Laserfiche WebLink
OVEN <br />RACK <br />CE <br />L <br />L <br />O <br />CE <br />L <br />L <br />O <br />OVEN <br />RACK <br />OVEN <br />RACK <br />OVEN <br />RACK <br />OVEN <br />RACK <br />MI <br />C <br />R <br />O <br />RE <br />F <br />REMOVE EXISTING 3/4" WATER LINE AND 3/4" WATER METER. PROVIDE NEW 1" WATER METER AND 1" WATER SERVICE LINE BACK TO EXISTING MAIN. VERIFY EXACT SIZE, ROUTING, DELIVERY PRESSURE, AND <br />WATER METER INSTALLATION REQUIREMENTS WITH LANDLORD AND LOCAL WATER UTILITY COMPANY PRIOR TO ANY WORK. PROVIDE ALTERNATE BID FOR A BOOSTER PUMP SYSTEM IF FOUND ON SITE <br />DOMESTIC WATER PRESSURE IS LESS THAN 65 PSI STATIC. RECOMMENDED DOMESTIC METER SIZE 1" WITH A DISTRIBUTION SIZE OF 1" IMMEDIATELY AFTER DOMESTIC WATER METER TO THE FIXTURE IN TENANT <br />SPACE. <br />PROVIDE ASSE 1070 CERTIFIED APPROVED MIXING VALVE TO LAVATORY AND HAND SINKS. SET AT 105°. <br />ROUTE TO CONNECT TO EXISTING CAPPED GAS LINE IN SPACE. VERIFY EXACT ROUTING, SIZE, DELIVERY PRESSURE AND METER INSTALLATION REQUIREMENTS WITH LOCAL GAS COMPANY AND LANDLORD <br />PRIOR TO ANY WORK. DESIGN DELIVERY PRESSURE: 7" W.C. , TOTAL GAS DEMAND: 489 MBH , APPROXIMATE DEVELOPED LENGTH: 104 FEET. <br />SANITARY WASTE PIPING SHALL ROUTE TO CONNECT TO EXISTING SANITARY WASTE PIPING LEAVING SPACE. PLUMBING CONTRACTOR SHALL VERIFY EXACT SIZE, LOCATION, ROUTING AND CONNECTION <br />REQUIREMENTS WITH LANDLORD AND UTILITY COMPANY PRIOR TO BIDDING AND PERFORMING ANY EXCAVATION WORK <br />CONNECT NEW SANITARY VENT PIPING TO EXISTING SANITARY VENT PIPING IN SPACE . VERIFY SIZE AND LOCATION IN FIELD PRIOR TO WORK. VERIFY EXACT ROUTING IN FIELD WITH OTHER DISCIPLINES. <br />PROVIDE FLOOR DRAIN WITH HARD PIPED TRAP PRIMER FROM NEAREST SINK. <br />GAS DOWN TO OVEN. <br />ROUTE PIPING LOW IN WALL COORDINATE WITH ELECTRICAL CONTRACTOR. <br />CONDENSATE FROM COOLER TO SLOPE NO LESS THAN 1/8" PER FOOT AND DISCHARGE INDIRECTLY INTO FLOOR DRAIN PROVIDE CODE APPROVED AIR GAP . <br />PROVIDE NEW GREASE INTERCEPTOR BELOW GRADE WITH TRAFFIC RATED COVER . COORDINATE WITH LANDLORD AND LOCAL AUTHORITIES FOR EXACT LOCATION INSTALL PER MANUFACTURES MANUALS. <br />VERIFY LOCATION, INVERT ELEVATION AND DIRECTION OF FLOW PRIOR TO ANY WORK. <br />IF BUILDING DOMESTIC WATER SERVICE IS NOT ALREADY PROTECTED BY A MAIN BACKFLOW PREVENTER, THEN PROVIDE A REDUCED PRESSURE BACKFLOW PREVENTER (RPZ) AT AN ACCESSIBLE LOCATION <br />ABOVE THE MOP SINK. RELIEF VALVE SHALL DRAIN INDIRECTLY INTO THE MOP SINK WITH A CODE-APPROVED AIR GAP. VERIFY IN FIELD PRIOR TO EQUIPMENT PURCHASE. <br />VENT PIPING BELOW GRADE TO SERVE GREASE INTERCEPTOR. COORDINATE EXACT ROUTING IN FIELD AND VERIFY ALL EXISTING UTILITIES PRIOR TO ANY WORK. <br />ROUTE TO CONNECT TO EXISTING SANITARY WASTE PIPING. PLUMBING CONTRACTOR