Laserfiche WebLink
GENERAL CONDITION NOTES <br />1.THESE DRAWINGS, NOTES, AND SCHEDULES CONVEY THE DESIGN INTENT. THE HIGHEST POSSIBLE QUALITY <br />OF WORKMANSHIP, MATERIAL, AND EQUIPMENT SHALL BE USED. <br />2.THESE DOCUMENTS INCORPORATE THE AIA GENERAL CONDITIONS OF THE CONTRACT FOR <br />CONSTRUCTION (AIA DOCUMENT A201 2017) AND SUPPLEMENTAL CONDITIONS PREPARED BY MAD, IF ANY, <br />BY REFERENCE. BIDDERS ARE REQUIRED TO BECOME FAMILIAR WITH THESE DOCUMENTS, WHICH CAN BE <br />OBTAINED FROM MAD. <br />3.THE BUILDING SHALL COMPLY WITH CBC CHAPTER 11B ACCESSIBILITY REQUIREMENTS AT ENTRANCE, PATH <br />OF TRAVEL TO AREA OF WORK, AND ANY REVISIONS OR ADDITIONAL WORK REQUIRED BY THE TENANT, FIELD <br />CONDITIONS, OR LOCAL GOVERNING AUTHORITIES SHALL BE BROUGHT TO THE ATTENTION OF THE <br />OWNER AND MAD BEFORE PROCEEDING, REGARDLESS OF COST, TIME, OR MATERIAL INCREASE. <br />4.ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF MUNICIPAL, <br />LOCAL OR FEDERAL AND STATE LAWS AS WELL AS ANY OTHER GOVERNING REQUIREMENTS, WHETHER OR <br />NOT SPECIFIED ON THE DRAWINGS. <br />5.CONTRACTOR SHALL ENSURE THAT INSTALLATION METHODS CONFORM TO ALL BUILDING CODE <br />REQUIREMENTS. THE MATERIALS SPECIFIED ARE INTENDED TO MEET CODE REQUIREMENTS. ANY <br />DISCREPANCY BETWEEN THE CONSTRUCTION DOCUMENTS AND CODE REQUIREMENTS SHALL BE BROUGHT <br />TO THE ATTENTION OF MAD IMMEDIATELY BY THE CONTRACTOR, AND PRIOR TO PERFORMANCE OF <br />SPECIFIED WORK. <br />6.WHERE THE CONTRACT DOCUMENTS CALL FOR ANY WORK OF A MORE STRINGENT NATURE THAN THAT <br />REQUIRED BY THE BUILDING CODE OR ANY OTHER DEPARTMENT HAVING JURISDICTION OVER THE WORK, <br />THE WORK OF THE MOST STRINGENT NATURE CALLED FOR BY THE CONTRACT, CONSTRUCTION NOTES, OR <br />DRAWINGS SHALL BE FURNISHED IN ALL CASES. <br />7.ALL WORK LISTED, SHOWN, OR IMPLIED ON ANY CONSTRUCTION DOCUMENT SHALL BE SUPPLIED AND <br />INSTALLED BY THE CONTRACTOR, UNLESS SPECIFICALLY NOTED "NOT IN CONTRACT". <br />8.THE CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION SCHEDULE TO THE OWNER INDICATING <br />PHASING OF WORK FROM START TO FINISH OF THE PROJECT. <br />9.INSURANCE AND BONDING FOR THE PROJECT SHALL BE AS DIRECTED BY AND TO THE SATISFACTION OF THE <br />OWNER. <br />10.THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LEGALLY REQUIRED APPROVALS AND PERMITS NECESSARY <br />FOR THE EXECUTION AND COMPLETION OF HIS WORK AND SHALL FORWARD COPIES OF EXECUTED PERMITS <br />TO MAD AND TO LANDLORD. <br />11.ALL MAD DRAWINGS AND ALL CONSTRUCTION NOTES ARE