|
PIPE SUPPORT SCHEDULE
<br />1/2
<br />NOMINAL PIPE
<br />DIAMETER
<br />NPS (IN)
<br />3/4
<br />1
<br />1 1/4
<br />1 1/2
<br />2
<br />2 1/2
<br />3
<br />4
<br />6
<br />8
<br />10
<br />12
<br />MAXIMUM SUPPORT SPACING
<br />(FEET)
<br />5
<br />5
<br />5
<br />5
<br />5
<br />5
<br />5
<br />5
<br />5
<br />5
<br />5
<br />CAST IRON
<br />9
<br />12
<br />13
<br />14
<br />15
<br />17
<br />21
<br />24
<br />26
<br />30
<br />9
<br />COPPER
<br />8
<br />12
<br />5
<br />5.5
<br />6
<br />7
<br />7
<br />7.5
<br />8.5
<br />9
<br />10
<br />11.5
<br />5.5
<br />SCH 40 PVC
<br />-
<br />6
<br />60°F
<br />5
<br />5.5
<br />6
<br />7
<br />7
<br />7.5
<br />8.5
<br />9.5
<br />10.5
<br />11.5
<br />5.5
<br />5
<br />6
<br />73°F
<br />SCH 40 CPVC
<br />5
<br />5.5
<br />6
<br />6.5
<br />7
<br />7.5
<br />8
<br />9.5
<br />10.5
<br />10.5
<br />5.5
<br />4.5
<br />5.5
<br />100°F
<br />4.5
<br />5.5
<br />5.5
<br />6.5
<br />7
<br />7
<br />7.5
<br />8.5
<br />9.5
<br />10
<br />5
<br />4.5
<br />5.5
<br />120°F
<br />4
<br />5
<br />5
<br />6
<br />6
<br />6.5
<br />7
<br />7.5
<br />8
<br />8.5
<br />4.5
<br />4
<br />5
<br />140°F
<br />1.SUPPORT SPACING ABOVE IS FOR STRAIGHT HORIZONTAL PIPE. PROVIDE SUPPORTS ON EACH SIDE OF
<br />ELBOWS, FLANGES, VALVES, SPECIALTIES, ETC.
<br />2.ALL PIPING SUPPORTS, THREADED ROD SIZES AND HANGERS SHALL BE PER MSS SP-69
<br />7
<br />10
<br />11
<br />12
<br />12
<br />12
<br />12
<br />12
<br />12
<br />STEEL
<br />9
<br />TABLE TO CALCULATE SUPPLY FIXTURE UNITS
<br />PLUMBING FIXTURE
<br />SUPPLY
<br />FIXTURE
<br />UNITS
<br />NUMBER OF
<br />FIXTURES
<br />TOTAL SUPPLY
<br />FIXTURE UNITS
<br />WATER CLOSET FLUSH TANK 5.0 1 5.0
<br />LAVATORY 2.0 1 2.0
<br />HAND SINKS 2.0 2 4.0
<br />MOP SINK 3.0 1 3.0
<br />3 COMPARTMENT SINK (S-1)4.0 1 4.0
<br />POT FILLER 0.5 1 .5
<br />TOTAL SUPPLY FIXTURE
<br />UNITS 18.50
<br />WATER PIPE SIZE= 1"
<br />TABLE TO CALCULATE DRAINAGE FIXTURE UNITS
<br />PLUMBING FIXTURE
<br />DRAINAGE
<br />FIXTURE
<br />UNITS
<br />NUMBER OF
<br />FIXTURES
<br />TOTAL DRAINAGE
<br />FIXTURE UNITS
<br />WATER CLOSET FLUSH TANK 4 1 4
<br />LAVATORY 2 1 2
<br />HAND SINKS 2 2 4
<br />MOP SINK 3 1 3
<br />3 COMPARTMENT SINK (S-1)5 1 5
<br />POT FILLER 2 1 2
<br />TOTAL DRAINAGE
<br />FIXTURE UNITS 20
<br />SANITARY WASTE SIZE= 4"
<br />VOLT/PHASEMFRMARKMODELSTORAGE HEAT INPUT REMARKS
<br />WATER HEATER SCHEDULE
<br />1: SET WATER HEATER TEMPERATURE TO 140°f.
