT APPLICATION AND INSTALLATION. <br />7. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS RELATED TO THE INSTALLATION OF THE WORK. <br />8. ALL WORK SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES, LAWS, ACTS AND ALL AUTHORITIES HAVING <br />JURISDICTION AND LANDLORD'S CRITERIA. <br />9. MAINTAIN ALL MANUFACTURER'S RECOMMENDED SERVICE CLEARANCES FOR ALL FIXTURES AND EQUIPMENT. REFER TO <br />ARCHITECTURAL PLANS FOR EXACT LOCATIONS OF PLUMBING FIXTURES. <br />10. CUTTING OF ROOF AND FLASHING OF PIPE CURBS, SANITARY VENT THROUGH ROOF, ETC. SHALL BE COORDINATED WITH AND <br />PERFORMED BY LANDLORD'S ROOFING CONTRACTOR, AT THIS CONTRACTOR'S EXPENSE, TO MAINTAIN ROOF WARRANTY. ALL VENT <br />OUTLETS SHALL BE A MINIMUM OF 10'-0" AWAY FROM OR 3'-0" ABOVE ANY AIR INTAKES ON HVAC EQUIPMENT. <br />11. ALL HORIZONTAL FIRE PROTECTION SPRINKLER PIPING AND ALL ABOVE GRADE EXPOSED HORIZONTAL PIPING IS TO BE INSTALLED <br />AS HIGH AS POSSIBLE. <br />12. CONTRACTOR SHALL COORDINATE TIMES TO WORK IN SPECIFIC AREA OF THE EXISTING BUILDING WITH THE BUILDING MANAGER <br />AND WITH THE OCCUPANTS OF THE AREA AFFECTED BY THE WORK. <br />13. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES WITH THE <br />CONTRACT DOCUMENTS BEFORE COMMENCING ANY WORK. <br />14. SLEEVE AND SEAL ALL PIPE PENETRATIONS OF WALLS AND FLOORS. APPLY INTUMESCENT FIRE SAFING COMPOUND AT <br />PENETRATIONS AT FIRE RATED WALLS AND FLOORS, MAINTAINING INTEGRITY AND RATING OF FIRE SEPARATION. SLEEVES THROUGH <br />FLOORS SHALL EXTEND 2" ABOVE FLOOR, BE GROUTED INTO PLACE AND WATERPROOFED. PIPING THROUGH EXTERIOR WALLS SHALL <br />BE SLEEVED AND SEALED WEATHER TIGHT WITH SILICONE CAULK. <br />15. ALL DOMESTIC COLD, HOT AND TEMPERED WATER PIPING TO BE INSULATED WITH RIGID FIBERGLASS INSULATION WITH TYPE "ASJ" <br />JACKET. COLD WATER PIPES TO HAVE 1 <br />2" THICK INSULATION. DOMESTIC HOT AND TEMPERED WATER PIPES TO HAVE 1" THICK <br />INSULATION. <br />16. THE P.C. IS TO INSPECT THE EXISTING SANITARY DRAIN TO VERIFY THAT IT HAS SUFFICIENT DEPTH FOR THE NEW WORK AND TO <br />VERIFY THE DIRECTION OF FLOW. PRESSURE TEST THE EXISTING SANITARY DRAIN PRIOR TO THE START OF WORK. VERIFY THAT <br />SEWER IS ACTIVE BY FLUSHING WITH WATER, A MINIMUM OF FIVE GALLONS PER MINUTE FOR FOUR HOURS PRIOR TO START OF <br />WORK. <br />17. ALL NEW PLUMBING FIXTURES MUST BEAR THE WATERSENSE LABEL. DO NOT REMOVE THE WATERSENSE LABEL PRIOR TO <br />PASSING THE FINAL INSPECTION AND HAVE FIXTURE CUT SHEETS ONSITE FOR FINAL INSPECTION. <br />18. A STACK TEST ON THE WASTE AND VENT MAY BE REQUIRED BY THE PLUMBING INSPECTOR AT THE TIME OF ROUGH INSPECTION <br />AND UNDERGROUND INSPECTIONS. <br />19. 