COMPLEMENTARY, AND WHAT IS CALLED FOR BY <br />EITHER WILL BE BINDING AS IF CALLED FOR BY ALL. ANY WORK SHOWN OR REFERRED TO ON ANY ONE SET <br />OF DRAWINGS SHALL BE PROVIDED AS THOUGH SHOWN ON ALL RELATED DRAWINGS. <br />12.THE CONTRACTOR IS WHOLLY RESPONSIBLE FOR THE COORDINATION AND SCHEDULING OF THE WORK <br />FOR ALL SUBCONTRACTORS, CRAFTSMEN, AND TRADESMEN REQUIRED TO COMPLETE THE JOB. <br />13.THE CONTRACTOR SHALL NOTIFY MAD IMMEDIATELY IF HE CANNOT COMPLY WITH ALL REQUIREMENTS <br />CALLED FOR ON THESE DRAWINGS. <br />14.THE CONTRACTOR SHALL NOTIFY MAD IMMEDIATELY OF ANY DISCREPANCIES OR OMISSIONS BETWEEN THE <br />DRAWINGS, THESE NOTES, AND FIELD CONDITIONS, AND REQUEST CLARIFICATION BEFORE COMMENCING <br />ANY WORK. <br />15.BY ENTERING INTO AN AGREEMENT WITH THE OWNER, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED <br />THE JOB SITE, FAMILIARIZED THEMSELVES WITH EXISTING CONDITIONS, AND NOTED ANY DISCREPANCIES <br />WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. <br />16.DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. LARGE SCALE DETAILS GOVERN OVER SMALLER SCALE <br />DETAILS. <br />17.ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED CONSTRUCTION <br />STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING THEIR DEFINITION, MAD SHALL BE NOTIFIED <br />FOR CLARIFICATION. <br />18.CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE RELATING TO THE <br />WORK OF EACH TRADE. NO ALLOWANCE SHALL BE MADE FOR ANY EXTRA EXPENSE OR EXTENSION OF TIME <br />DUE TO CONTRACTOR'S FAILURE OR NEGLIGENCE IN COMPLETELY EXAMINING THE JOB SITE. <br />19.CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT TO DETERMINE THE BUILDING OWNER'S RULES <br />FOR CONSTRUCTION, DELIVERIES, CONSTRUCTION TASKS TO BE PERFORMED OUTSIDE REGULAR BUSINESS <br />HOURS ONLY, AND ANY OTHER SPECIAL BUILDING REQUIREMENTS WHICH WILL AFFECT THE WORK. IF <br />OVERTIME WORK IS REQUIRED BY ANY TRADE, APPROVAL (INCLUDING COST APPROVAL) MUST BE OBTAINED <br />PRIOR TO THE EXECUTION OF ANY WORK. THE GENERAL INTENT IS THAT ALL WORK EXCEPT FOR <br />NOISE-GENERATING CONSTRUCTION SHALL BE PERFORMED ON REGULAR TIME. <br />20.THE GENERAL CONTRACTOR, SUBCONTRACTORS, AND ANY OTHER CONTRACTOR INVOLVED IN THIS <br />PROJECT SHALL TAKE NOTE THAT ANY COSTS DUE TO DEFECTIVE AND/OR ILL-TIMED WORK AS A RESULT OF, <br />BUT NOT LIMITED TO, INFERIOR WORKMANSHIP OR MATERIALS AND/OR IMPROPER SCHEDULING OR <br />DELINQUENT ORDERING, SHALL BE BORNE BY THE PARTY RESPONSIBLE. <br />21.THE GENERAL CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE MATERIALS FROM HIS OWN AND HIS <br />SUBCONTRACTORS' WORK, CARPET AND TELECOMS INSTALLATION, ETC., AND PROVIDE FOR ITS REMOVAL <br />FROM THE JOB SITE. <br />22.THE CONTRACTOR SHALL EXERCISE STRICT DUST CONTAINMENT CONTROL TO PREVENT DIRT OR DUST FROM <br />LEAVING THE JOB SITE. <br />23.THE CONTRACTOR SHALL PROVIDE PROTECTION DURING SITE WORK, DEMOLITION, AND CONSTRUCTION. <br />THE CONTRACTOR SHALL PROTECT ALL AREAS FROM DAMAGE WHICH MAY OCCUR DURING <br />CONSTRUCTION. ANY DAMAGE TO NEW AND EXISTING CONSTRUCTION, STRUCTURE, OR EQUIPMENT <br />SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER, AT THE EXPENSE OF THE <br />CONTRACTOR. <br />24.THE CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION DRAWINGS ON <br />SITE DURING ALL CONSTRUCTION PHASES FOR THE USE OF ALL TRADES. THE CONTRACTOR SHALL SEE THAT <br />ALL SUBCONTRACTORS RECEIVE COMPLETE SETS OF CONSTRUCTION DRAWINGS, OR ASSUME FULL <br />RESPONSIBILITY FOR COORDINATION OF WORK WHEN COMPLETE SETS ARE NOT AVAILABLE TO <br />SUBCONTRACTORS. <br />25.ALL EXISTING MANUFACTURED ITEMS NOT BEING REMOVED SHALL BE REFURBISHED AS REQUIRED, ANY <br />LOOSE ITEMS TIGHTENED (INCLUDING, BUT NOT LIMITED TO, EXIT SIGNS, DOWNLIGHTS, SPEAKERS, <br />MOLDINGS, ETC.), AND ANY MISSING PARTS REPLACED BY THE CONTRACTOR TO ACHIEVE A COMPLETE <br />INSTALLATION WITH A NEW APPEARANCE. <br />26.ALL REQUIRED EXITS, WAYS OF APPROACH THERETO, AND WAYS OF TRAVEL FROM THE EXIT INTO THE STREET <br />SHALL CONTINUOUSLY BE MAINTAINED FREE FROM ALL OBSTRUCTIONS AND IMPEDIMENTS FOR EGRESS IN <br />CASE OF FIRE OR OTHER EMERGENCY. <br />27.DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXIT SIGNS, EXIT <br />LIGHTING, FIRE PROTECTION DEVICES AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED. <br />28.THE CONTRACTOR SHALL VERIFY SIZE, LOCATION, ELECTRICAL REQUIREMENTS, AND CHARACTERISTICS OF <br />ALL WORK AND/OR EQUIPMENT SUPPLIED BY THE OWNER OR OTHERS PRIOR TO THE START OF RELATED <br />WORK WITH THE MANUFACTURER OR SUPPLIER. <br />29.MANUFACTURER'S NAME, TRADEMARK, LOGOS, ETC., SHALL NOT BE VISIBLE TO THE PUBLIC. <br />30.THE TENANT, WITHOUT INVALIDATING THE CONTRACT, MAY ORDER EXTRA WORK OR MAKE CHANGES BY <br />ALTERING, ADDING TO, OR DEDUCTING FROM THE WORK. THE CONTRACT SUM AND CLAIMS FOR <br />EXTENSION OF TIME SHALL BE ADJUSTED ACCORDINGLY. SUCH WORK SHALL BE OTHERWISE EXECUTED <br />UNDER THE CONDITIONS OF THE ORIGINAL CONTRACT. <br />31.ALL "EXISTING TO REMAIN", "EXISTING TO BE RELOCATED", AND/OR