<br />2:CONSULT MANUFACTURER PRIOR TO PURCHASE FOR EXACT MODEL AND ALL ACCESSORIES
<br />FOR A COMPLETE SYSTEM.
<br />3:CONFIRM MBH WITH PLUMBING CONTRACTOR PRIOR TO PURCHASE AND ROUGH IN.
<br />WH-1 RINNAI INSTANTANEOUS 120/1 199 1,2,3
<br />SAN.
<br />RESTROOM FIXTURES
<br />MARK FIXTURE VENT C.W.MANUFACTURERH.W.MODEL#VALVE MFG GPM/GPF REMARKS
<br />VALVE MODEL #
<br />BATTERY MANUAL
<br />L-1 2"2"1/2"1/2"WALL HUNG LAVATORY
<br />WITH CONCEALED ARM
<br />FLOOR PEDESTAL CARRIER
<br />ADA COMPLIANT
<br />TOTO
<br />KOHLER
<br />GERBER
<br />LT-307
<br />K-2007-0
<br />12-654
<br />TOTO
<br />KOHLER
<br />DELTA
<br />SLOAN
<br />K-13466
<br />TEL145
<br />K-15198
<br />631TP320 22C1
<br />EFX250
<br />ADDITIONAL REMARKS
<br />1.ANGLE STOPS SHALL BE LOOSE KEYED WITH INTEGRAL CHECK VALVE. MCGUIRE LFCK SERIES OR EQUIVALENT.
<br />2.ALL ADA ACCESSIBLE SINKS PTRAP AND DRAIN PIPING SHALL BE PROVIDED WITH MCGUIRE PREWRAPPED PW2125 SERIES OR EQUIVALENT. ALL SUPPLIES SHALL BE
<br />TRUEBRO LAVGUARDS OR EQUIVALENT. WATCO IDEALLAV LAV DRAIN GRID DRAIN WITH INTERNAL STOPPER WITH P-TRAP WRAPPED IN TRUEBRO LAV GAURD IS
<br />ACCEPTABLE ALTERNATE.
<br />MARK QTY DESCRIPTION PROV. BY
<br />OTHERS
<br />PROV. BY
<br />KITCHEN
<br />PROV. BY
<br />G.C.
<br />PROV. BY
<br />TENANT EQUIPMENT REMARKS
<br />7 24" x 24" MOP SINK, FIAT MODESTO ●w/ HOSE AND HOSE HANGER
<br />7.1 FAUCET, SERVICE SINK ●
<br />1
<br />1
<br />20 SINK, SCULLERY, 3 COMPARTMENTS ●120" (24" DRAIN BOARD EACH SIDE)
<br />20.2 ADD ON FAUCET FOR 3 COMPARTMENT
<br />SINK ●INSTALLED BY GENERAL CONTRACTOR
<br />21 HAND SINK, WALL MOUNTED w/ FAUCET ●INSTALLED BY GENERAL CONTRACTOR
<br />1
<br />1
<br />2
<br />NOTE: G.C. SUPPLIER TO VERIFY QUANTITIES
<br />G.C. IS TO VERIFY ALL EXISTING FIELD CONDITIONS PRIOR TO ORDERING ANY EQUIPMENT SHOWN ON THIS PLAN. IF ANY CONFLICTS ARE FOUND,
<br />CONTACT ARCHITECT AND OWNER IMMEDIATELY. CONFLICTING EQUIPMENT IS NOT TO BE ORDERED UNTIL ISSUE IS RESOLVED.
<br />ALL EQUIPMENT SHALL BE INSTALLED BY THE EQUIPMENT SUPPLIER UNLESS NOTED OTHERWISE.
<br />1. PLUMBING CONTRACTOR SHALL ABIDE BY THE LOCAL CODES AND ORDINANCES.