100 PSI AIR TEST OR WATER PRESSURE REQUIRED ON WATER DISTRIBUTION PIPING AT TIMES OF ROUGH INSPECTION. <br />20. ALL EXISTING PLUMBING THAT MAY POSE A HEALTH OR SAFETY HAZARD SHALL BE CORRECTED. <br />CO <br />GCO <br />CD <br />AFF <br />VTR <br />CLEAN OUT <br />PRESSURE REGULATING VALVE (PRV) <br />GRADE CLEAN OUT <br />BALL VALVE <br />CONDENSATE DRAIN PIPING <br />ABOVE FINISHED FLOOR <br />UNION <br />PIPE TURNING UP <br />PIPE TURNING DOWN <br />VENT THROUGH ROOF <br />SANITARY VENT PIPING <br />SANITARY DRAIN PIPING <br />COLD WATER PIPING <br />HOT WATER PIPING (140°F) <br />POINT OF CONNECTION <br />PLUMBING SYMBOLS LEGEND <br />G NATURAL GAS PIPING <br />CHECK VALVE <br />HOT WATER RETURN PIPING <br />UNDERGROUND SANITARY PIPING <br />CA COMPRESSED AIR PIPING <br />BALANCE VALVE <br />45.1 WATER HEATER - TANKLESS EXISTING LOCATION; REFERENCE <br />PLUMBING1● <br /># <br />BACK FLOW PREVENTER ASSEMBLY REQUIREMENTS <br />TYPE OF EQUIP. <br />ON SYSTEM <br />METHOD OF CROSS CONNECTION <br />CONTROL <br />MANUFACTURE AND <br />MODEL NUMBER REMARKS <br />CHEMICAL FEED <br />1. CONTRACTOR SHALL PROVIDE INDIVIDUAL BACKFLOW PREVENTERS FOR EACH PIECE OF EQUIPMENT. <br />2. EACH BACKFLOW PREVENTER MUST HAVE TESTING PORTS. <br />3. BRONZE BODIED BACKFLOW PREVENTERS ARE PERMISSABLE IF ALLOWED BY LOCAL CODES. <br />PLUMBING GENERAL NOTES <br />STAINLESS STEEL REDUCED <br />PRESSURE ZONE ASSEMBLY <br />CU199iN <br />TABLE TO CALCULATE HOT WATER GPM (TANKLESS) <br />INCOMING WATER TEMPERATURE (AVERAGE GROUND WATER TEMP) =55º <br />HOT WATER TEMPERATURE =140º <br />TEMPERATURE RISE =85º <br />PLUMBING FIXTURE <br />TOTAL <br />FIXTURE OR <br />FAUCET GPM <br />MIXED <br />TEMPERATURE <br />HOT WATER <br />GPM PER <br />FIXTURE OR <br />FAUCET <br />NO. OF <br />FIXTURES OR <br />FAUCETS <br />FULL HOT <br />WATER FLOW <br />(GPM) <br />ESTIMATED <br />PERCENT <br />USAGE <br />DESIGNED <br />HOT WATER <br />FLOW <br />(GPM) <br />3-COMP SINK (S-1)2.0 140º2.00 1 2.00 100%2.00 <br />MOP SINK 3.0 140º3.00 1 3.00 0%0.00 <br />LAVATORIES/HAND <br />SINKS 0.5 105º0.29 3 0.88 100%0.88 <br />FULL HOT WATER FLOW FOR ALL FIXTURES RUNNING =5.88 GPM <br />DESIGNED HOT WATER GALLONS PER MINUTE =2.9 GPM <br />2"1-1/2"4"W-1 -FLOOR MOUNTED WATER CLOSET <br />FLUSH VALVE <br />ADA COMPLIANT <br />ELONGATED BOWL <br />TOTO <br />KOHLER <br />GERBER <br />TOTO <br />KOHLER <br />DELTA <br />SLOAN <br />1.28 CT705ULN <br />K-96057 <br />25-733 <br />TMT1NN <br />K-7531 K-13517 <br />TET1GA <br />AEF801 MF700T <br />G2 8111 111 <br />REMARKS <br />1" <br />MFR: J.R. SMITH <br />WATER HAMMER ARRESTER SCHEDULE <br />WHA-A 5005 <br />5010 <br />5020 <br />1-11 <br />12-32 <br />33-60 <br />THREADED NIPPLE CONNECTION <br />TAG <br />1.BRANCH LINE LESS THAN 20 FEET: THE PREFERRED PLACEMENT LOCATION IS AT THE END OF <br />THE BRANCH LINE BETWEEN THE LAST TWO FIXTURES. <br />UP TO 20 FT. <br />FIXTURE (TYP.) <br />"L" <br />3/4" <br />FIXTURE <br />(TYP.) <br />MODEL NO. <br />CONNECTION <br />SIZE <br />FIXTURE <br />UNIT RATING <br />2.BRANCH LINES GREATER THAN 20 FEET: SIZE EACH W.H.A. FOR SUM OF BRANCH W.S.FU., <br />PLACE W.H.A. AS SHOWN. <br />WHA-B <br />WHA-C 1" <br />THREADED NIPPLE CONNECTION <br />THREADED NIPPLE CONNECTION <br />WHA <br />WHA WHA <br />"L/2" <br />2.1 OVEN ●INSTALLED BY GENERAL CONTRACTOR1 <br />2.0 HOOD ●INSTALLED BY GENERAL CONTRACTOR1 <br />CP-1 CIRCULATION PUMP --3/4"3/4"GRUNDFOS ALPHA 15-55 <br />HWR SF/T <br />GAS LOAD SUMMARY <br />SYSTEM DESIGNATION EQUIPMENT MBH <br />PLUMBING DWH-1 WATER HEATER 199 <br />KITCHEN LBC MODEL <br />LRG-2G4 OVEN 290 <br />TOTAL NATURAL GAS CONNECTED LOAD 489 <br />GAS METER <br />REQUIREMENTS <br />MBH CAPACITY 489 <br />TOTAL DEVELOPED LENGTH <br />INCLUDING EQUIVALENT PIPE LENGTH <br />FOR FITTING AND VALVE FRICTION <br />LOSSES TO GAS METER. <br />77 FT X <br />1.2 104 FT <br />CONSULT GAS UTILITY COMPANY FOR <br />REGULATOR RATING <br />SANITARY SEWER PIPING SHOWN ON DRAWINGS IS DIAGRAMMATIC AND MAY DIFFER SLIGHTLY <br />FROM ACTUAL FIELD CONDITIONS. PLUMBING CONTRACTOR (PC) SHALL COORDINATE WITH <br />EXISTING FIELD CONDITIONS VIA A SANITARY VIDEO SURVEY/SCOPE TO DETERMINE THE EXACT <br />SIZE, LOCATION, INVERT ELEVATIONS AT THE PROPOSED CONNECTIONS TO EXISTING PLUMBING <br />SERVICES PRIOR TO CONSTRUCTION. IF ACTUAL FIELD FINDINGS VARY SIGNIFICANTLY FROM <br />THOSE AS INDICATED ON PLANS, PC SHALL NOTIFY GENERAL CONTRACTOR (GC) IMMEDIATELY <br />PRIOR TO STARTING ANY WORK. THE OWNER SHALL NOT BE RESPONSIBLE FOR ADDITIONAL <br />COSTS INCURRED BY FAILED COORDINATION AFTER CONSTRUCTION HAS BEGUN. PC SHALL BE <br />RESPONSIBLE FOR UTILIZING A REPUTABLE UTILITY LOCATING SERVICE PRIOR TO ANY <br />EXCAVATION. <br />PLUMBING CONTRACTOR SHALL CONFIRM EXACT SANITARY CONNECTION INVERT ELEVATION IS <br />DEEP ENOUGH TO ACHIEVE GRAVITY FLOW AT CODE REQUIRED SLOPE FROM FURTHEST FIXTURE <br />TO POINT OF CONNECTION PRIOR TO ANY FLOOR TRENCHING OR ROUGH IN WORK. CONTACT <br />ENGINEER IMMEDIATELY IF GRAVITY DRAINAGE CAN NOT BE ACHIEVED WITH EXISTING FIELD <br />CONDITIONS. <br />EXISTING SANITARY SEWER CONDITIONS NOTE: <br />PLUMBING CONTRACTOR SHALL PROVIDE JOMAR VALVE RECIRCSETTER™AUTOMATIC VARIABLE <br />SET POINT BALANCING VALVE OR EQUIVALENT AT EACH HOT WATER CIRCULATION CONNECTION <br />TO THE HOT WATER SYSTEM. ENSURE VALVES ARE INSTALLED IN AN ACCESSIBLE LOCATION