NEW ITEMS INSTALLED BY THE <br />CONTRACTOR, IN ADDITION TO BEING AMPLY PROTECTED THROUGHOUT THE PERIOD OF CONSTRUCTION, <br />SHALL BE THOROUGHLY CLEANED TO THE SATISFACTION OF MAD PRIOR TO BEING TURNED OVER TO THE <br />OWNER. <br />32.THE CONTRACTOR AGREES TO PAY ALL TRANSPORTATION CHARGES ON ALL MATERIAL AND EQUIPMENT TO <br />THE POINT OF USE AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, CHECKING, AND STORING OF SAME <br />IN CONNECTION WITH THIS CONTRACT. <br />33.IF THE CONTRACTOR CLAIMS THAT ANY REVISION TO THE DRAWINGS INVOLVES EXTRA COST UNDER THIS <br />CONTRACT, HE SHALL GIVE WRITTEN NOTICE TO MAD WITHIN A REASONABLE TIME AFTER RECEIPT OF SUCH <br />INSTRUCTIONS AND IN ANY EVENT, BEFORE PROCEEDING TO EXECUTE THE WORK. THE PROCEDURE SHALL <br />THEN BE AS PROVIDED FOR IN THE AGREEMENT UNDER "CHANGES IN THE WORK". NO SUCH CLAIMS SHALL <br />BE VALID UNLESS SO MADE. UNLESS OTHERWISE AGREED, NO PAYMENT ON SUCH BILLS WILL BE MADE UNTIL <br />FINAL SETTLEMENT. <br />34.ALL CLAIMS FOR ADDITIONAL WORK WILL BE SUBMITTED IN WRITING FOR REVIEW BY MAD AND SHALL <br />INCLUDE A COMPLETE DESCRIPTION OF THE WORK, MATERIALS USED, ROOM NUMBER OF THE AREA OF <br />WORK, AND AUTHORIZATION UNDER WHICH THE WORK IS BEING PERFORMED. TOTAL COST OF THE WORK, <br />INCLUDING THE CONTRACTOR'S MARK-UP, SHALL BE INCLUDED IN THE SUBMITTAL. <br />35.THE CONTRACTOR SHALL PROVIDE BLOCKING, BACKING, FRAMING HANGERS, OR OTHER SUPPORT FOR ALL <br />FIXTURES, EQUIPMENT, CABINETRY, FURNISHINGS, AND ALL OTHER ITEMS AS REQUIRED. <br />36.MAXIMUM ROOM OCCUPANT LOAD SIGNS SHALL BE FURNISHED AND INSTALLED AS REQUIRED BY THE LOCAL <br />GOVERNING BUILDING CODE. <br />37.AT THE TIME OF BID SUBMITTAL, THE CONTRACTOR SHALL ADVISE MAD, IN WRITING, OF ANY SPECIFIED <br />MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN THE COMPLETION <br />OF CONSTRUCTION. <br />38.THE CONTRACTOR SHALL PROVIDE AND INSTALL ROUGH PLUMBING AND FINAL HOOK-UP FOR ALL SPECIFIED <br />FIXTURES AND APPLIANCES AND SHALL SUPPLY ALL SUCH FIXTURES AND APPLIANCES, U.O.N. <br />39.PRIOR TO INSTALLATION OF CARPET AND WINDOW COVERING, THE CONTRACTOR SHALL MAINTAIN THE <br />SPACE IN BROOM CLEAN CONDITION WHETHER OR NOT SUCH INSTALLATION IS THE CONTRACTOR'S <br />RESPONSIBILITY. <br />40.THE CONTRACTOR SHALL PROVIDE ALLOWANCE FOR APPLIANCES, U.O.N. <br />41.THE CONTRACTOR SHALL LEAVE THE BUILDING IN A LOCKABLE CONDITION DURING THE PERIOD OF THIS <br />WORK WHEN THE CONTRACTOR'S WORKMEN ARE NOT PRESENT AT THE JOB SITE. <br />42.THE CONTRACTOR SHALL