<br />2. PLUMBING CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATIONS AND SIZES OF ALL UTILITIES, INCLUDING THE DEPTHS OF ALL
<br />BELOW GRADE SANITARY SEWERS, PRIOR TO START OF WORK. THIS DRAWING IS NOT INTENDED TO INDICATE ALL EXISTING UTILITIES.
<br />3. CONTRACTOR SHALL BE FAMILIAR WITH LANDLORD'S STANDARDS, RULES AND REGULATIONS. OBTAIN COPY OF MALL'S CRITERIA
<br />PACKAGE AND CONFORM TO ALL REQUIREMENTS. ALL LANDLORD'S CRITERIA SHALL BE COMPILED WITH AND INCLUDED IN THIS BID.
<br />4. CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID AND FIELD VERIFY EXISTING CONDITIONS TO ENSURE THAT THE WORK
<br />REPRESENTED ON THE DRAWINGS AND IN THESE SPECIFICATIONS CAN BE INSTALLED AS INDICATED. CONTRACTOR SHALL TAKE ALL
<br />INTERFERENCES INTO CONSIDERATION. PROVIDE ALL NECESSARY OFFSETS TO SUIT FIELD CONDITIONS AS REQUIRED.
<br />5. CONTRACTOR SHALL VERIFY AND COORDINATE ALL UTILITY CONNECTION POINTS, INCLUDING SIZES AND INVERTS WITH EXISTING
<br />FIELD CONDITIONS PRIOR TO START OF WORK.
<br />6. MAKE ALL UTILITY CONNECTIONS AND INSTALLATIONS IN FULL ACCORDANCE WITH ALL UTILITY REGULATIONS. PROVIDE ALL
<br />ADDITIONAL APPURTENANCES AS REQUIRED BY UTILITY COMPANY. THE COMPLETED INSTALLATION SHALL BE IN ACCORDANCE WITH
<br />ALL APPLICABLE INDUSTRY STANDARDS OF GOOD PRACTICE AND SAFETY, AND THE MANUFACTURER'S STRICTEST
<br />RECOMMENDATIONS FOR EQUIPMENT AND PRODUCT APPLICATION AND INSTALLATION.
<br />7. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS RELATED TO THE INSTALLATION OF THE WORK.
<br />8. ALL WORK SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES, LAWS, ACTS AND ALL AUTHORITIES HAVING
<br />JURISDICTION AND LANDLORD'S CRITERIA.
<br />9. MAINTAIN ALL MANUFACTURER'S RECOMMENDED SERVICE CLEARANCES FOR ALL FIXTURES AND EQUIPMENT. REFER TO
<br />ARCHITECTURAL PLANS FOR EXACT LOCATIONS OF PLUMBING FIXTURES.
<br />10. CUTTING OF ROOF AND FLASHING OF PIPE CURBS, SANITARY VENT THROUGH ROOF, ETC. SHALL BE COORDINATED WITH AND
<br />PERFORMED BY LANDLORD'S ROOFING CONTRACTOR, AT THIS CONTRACTOR'S EXPENSE, TO MAINTAIN ROOF WARRANTY. ALL VENT
<br />OUTLETS SHALL BE A MINIMUM OF 10'-0" AWAY FROM OR 3'-0" ABOVE ANY AIR INTAKES ON HVAC EQUIPMENT.
<br />11. ALL HORIZONTAL FIRE PROTECTION SPRINKLER PIPING AND ALL ABOVE GRADE EXPOSED HORIZONTAL PIPING IS TO BE INSTALLED
<br />AS HIGH AS POSSIBLE.
<br />12. CONTRACTOR SHALL COORDINATE TIMES TO WORK IN SPECIFIC AREA OF THE EXISTING BUILDING WITH THE BUILDING MANAGER
<br />AND WITH THE OCCUPANTS OF THE AREA AFFECTED BY THE WORK.
<br />13. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES WITH THE
<br />CONTRACT DOCUMENTS BEFORE COMMENCING ANY WORK.