FOR <br />ADJUSTMENT AND SERVICE. SYSTEM SHALL BE SET FOR A 5 DEGREE TEMPERATURE DIFFERENCE <br />FROM WATER HEATER SET POINT. CONSULT WITH THE CIRCULATING PUMP MANUFACTURER FOR <br />ADDITIONAL CONTROLS AND BALANCING INSTRUCTION. <br />HOT WATER BALANCING NOTE: <br />CONTRACTOR SHALL VERIFY EXISTING GAS PRESSURE ON SITE AND WITH UTILITY <br />COMPANY PRIOR TO ANY WORK AND PIPING ROUGH IN. <br />CONTRACTOR SHALL VERIFY AND COORDINATE EXISTING GAS METER BTU CAPACITY WITH <br />LOCAL GAS COMPANY PRIOR TO ANY WORK. IF FOUND TO BE OF INADEQUATE SIZE FOR <br />NEW DEMAND, COORDINATE INSTALLATION OF NEW METER WITH UTILITY COMPANY. <br />MINIMUM REQUESTED DELIVERY PRESSURE OF 8.5"-10" WATER COLUMN. <br />IF FOUND ON SITE THAT THE EXISTING TENANT SERVICE IS LOW PRESSURE (LESS THAN OR <br />EQUAL TO 7"W.C.) BUT IS SERVED BY A DEDICATED PRESSURE REGULATOR, CONTRACTOR <br />SHALL VERIFY WITH UTILITY COMPANY IF EXISTING REGULATOR CAN BE INCREASED TO A <br />MINIMUM OF 8.5"-10"WATER COLUMN. <br />IF FOUND THAT THE EXISTING GAS SERVICE IS ONLY LOW PRESSURE (LESS THAN OR EQUAL <br />TO 7"W.C.), CONTRACTOR SHALL PROVIDE AN ALTERNATE BID FOR; <br />1) IF HIGHER PRESSURE IS AVAILABLE, PROVIDE NEW 2 PSI GAS SERVICE TO SPACE <br />WITH NEW 2 PSI METER AND PRESSURE REGULATOR. <br />2) IF EXTREMELY LOW PRESSURE (LESS THAN 6"W.C.) WILL BE PROVIDED BY UTILITY <br />COMPANY, PROVIDE BID FOR A 1/2 HP GAS BOOSTER PUMP FROM SPENCER TURBINE OR <br />EQUIVALENT TO INCREASE PRESSURE TO 8"W.C. EXAMPLE SPEC #SYS0325 .5VS VS SERIES <br />GAS CUBE. <br />EXISTING GAS SERVICE CONDITIONS NOTE: <br />RECOVERY <br />4.2 <br />WATTS LF-919-QT LEAD FREE CAST COPPER WITH <br />QUATER TURN <br /> NOTE: <br />PLUMBER HAS THE OPTION TO USE <br />PEX, CPVC, OR COPPER. AS LONG AS <br />ALLOWED BY THE LOCAL <br />JURISDICTION <br /> NOTE: <br />1" BACKFLOW PREVENTION DEVICE <br />FOR DOMESTIC PURPOSES PER <br />STANDARD PLAN NO. 1432 <br />S-1 2"2"1/2"1/2""E3S8-2D" - 3 COMPARTMENT <br />"E-SERIES" SINKS WITH TWO <br />DRAIN BOARDS AND GALVANIZED <br />LEGS. <br />E3S8-1824-14T24 ELKAY ANGLE STOP WITH <br />INTEGRAL CHECK <br />VALVE, MANUAL <br />GOOSENECK FAUCET, <br />GRID STRAINER <br />LK406GN <br />27C4834 <br />MS-1 2"2"1/2"1/2"MOP SINK <br />MOLDED STONE <br />FIAT <br />EL MUSTEE <br />ZURN <br />MSB2424 <br />63M <br />Z1996-24 <br />DELTA <br />ZURN <br />FIAT <br />SAN.MARK FIXTURE VENT C.W.MANUFACTURERH.W.MODEL#VALVE MFG GPM/GPF REMARKS <br />VALVE MODEL # <br />BATTERY WIRED HYDRO MANUAL <br />PLUMBING FIXTURE SCHEDULE <br />FLOOR SINK CAST IRON BODY 12" <br />GRATEFS-1 <br />3"2"-- <br />ZURN Z1900-XNH/Z1 <br />900-XNH-2 <br />1.5 <br />FLOOR DRAIN <br />FD-1 3"2"--ZURN ZB415-XNH <br />-7B-P-VP-Y <br />TRENCH DRAINTD-1 3"2"--MIFAB T-200-13 <br />GREASE INTERCEPTORGI-1 4"2"--SCHIER GB-250 <br />SCHIER GB-250 FLOW <br />RATE/GREASE CAPACITY <br />100GPM / 1895LBS <br />LIQUID CAPACITY 277 GAL <br />22.1 POT FILLER FAUCET W/ 18" SWING ●INSTALLED BY GENERAL CONTRACTOR1 <br />P-000: PLUMBING SPECIFICATIONS <br />P-100: PLUMBING SUPPLY PLAN <br />P-200: PLUMBING DWV PLAN <br />P-300: PLUMBING DETAILS <br />P-301: PLUMBING DETAILS <br />P-400: PLUMBING SPECIFICATIONS <br />P-500 TITLE 24 <br />SHEET INDEX <br />P-000 <br />PLUMBING SPECIFICATIONS <br />HEALTH COMMENTS 10-23-20251 <br />79 <br />6 <br /> <br />M <br />e <br />r <br />u <br />s <br /> <br />C <br />o <br />u <br />r <br />t <br />St <br />. <br /> <br />L <br />o <br />u <br />i <br />s <br />, <br /> <br />M <br />O <br /> <br />6 <br />3 <br />0 <br />2 <br />6 <br />T <br />6 <br />3 <br />6 <br />. <br />3 <br />4 <br />9 <br />. <br />1 <br />6 <br />0 <br />0 <br />F <br />6 <br />3 <br />6 <br />. <br />3 <br />4 <br />9 <br />. <br />1 <br />7 <br />3 <br />0 <br />16842136571210911141315 <br />84213657 1210911 1413 15 16 <br />a <br />b <br />c <br />d <br />e <br />f <br />g <br />h <br />j <br />k <br />l <br />m <br />n <br />p <br />r <br />s <br />a <br />b <br />c <br />d <br />e <br />f <br />g <br />h <br />j <br />k <br />l <br />m <br />n <br />p <br />r <br />s <br />Checked by <br />Drawn by <br />Issue Date <br />Project # <br />Scale <br />Client Approval <br />TI <br /> <br />T <br />E <br />M <br />P <br />L <br />A <br />T <br />E <br /> <br />V <br />1 <br />. <br />0 <br />, <br />10 <br />- <br />1 <br />1 <br />- <br />2 <br />0 <br />1 <br />1 <br />SANTA ANA - SOUTH <br />(#0972) <br />3313 S. BRISTOL ST. <br />SANTA ANA, CA 92704 <br />AS INDICATED <br />07/09/2025 <br />69325-CA03 <br />ISSUED FOR <br />PERMIT <br />#Description Date <br />These drawings/specifications are the property of Oculus Inc. They are <br />furnished as contract documents only. The seal(s) and signature(s) apply <br />only to the document to which they are affixed, and expressly disclaim <br />any responsibility for all other plans, specifications, estimates, reports or <br />other documents or instruments relating to or intended to be used for any <br />part or parts of the architectural or engineering project. Additionally these <br />drawings and seal(s) shall in no way convey or imply any type of warranty <br />or certification relating to the performance of products and materials <br />beyond those provided by their respective manufacturer. <br />© 2025 Oculus Inc. <br />Matthew R. Case, Engineer <br />CA # M41121 <br />CITY COMMENTS 01-05-20262