DEACTIVATE ALL UTILITY LINES IN CONTRACT AREA PRIOR TO START OF WORK AS <br />NECESSARY, AFTER SECURING OWNER'S PERMISSION. <br />43.THE CONTRACTOR SHALL PATCH, REPAIR, REPLACE, AND/OR REFINISH EXISTING CONSTRUCTION AS <br />NECESSARY TO REFURBISH THE AREA OF WORK. <br />44.ANY AND ALL PROPOSED REVISIONS SHALL BE SUBMITTED IN THE FORM OF A WRITTEN CHANGE ORDER TO <br />BE APPROVED AND AUTHORIZED BY MAD AND THE OWNER PRIOR TO START OF PROPOSED WORK. <br />45.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LIFE SAFETY EQUIPMENT AS REQUIRED BY <br />STATE AND LOCAL BUILDING CODES. <br />46.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF THE FIRE SPRINKLER <br />CONTRACTOR, WHO SHALL DESIGN AND PROVIDE CERTIFIED SPRINKLER DRAWINGS FOR MAD'S APPROVAL. <br />47.THE CONTRACTOR SHALL HOLD HARMLESS THE TENANT, BUILDING OWNER, MAD, AND THEIR <br />REPRESENTATIVES OF ANY LEGAL ACTION ARISING AS A RESULT OF THE CONTRACTOR'S WORK. <br />48.DAMAGE TO WORK SHALL BE REPAIRED BY THE TRADE WHOSE WORK IS DAMAGED AND CHARGED TO THE <br />PARTY RESPONSIBLE FOR THE DAMAGE. <br />49.THE GENERAL CONTRACTOR SHALL PROVIDE ALL FLOOR CUTOUTS AND PATCHING REQUIRED FOR <br />INSTALLATION OF ALL WORK. <br />50.CONTRACTOR TO INFORM MAD WHEN CHALKLINE LAYOUT OF PARTITIONS IS COMPLETED SO THAT IT CAN <br />BE VERIFIED AND ANY REQUIRED CHANGES MADE PRIOR TO CONSTRUCTION. <br />51.ALL PLUMBING FIXTURES SHALL BE SUPPLIED AND INSTALLED BY PLUMBING CONTRACTOR. GENERAL <br />CONTRACTOR SHALL COORDINATE SUPPLY OF ALL NECESSARY INFORMATION ON REQUIRED CUTOUTS TO <br />MILLWORK CONTRACTOR. <br />52.ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE <br />ACCEPTANCE OF THE PROJECT BY THE OWNER, UNLESS STATED OTHERWISE. <br />53.CONTRACTOR SHALL PROVIDE SUBMITALS AS ELECTRONIC FILE (PDF PREFERRED, OR U.O.N.) TO MAD FOR <br />DESIGN APPROVAL AFTER HE HAS REVIEWED THEM FOR CONSTRUCTIBILITY, COORDINATION BETWEEN <br />TRADES, AND CONFORMANCE WITH THE CONTRACT DOCUMENTS. <br />54.THE CONTRACTOR SHALL SUBMIT (3) SAMPLES OF FINISH MATERIALS, FIXTURES AND EQUIPMENT TO MAD FOR <br />APPROVAL PRIOR TO INSTALLATION. THE CONTRACTOR SHALL BE WHOLLY LIABLE IF HE FAILS TO DO SO, <br />WHETHER MATERIALS ARE SPECIFIED CORRECTLY OR INCORRECTLY IN THE CONTRACT DOCUMENTS. <br />55.PROVIDE LIST OF ALL SUBMITTALS WITH SCHEDULE FOR TIMELY REVIEW OR RE-SELECTION IF REQUIRED. A <br />MINIMUM OF ONE (1) WEEK TIME FRAME FOR REVIEW OF ANY SUBMITTAL IS REQUIRED, UNLESS <br />ARRANGEMENTS FOR EXPEDITED REVIEW WITH MAD IS ACCEPTED. <br />56.GC SHALL SUBMIT