<br />14. SLEEVE AND SEAL ALL PIPE PENETRATIONS OF WALLS AND FLOORS. APPLY INTUMESCENT FIRE SAFING COMPOUND AT
<br />PENETRATIONS AT FIRE RATED WALLS AND FLOORS, MAINTAINING INTEGRITY AND RATING OF FIRE SEPARATION. SLEEVES THROUGH
<br />FLOORS SHALL EXTEND 2" ABOVE FLOOR, BE GROUTED INTO PLACE AND WATERPROOFED. PIPING THROUGH EXTERIOR WALLS SHALL
<br />BE SLEEVED AND SEALED WEATHER TIGHT WITH SILICONE CAULK.
<br />15. ALL DOMESTIC COLD, HOT AND TEMPERED WATER PIPING TO BE INSULATED WITH RIGID FIBERGLASS INSULATION WITH TYPE "ASJ"
<br />JACKET. COLD WATER PIPES TO HAVE 1
<br />2" THICK INSULATION. DOMESTIC HOT AND TEMPERED WATER PIPES TO HAVE 1" THICK
<br />INSULATION.
<br />16. THE P.C. IS TO INSPECT THE EXISTING SANITARY DRAIN TO VERIFY THAT IT HAS SUFFICIENT DEPTH FOR THE NEW WORK AND TO
<br />VERIFY THE DIRECTION OF FLOW. PRESSURE TEST THE EXISTING SANITARY DRAIN PRIOR TO THE START OF WORK. VERIFY THAT
<br />SEWER IS ACTIVE BY FLUSHING WITH WATER, A MINIMUM OF FIVE GALLONS PER MINUTE FOR FOUR HOURS PRIOR TO START OF
<br />WORK.
<br />17. ALL NEW PLUMBING FIXTURES MUST BEAR THE WATERSENSE LABEL. DO NOT REMOVE THE WATERSENSE LABEL PRIOR TO
<br />PASSING THE FINAL INSPECTION AND HAVE FIXTURE CUT SHEETS ONSITE FOR FINAL INSPECTION.
<br />18. A STACK TEST ON THE WASTE AND VENT MAY BE REQUIRED BY THE PLUMBING INSPECTOR AT THE TIME OF ROUGH INSPECTION
<br />AND UNDERGROUND INSPECTIONS.
<br />19. 100 PSI AIR TEST OR WATER PRESSURE REQUIRED ON WATER DISTRIBUTION PIPING AT TIMES OF ROUGH INSPECTION.
<br />20. ALL EXISTING PLUMBING THAT MAY POSE A HEALTH OR SAFETY HAZARD SHALL BE CORRECTED.
<br />CO
<br />GCO
<br />CD
<br />AFF
<br />VTR
<br />CLEAN OUT
<br />PRESSURE REGULATING VALVE (PRV)
<br />GRADE CLEAN OUT
<br />BALL VALVE
<br />CONDENSATE DRAIN PIPING
<br />ABOVE FINISHED FLOOR
<br />UNION
<br />PIPE TURNING UP
<br />PIPE TURNING DOWN
<br />VENT THROUGH ROOF
<br />SANITARY VENT PIPING
<br />SANITARY DRAIN PIPING
<br />COLD WATER PIPING
<br />HOT WATER PIPING (140°F)
<br />POINT OF CONNECTION
<br />PLUMBING SYMBOLS LEGEND
<br />G NATURAL GAS PIPING
<br />CHECK VALVE
<br />HOT WATER RETURN PIPING
<br />UNDERGROUND SANITARY PIPING
<br />CA COMPRESSED AIR PIPING
<br />BALANCE VALVE
<br />45.1 WATER HEATER - TANKLESS EXISTING LOCATION; REFERENCE
<br />PLUMBING1●
<br />#
<br />BACK FLOW PREVENTER ASSEMBLY REQUIREMENTS
<br />TYPE OF EQUIP.