SHALL VERIFY EXACT SIZE, INVERT ELEVATION, LOCATION, ROUTING AND CONNECTION REQUIREMENTS WITH LANDLORD <br />AND UTILITY COMPANY PRIOR TO BIDDING AND PERFORMING ANY EXCAVATION WORK. PROVIDE ALTERNATE BID FOR A SEWAGE LIFT STATION IF EXISTING TIE IN CONNECTION IS FOUND TO NOT BE DEEP <br />ENOUGH TO RECEIVE THE DISCHARGE FROM THE NEW SANITARY SYSTEM. <br />FLOOR SINK SHALL RECEIVE OVEN INDIRECT WASTE FROM OVEN. FLOOR SINK SHALL BE INSTALLED FLUSH WITH FINISHED FLOOR AND SHALL NOT CREATE A TRIPPING HAZARD. FINAL LOCATION, ROUTING, AND <br />INSTALLATION SHALL BE COORDINATED WITH EQUIPMENT CUT SHEETS AND APPROVED BY AHJ PRIOR TO INSTALLATION. <br />1 <br />2 <br />PLUMBING SUPPLY KEYED NOTES <br />OVEN <br />RACK <br />CE <br />L <br />L <br />O <br />CE <br />L <br />L <br />O <br />OVEN <br />RACK <br />OVEN <br />RACK <br />OVEN <br />RACK <br />OVEN <br />RACK <br />MI <br />C <br />R <br />O <br />RE <br />F <br />3 <br />RPZBFP <br />SEE SHEET MP-100 <br />FOR CONTINUATION <br />MS-1 <br />77.1 <br />WH-1 <br />1/2" CW DOWN TO <br />POT FILLER <br />45 <br />2.12.0 <br />21 20.120.2202 <br />21 2 <br />HS-1 <br />HS-1 <br />S-1 <br />SHUT-OFF <br />VALVE TYP. <br />BALANCING <br />VALVE TYP. <br />CP-1 <br />L-1 <br />W-1 <br />SEE SHEET MP-100 <br />FOR CONTINUATION <br />SEE SHEET MP-100 <br />FOR <br />CONTINUATION <br />4 <br />5 <br />6 <br />PLUMBING SUPPLY PLAN1 <br />P-100 SCALE: 1/4" = 1'-0" <br />PLUMBING DWV PLAN1 <br />P-100 SCALE: 1/4" = 1'-0" <br />1/2" CW TO CHEMICAL <br />DISPENSER AT MOP SINK <br />1 <br />2 <br />MS-1 <br />77.1 <br />HS-121 <br />HS-121 <br />GCO <br />FD-1 <br />L-1 W-1 <br />S-1 <br />20.1 20.220 <br />GI-1 <br />FCO <br />GCO <br />5 <br />6 <br />9 <br />FS-1 <br />7 <br />7 <br />8 <br />8 <br />FS-1 <br />WALK <br />IN <br />COOLER <br />9 <br />10 <br />11 <br />11 <br />TD-1 <br />FCO <br />GWGW <br />FCO <br />SAN SAN <br />SAN SAN <br />SAN <br />10 <br />12 <br />12 <br />CW <br />HW <br />HWR <br />CW <br />HW <br />HWR <br />CW <br />HW <br />HWR <br />CWS CWS CWS <br />POT <br />FILLER 22.1 <br />13 <br />13 <br />SV24 INSPECTION <br />PORT <br />FS-1 <br />14 <br />14 <br />5 <br />P-100 <br />PLUMBING SUPPLY PLAN <br />79 <br />6 <br /> <br />M <br />e <br />r <br />u <br />s <br /> <br />C <br />o <br />u <br />r <br />t <br />St <br />. <br /> <br />L <br />o <br />u <br />i <br />s <br />, <br /> <br />M <br />O <br /> <br />6 <br />3 <br />0 <br />2 <br />6 <br />T <br />6 <br />3 <br />6 <br />. <br />3 <br />4 <br />9 <br />. <br />1 <br />6 <br />0 <br />0 <br />F <br />6 <br />3 <br />6 <br />. <br />3 <br />4 <br />9 <br />. <br />1 <br />7 <br />3 <br />0 <br />16842136571210911141315 <br />84213657 1210911 1413 15 16 <br />a <br />b <br />c <br />d <br />e <br />f <br />g <br />h <br />j <br />k <br />l <br />m <br />n <br />p <br />r <br />s <br />a <br />b <br />c <br />d <br />e <br />f <br />g <br />h <br />j <br />k <br />l <br />m <br />n <br />p <br />r <br />s <br />Checked by <br />Drawn by <br />Issue Date <br />Project # <br />Scale <br />Client Approval <br />TI <br /> <br />T <br />E <br />M <br />P <br />L <br />A <br />T <br />E <br /> <br />V <br />1 <br />. <br />0 <br />, <br />10 <br />- <br />1 <br />1 <br />- <br />2 <br />0 <br />1 <br />1 <br />SANTA ANA - SOUTH <br />(#0972) <br />3313 S. BRISTOL ST. <br />SANTA ANA, CA 92704 <br />AS INDICATED <br />07/09/2025 <br />69325-CA03 <br />ISSUED FOR <br />PERMIT <br />#Description Date <br />These drawings/specifications are the property of Oculus Inc. They are <br />furnished as contract documents only. The seal(s) and signature(s) apply <br />only to the document to which they are affixed, and expressly disclaim <br />any responsibility for all other plans, specifications, estimates, reports or <br />other documents or instruments relating to or intended to be used for any <br />part or parts of the architectural or engineering project. Additionally these <br />drawings and seal(s) shall in no way convey or imply any type of warranty <br />or certification relating to the performance of products and materials <br />beyond those provided by their respective manufacturer. <br />© 2025 Oculus Inc. <br />Matthew R. Case, Engineer <br />CA # M41121 <br />HEALTH COMMENTS 10-23-20251 <br />CITY COMMENTS 01-05-20262 <br />HEALTH COMMENTS 01-19-20263 <br />CITY COMMENTS 04-21-20265 <br />REMOVE EXISTING 3/4" WATER LINE AND 3/4" WATER METER. <br />PROVIDE NEW 1" WATER METER AND 1" WATER SERVICE <br />LINE BACK TO EXISTING MAIN. VERIFY EXACT SIZE, <br />ROUTING, DELIVERY PRESSURE, AND WATER METER <br />INSTALLATION REQUIREMENTS WITH LANDLORD AND LOCAL <br />WATER UTILITY COMPANY PRIOR TO ANY WORK. PROVIDE <br />ALTERNATE BID FOR A BOOSTER PUMP SYSTEM IF FOUND <br />ON SITE. DOMESTIC WATER PRESSURE IS LESS THAN 65 PSI <br />STATIC. RECOMMENDED DOMESTIC METER SIZE 1" WITH A <br />DISTRIBUTION SIZE OF 1" IMMEDIATELY AFTER DOMESTIC <br />WATER METER TO THE FIXTURE IN TENANT <br />SPACE. <br />UPSIZE THE EXISTING 3/4" WATER METER TO 1" WATER <br />METER FOR DOMESTIC USE. NEW 1" WATER METER TO BE <br />INSTALLED BY CITY FORCES AFTER SUBMISSION OF A <br />WATER METER APPLICATION AND PAYMENT OF FEES. <br />CONTACT THE WATER RESOURCES DIVISION AT <br />714-647-3320 FOR ASSISTANCE. THE EXISTING 3/4" WATER <br />METER IS TO BE PROTECTED IN PLACE UNTIL REMOVED BY <br />CITY FORCES. PLEASE BE ADVISED THAT CITY FORCES WILL <br />NOT INSTALL THE NEW WATER METER UNTIL 1" METER <br />LAYING LENGTH REQUIREMENTS ARE MET PER STANDARD <br />PLAN NO. 1401. <br />1 <br />APPROVED AS NOTED