THE LIGHTING PACKAGE TO MAD FOR REVIEW WITHIN THE FIRST TWO WEEKS AFTER <br />CONTRACT HAS BEEN AWARDED TO ENSURE SUFFICIENT TIME FOR REVIEW. A MINIMUM OF ONE (1) WEEK <br />TIME FRAME FOR REVIEW OF LIGHTING PACKAGE SUBMITTAL IS REQUIRED, UNLESS ARRANGEMENTS FOR <br />EXPEDITED REVIEW WITH MAD IS ACCEPTED. <br />57.BEFORE ACCEPTANCE BY THE OWNER, THE COMPLETED CONSTRUCTION SHALL BE CLEANED, LABELS <br />REMOVED, AND ALL OTHER TOUCH UP COMPLETED. <br />58.CONTRACT CLOSE-OUT SHALL OCCUR ONLY AFTER MAD HAS PREPARED THE CERTIFICATE OF SUBSTANTIAL <br />COMPLETION AND PUNCH LIST, AND PUNCH LIST ITEMS HAVE BEEN CORRECTED. THE CONTRACTOR SHALL <br />SUBMIT MAINTENANCE AND WARRANTY MANUALS, RELEASE OF LIENS, AND RECORD DRAWINGS TO MAD <br />WITH HIS FINAL APPLICATION FOR PAYMENT. MAD SHALL PREPARE ANY NECESSARY CHANGE ORDERS <br />REQUIRED TO FINALIZE THE COST OF THE PROJECT BASED ON THE CONTRACTOR'S FINAL SUBMITTALS. <br />GENERAL PARTITION NOTES <br />1.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL PARTITIONS INDICATED ON THE DRAWINGS. <br />2.VERIFY ALIGNMENTS IN FIELD. NOTIFY MAD IMMEDIATELY IF MISALIGNMENT OF EXISTING ELEMENTS SHOULD <br />OCCUR. <br />3.THE CONTRACTOR SHALL USE CORNER BEADS AT ALL EXPOSED CORNERS AND EXPOSED ENDS IN PLASTER <br />AND DRYWALL PARTITIONS. <br />4.ALL PARTITIONS SHALL BE ANCHORED PER MANUFACTURERS' SPECIFICATIONS AND AS REQUIRED BY <br />APPLICABLE BUILDING CODES. <br />5.BRING TO THE ATTENTION OF MAD ANY FIELD CONDITIONS THAT DO NOT ALLOW CONSTRUCTION OR <br />INSTALLATION AS DRAWN. <br />6.NOTE ANY BASE BUILDING DEFICIENCIES BEFORE THE START OF CONSTRUCTION TO MAD. <br />7.MAD SHALL HAVE THE RIGHT TO REVIEW AND APPROVE CHALK LINES PRIOR TO INSTALLATION OF TRACKS. <br />MAD SHALL BE NOTIFIED OF ANY DEVIATION FROM DIMENSIONS OR CLEARANCES INDICATED ON PLANS <br />REQUIRED DUE TO FIELD CONDITION. <br />8.THE CONTRACTOR SHALL SUPPLY ALL RETURN AIR OPENINGS IN SLAB TO SLAB PARTITIONS ABOVE CEILINGS <br />AS REQUIRED BY ENGINEERING DRAWINGS. ALL OPENINGS IN DEMISING AND SOUND-ATTENUATED <br />PARTITIONS SHALL HAVE SOUND BOOTS AND ALL OPENINGS IN FIRE-RATED PARTITIONS SHALL HAVE FIRE <br />DAMPERS AS REQUIRED BY LOCAL BUILDING CODES. CONTRACTOR SHALL COORDINATE WITH <br />ENGINEERING DRAWINGS AND INFORM MAD OF DISCREPANCIES PRIOR TO BIDDING. <br />9.THE CONTRACTOR SHALL PROVIDE SUFFICIENT FRAMING IN PARTITIONS TO ACCOMMODATE ALL DUCT <br />WORK. RETURN AIR OPENINGS AND GRILLS ABOVE AND BELOW CEILINGS SHALL BE COORDINATED WITH <br />MECHANICAL ENGINEERING DRAWINGS