<br />ON SYSTEM
<br />METHOD OF CROSS CONNECTION
<br />CONTROL
<br />MANUFACTURE AND
<br />MODEL NUMBER REMARKS
<br />CHEMICAL FEED
<br />1. CONTRACTOR SHALL PROVIDE INDIVIDUAL BACKFLOW PREVENTERS FOR EACH PIECE OF EQUIPMENT.
<br />2. EACH BACKFLOW PREVENTER MUST HAVE TESTING PORTS.
<br />3. BRONZE BODIED BACKFLOW PREVENTERS ARE PERMISSABLE IF ALLOWED BY LOCAL CODES.
<br />PLUMBING GENERAL NOTES
<br />STAINLESS STEEL REDUCED
<br />PRESSURE ZONE ASSEMBLY
<br />CU199iN
<br />TABLE TO CALCULATE HOT WATER GPM (TANKLESS)
<br />INCOMING WATER TEMPERATURE (AVERAGE GROUND WATER TEMP) =55º
<br />HOT WATER TEMPERATURE =140º
<br />TEMPERATURE RISE =85º
<br />PLUMBING FIXTURE
<br />TOTAL
<br />FIXTURE OR
<br />FAUCET GPM
<br />MIXED
<br />TEMPERATURE
<br />HOT WATER
<br />GPM PER
<br />FIXTURE OR
<br />FAUCET
<br />NO. OF
<br />FIXTURES OR
<br />FAUCETS
<br />FULL HOT
<br />WATER FLOW
<br />(GPM)
<br />ESTIMATED
<br />PERCENT
<br />USAGE
<br />DESIGNED
<br />HOT WATER
<br />FLOW
<br />(GPM)
<br />3-COMP SINK (S-1)2.0 140º2.00 1 2.00 100%2.00
<br />MOP SINK 3.0 140º3.00 1 3.00 0%0.00
<br />LAVATORIES/HAND
<br />SINKS 0.5 105º0.29 3 0.88 100%0.88
<br />FULL HOT WATER FLOW FOR ALL FIXTURES RUNNING =5.88 GPM
<br />DESIGNED HOT WATER GALLONS PER MINUTE =2.9 GPM
<br />2"1-1/2"4"W-1 -FLOOR MOUNTED WATER CLOSET
<br />FLUSH VALVE
<br />ADA COMPLIANT
<br />ELONGATED BOWL
<br />TOTO
<br />KOHLER
<br />GERBER
<br />TOTO
<br />KOHLER
<br />DELTA
<br />SLOAN
<br />1.28 CT705ULN
<br />K-96057
<br />25-733
<br />TMT1NN
<br />K-7531 K-13517
<br />TET1GA
<br />AEF801 MF700T
<br />G2 8111 111
<br />REMARKS
<br />1"
<br />MFR: J.R. SMITH
<br />WATER HAMMER ARRESTER SCHEDULE
<br />WHA-A 5005
<br />5010
<br />5020
<br />1-11
<br />12-32
<br />33-60
<br />THREADED NIPPLE CONNECTION
<br />TAG
<br />1.BRANCH LINE LESS THAN 20 FEET: THE PREFERRED PLACEMENT LOCATION IS AT THE END OF
<br />THE BRANCH LINE BETWEEN THE LAST TWO FIXTURES.
<br />UP TO 20 FT.
<br />FIXTURE (TYP.)
<br />"L"
<br />3/4"
<br />FIXTURE
<br />(TYP.)
<br />MODEL NO.
<br />CONNECTION
<br />SIZE
<br />FIXTURE
<br />UNIT RATING
<br />2.BRANCH LINES GREATER THAN 20 FEET: SIZE EACH W.H.A. FOR SUM OF BRANCH W.S.FU.,
<br />PLACE W.H.A. AS SHOWN.
<br />WHA-B
<br />WHA-C 1"
<br />THREADED NIPPLE CONNECTION
<br />THREADED NIPPLE CONNECTION
<br />WHA
<br />WHA WHA
<br />"L/2"
<br />2.1 OVEN ●INSTALLED BY GENERAL CONTRACTOR1
<br />2.0 HOOD ●INSTALLED BY GENERAL CONTRACTOR1
<br />CP-1 CIRCULATION PUMP --3/4"3/4"GRUNDFOS ALPHA 15-55
<br />HWR SF/T
<br />GAS LOAD SUMMARY
<br />SYSTEM DESIGNATION EQUIPMENT MBH
<br />PLUMBING DWH-1 WATER HEATER 199
<br />KITCHEN LBC MODEL
<br />LRG-2G4 OVEN 290
<br />TOTAL NATURAL GAS CONNECTED LOAD 489
<br />GAS METER
<br />REQUIREMENTS
<br />MBH CAPACITY 489
<br />TOTAL DEVELOPED LENGTH
<br />INCLUDING EQUIVALENT PIPE LENGTH
<br />FOR FITTING AND VALVE FRICTION
<br />LOSSES TO GAS METER.
<br />77 FT X
<br />1.2 104 FT
<br />CONSULT GAS UTILITY COMPANY FOR
<br />REGULATOR RATING
<br />SANITARY SEWER PIPING SHOWN ON DRAWINGS IS DIAGRAMMATIC AND MAY DIFFER SLIGHTLY
<br />FROM ACTUAL FIELD CONDITIONS. PLUMBING CONTRACTOR (PC) SHALL COORDINATE WITH
<br />EXISTING FIELD CONDITIONS VIA A SANITARY VIDEO SURVEY/SCOPE TO DETERMINE THE EXACT
<br />SIZE, LOCATION, INVERT ELEVATIONS AT THE PROPOSED CONNECTIONS TO EXISTING PLUMBING
<br />SERVICES PRIOR TO CONSTRUCTION. IF ACTUAL FIELD FINDINGS VARY SIGNIFICANTLY FROM
<br />THOSE AS INDICATED ON PLANS, PC SHALL NOTIFY GENERAL CONTRACTOR (GC) IMMEDIATELY
<br />PRIOR TO STARTING ANY WORK. THE OWNER SHALL NOT BE RESPONSIBLE FOR ADDITIONAL
<br />COSTS INCURRED BY FAILED COORDINATION AFTER CONSTRUCTION HAS BEGUN. PC SHALL BE
<br />RESPONSIBLE FOR UTILIZING A REPUTABLE UTILITY LOCATING SERVICE PRIOR TO ANY
<br />EXCAVATION.
<br />PLUMBING CONTRACTOR SHALL CONFIRM EXACT SANITARY CONNECTION INVERT ELEVATION IS
<br />DEEP ENOUGH TO ACHIEVE GRAVITY FLOW AT CODE REQUIRED SLOPE FROM FURTHEST FIXTURE
<br />TO POINT OF CONNECTION PRIOR TO ANY FLOOR TRENCHING OR ROUGH IN WORK. CONTACT
<br />ENGINEER IMMEDIATELY IF GRAVITY DRAINAGE CAN NOT BE ACHIEVED WITH EXISTING FIELD
<br />CONDITIONS.
<br />EXISTING SANITARY SEWER CONDITIONS NOTE:
<br />PLUMBING CONTRACTOR SHALL PROVIDE JOMAR VALVE RECIRCSETTER™AUTOMATIC VARIABLE
<br />SET POINT BALANCING VALVE OR EQUIVALENT AT EACH HOT WATER CIRCULATION CONNECTION
<br />TO THE HOT WATER SYSTEM. ENSURE VALVES ARE INSTALLED IN AN ACCESSIBLE LOCATION FOR
<br />ADJUSTMENT AND SERVICE. SYSTEM SHALL BE SET FOR A 5 DEGREE TEMPERATURE DIFFERENCE
<br />FROM WATER HEATER SET POINT. CONSULT WITH THE CIRCULATING PUMP MANUFACTURER FOR
<br />ADDITIONAL CONTROLS AND BALANCING INSTRUCTION.