AND MECHANICAL CONTRACTOR'S SHOP DRAWINGS. ALL <br />OPENINGS SHALL BE PROPERLY SEALED FOR SOUNDPROOFING AND AGAINST VIBRATION. <br />10.THE CONTRACTOR SHALL PROVIDE AND INSTALL ACCESS PANELS AS REQUIRED FOR MECHANICAL, <br />ELECTRICAL, AND PLUMBING INSTALLATIONS PER APPLICABLE BUILDING CODES. CONTRACTOR SHALL <br />COORDINATE TYPE AND LOCATION OF ACCESS PANELS WITH MAD PRIOR TO INSTALLATION. <br />11.THE GENERAL CONTRACTOR SHALL COORDINATE ALL PLUMBING ROUGH-INS, FIXTURES AND ACCESSORIES <br />INDICATED IN THE DRAWINGS. <br />12.THE GENERAL CONTRACTOR SHALL COORDINATE ALL VALVES AS INDICATED IN THE DRAWINGS AND/OR AS <br />REQUIRED FOR THE PROPER CONTROL OF THE PIPING AND APPARATUS INSTALLED AS PART OF THIS PROJECT <br />SO THAT ANY FIXTURE, LINE OR APPARATUS MAY BE CUT OFF AND REPAIRED WITHOUT INTERFERENCE OR <br />INTERRUPTION OF SERVICE TO THE REMAINDER OF THE BUILDING. <br />13.ALL PIPING SHALL BE TESTED AND INSPECTED AS REQUIRED BY THE AUTHORITIES HAVING JURISDICTION, <br />BEFORE CLOSING OR CONCEALING IN PARTITIONS. <br />14.GENERAL CONTRACTOR SHALL COORDINATE WITH MILLWORK CONTRACTOR/FURNITURE MANUFACTURER <br />FOR EXACT STUD LOCATIONS AND HEIGHTS OF MILLWORK AND FURNITURE BACKING PRIOR TO <br />INSTALLATION OF GYPSUM BOARD. <br />15.IF OUTLETS ARE INSTALLED DIRECTLY INTO CORE WALLS, SEAL/INSULATE AS REQUIRED PER CODES TO <br />MAINTAIN THE INTEGRITY OF WALL RATING. REFER TO POWER AND SIGNAL PLAN FOR LOCATIONS. <br />16.PATCH/REPAIR ALL EXISTING TO REMAIN PARTITIONS, TO RECEIVE A NEW FINISH. <br />17.INSTALL FIRE DAMPERS IN ALL DUCTS PENETRATING RATED CORRIDOR WALLS AND/OR CEILINGS. DAMPERS <br />ARE TO COMPLY WITH LOCAL MUNICIPAL CODES. <br />18.IN SOUND RATED ROOMS, ALL WALL AND FLOOR PENETRATIONS FOR PIPES, DUCTS AND OUTLETS SHALL BE <br />SEALED WITH AN ACOUSTICAL SEALANT AND CONCEALED OR RECESSED FIXTURES SHALL BE COVERED OR <br />BACKED WITH A SOUND ATTENUATION BLANKET. <br />19.PROVIDE WATER RESISTANT GYPSUM BOARD IN ALL TOILETS AND SHOWER ROOMS. <br />20.INSTALL COMBINATION FIRE/SMOKE DAMPERS AT ALL DUCTS PENETRATING RATED CORRIDOR WALL(S) <br />AND/OR CEILING(S). DAMPERS SHALL COMPLY WITH CBC CHAPTER 7. <br />21.THE GENERAL CONTRACTOR SHALL VERIFY THE MANUFACTURER OF ALL EXISTING INTERIOR BUILDING <br />ELEMENTS BUT NOT LIMITED TO DOOR FRAMES, DOORS, DOOR HARDWARE, FIRE EXTINGUISHER CABINETS, <br />MILLWORK FINISHES, AND MILLWORK HARDWARE. <br />22.WHEN NEW INTERIOR BUILDING ELEMENTS ARE TO MATCH EXISTING THE GENERAL CONTRACTOR SHALL <br />SUBMIT SAMPLES OF PROPOSED NEW AND