<br />HOT WATER BALANCING NOTE:
<br />CONTRACTOR SHALL VERIFY EXISTING GAS PRESSURE ON SITE AND WITH UTILITY
<br />COMPANY PRIOR TO ANY WORK AND PIPING ROUGH IN.
<br />CONTRACTOR SHALL VERIFY AND COORDINATE EXISTING GAS METER BTU CAPACITY WITH
<br />LOCAL GAS COMPANY PRIOR TO ANY WORK. IF FOUND TO BE OF INADEQUATE SIZE FOR
<br />NEW DEMAND, COORDINATE INSTALLATION OF NEW METER WITH UTILITY COMPANY.
<br />MINIMUM REQUESTED DELIVERY PRESSURE OF 8.5"-10" WATER COLUMN.
<br />IF FOUND ON SITE THAT THE EXISTING TENANT SERVICE IS LOW PRESSURE (LESS THAN OR
<br />EQUAL TO 7"W.C.) BUT IS SERVED BY A DEDICATED PRESSURE REGULATOR, CONTRACTOR
<br />SHALL VERIFY WITH UTILITY COMPANY IF EXISTING REGULATOR CAN BE INCREASED TO A
<br />MINIMUM OF 8.5"-10"WATER COLUMN.
<br />IF FOUND THAT THE EXISTING GAS SERVICE IS ONLY LOW PRESSURE (LESS THAN OR EQUAL
<br />TO 7"W.C.), CONTRACTOR SHALL PROVIDE AN ALTERNATE BID FOR;
<br />1) IF HIGHER PRESSURE IS AVAILABLE, PROVIDE NEW 2 PSI GAS SERVICE TO SPACE
<br />WITH NEW 2 PSI METER AND PRESSURE REGULATOR.
<br />2) IF EXTREMELY LOW PRESSURE (LESS THAN 6"W.C.) WILL BE PROVIDED BY UTILITY
<br />COMPANY, PROVIDE BID FOR A 1/2 HP GAS BOOSTER PUMP FROM SPENCER TURBINE OR
<br />EQUIVALENT TO INCREASE PRESSURE TO 8"W.C. EXAMPLE SPEC #SYS0325 .5VS VS SERIES
<br />GAS CUBE.
<br />EXISTING GAS SERVICE CONDITIONS NOTE:
<br />RECOVERY
<br />4.2
<br />WATTS LF-919-QT LEAD FREE CAST COPPER WITH
<br />QUATER TURN
<br /> NOTE:
<br />PLUMBER HAS THE OPTION TO USE
<br />PEX, CPVC, OR COPPER. AS LONG AS
<br />ALLOWED BY THE LOCAL
<br />JURISDICTION
<br /> NOTE:
<br />1" BACKFLOW PREVENTION DEVICE
<br />FOR DOMESTIC PURPOSES PER
<br />STANDARD PLAN NO. 1432
<br />S-1 2"2"1/2"1/2""E3S8-2D" - 3 COMPARTMENT
<br />"E-SERIES" SINKS WITH TWO
<br />DRAIN BOARDS AND GALVANIZED
<br />LEGS.
<br />E3S8-1824-14T24 ELKAY ANGLE STOP WITH
<br />INTEGRAL CHECK
<br />VALVE, MANUAL
<br />GOOSENECK FAUCET,
<br />GRID STRAINER
<br />LK406GN
<br />27C4834
<br />MS-1 2"2"1/2"1/2"MOP SINK
<br />MOLDED STONE
<br />FIAT
<br />EL MUSTEE
<br />ZURN
<br />MSB2424
<br />63M
<br />Z1996-24
<br />DELTA
<br />ZURN
<br />FIAT
<br />SAN.MARK FIXTURE VENT C.W.MANUFACTURERH.W.MODEL#VALVE MFG GPM/GPF REMARKS
<br />VALVE MODEL #
<br />BATTERY WIRED HYDRO MANUAL
<br />PLUMBING FIXTURE SCHEDULE
<br />FLOOR SINK CAST IRON BODY 12"
<br />GRATEFS-1
<br />3"2"--
<br />ZURN Z1900-XNH/Z1
<br />900-XNH-2
<br />1.5
<br />FLOOR DRAIN
<br />FD-1 3"2"--ZURN ZB415-XNH
<br />-7B-P-VP-Y
<br />TRENCH DRAINTD-1 3"2"--MIFAB T-200-13
<br />GREASE INTERCEPTORGI-1 4"2"--SCHIER GB-250
<br />SCHIER GB-250 FLOW
<br />RATE/GREASE CAPACITY
<br />100GPM / 1895LBS
<br />LIQUID CAPACITY 277 GAL
<br />22.1 POT FILLER FAUCET W/ 18" SWING ●INSTALLED BY GENERAL CONTRACTOR1
<br />P-000: PLUMBING SPECIFICATIONS
<br />P-100: PLUMBING SUPPLY PLAN
<br />P-200: PLUMBING DWV PLAN
<br />P-300: PLUMBING DETAILS
<br />P-301: PLUMBING DETAILS
<br />P-400: PLUMBING SPECIFICATIONS
<br />P-500 TITLE 24
<br />SHEET INDEX
<br />P-000
<br />PLUMBING SPECIFICATIONS
<br />HEALTH COMMENTS 10-23-20251
<br />79
<br />6
<br />
<br />M
<br />e
<br />r
<br />u
<br />s
<br />
<br />C
<br />o
<br />u
<br />r
<br />t
<br />St
<br />.
<br />
<br />L
<br />o
<br />u
<br />i
<br />s
<br />,
<br />
<br />M
<br />O
<br />
<br />6
<br />3
<br />0
<br />2
<br />6
<br />T
<br />6
<br />3
<br />6
<br />.
<br />3
<br />4
<br />9
<br />.
<br />1
<br />6
<br />0
<br />0
<br />F
<br />6
<br />3
<br />6
<br />.
<br />3
<br />4
<br />9
<br />.
<br />1
<br />7
<br />3
<br />0
<br />16842136571210911141315
<br />84213657 1210911 1413 15 16
<br />a
<br />b
<br />c
<br />d
<br />e
<br />f
<br />g
<br />h
<br />j
<br />k
<br />l
<br />m
<br />n
<br />p
<br />r
<br />s
<br />a
<br />b
<br />c
<br />d
<br />e
<br />f
<br />g
<br />h
<br />j
<br />k
<br />l
<br />m
<br />n
<br />p
<br />r
<br />s
<br />Checked by
<br />Drawn by
<br />Issue Date
<br />Project #
<br />Scale
<br />Client Approval
<br />TI
<br />
<br />T
<br />E
<br />M
<br />P
<br />L
<br />A
<br />T
<br />E
<br />
<br />V
<br />1
<br />.
<br />0
<br />,
<br />10
<br />-
<br />1
<br />1
<br />-
<br />2
<br />0
<br />1
<br />1
<br />SANTA ANA - SOUTH
<br />(#0972)
<br />3313 S. BRISTOL ST.
<br />SANTA ANA, CA 92704
<br />AS INDICATED
<br />07/09/2025
<br />69325-CA03
<br />ISSUED FOR
<br />PERMIT
<br />#Description Date
<br />These drawings/specifications are the property of Oculus Inc. They are
<br />furnished as contract documents only. The seal(s) and signature(s) apply
<br />only to the document to which they are affixed, and expressly disclaim
<br />any responsibility for all other plans, specifications, estimates, reports or
<br />other documents or instruments relating to or intended to be used for any
<br />part or parts of the architectural or engineering project. Additionally these
<br />drawings and seal(s) shall in no way convey or imply any type of warranty
<br />or certification relating to the performance of products and materials
<br />beyond those provided by their respective manufacturer.
<br />© 2025 Oculus Inc.
<br />Matthew R. Case, Engineer
<br />CA # M41121
<br />CITY COMMENTS 01-05-20262
|