EXISTING ELEMENTS FOR REVIEW AND APPROVAL PRIOR TO <br />COMMENCEMENT OF INSTALLATION OF SUCH ELEMENTS. <br />23.GYPSUM BOARD NOTES: <br />a.ALL GYPSUM BOARD SHEETS TO RUN VERTICALLY. <br />b.TAPE OUTER JOINTS OF GYPSUM BOARD ONLY. <br />c.NO JOINTS EXCEPT AT STUDS. <br />d.DRYWALL SCREW EDGE AND FIELD SPACING PER GYPSUM BOARD MANUFACTURERS' RECOMMENDATIONS. <br />e.ALL SCREWS SHALL ENGAGE STUDS, MINIMUM CSTC 40-44. <br />f.FIBERGLASS BATT INSULATION SHALL BE OWENS/CORNING FIBERGLASS NOISE BARRIER BATTS, OCF <br />FRICTION FIT OR APPROVED EQUAL. FIBERGLASS THICKNESS TO EQUAL STUD DEPTH. <br />g.STAGGER JOINTS OF GYPSUM BOARD WHERE MULTIPLE LAYERS OCCUR. <br />h.DO NOT GLUE MULTIPLE LAYERS OF GYPSUM BOARD TOGETHER. <br />i.NO MECHANICAL TIES BETWEEN OPPOSITE SIDES OF PARTITION. <br />j.ALL GYPSUM BOARD SHALL BE 5/8" TYPE "X" UNLESS OTHERWISE NOTED ON PLANS. <br />k.TAPE, BED, AND SAND SMOOTH ALL CORNERS AND JOINTS TO RECEIVE WALL FINISH. <br />GENERAL POWER & DATA NOTES <br />1.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL LIGHT FIXTURES AND ELECTRICAL WORK AS SHOWN OR <br />IMPLIED IN DRAWINGS AND NOTES. <br />2.ALL LIGHT SWITCHES SHALL BE CIRCUITED AND INSTALLED TO COMPLY WITH APPLICABLE LOCAL CODES AND <br />STATE ENERGY REQUIREMENT. <br />3.THE MECHANICAL AND ELECTRICAL DRAWINGS ARE SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. IT <br />IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK DRAWINGS FOR COORDINATION PRIOR TO BIDDING AND <br />AGAIN PRIOR TO INSTALLATION OF MECHANICAL AND ELECTRICAL WORK. ANY DISCREPANCY BETWEEN THE <br />DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF MAD FOR CLARIFICATION. WORK INSTALLED IN <br />CONFLICT WITH MAD'S DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT THE CONTRACTOR'S <br />EXPENSE AND SHALL NOT IMPACT THE SCHEDULE. <br />4.REFER TO ENGINEERING DRAWINGS FOR CIRCUITING AND EXACT SPECIFICATIONS. MECHANICAL AND <br />ELECTRICAL ENGINEERS' DRAWINGS ARE NOT INTENDED TO INDICATE EXACT LOCATIONS OF FIXTURES OR <br />EQUIPMENT. REFER TO MAD'S DRAWINGS FOR LOCATIONS OF FIXTURES, OUTLETS AND EQUIPMENT. <br />5.VERIFY COMMUNICATIONS REQUIREMENTS AND RACKS, RISERS, CIRCUITING, ETC. WITH APPROPRIATE <br />CONSULTANT DRAWINGS. PROVIDE BACK BOX WITH BLANK COVER PLATE AND CONDUIT STUB-UP TO <br />CEILING FOR CARD READERS. VERIFY SIZE AND LOCATION OF BACK BOX AND CONDUIT. <br />6.GENERAL CONTRACTOR TO COORDINATE ALL NEW SECURITY SYSTEM WORK WITH TENANT'S SECURITY <br />VENDER & ELECTRICAL ENGINEER DRAWINGS. CONTRACTOR TO PROVIDE ALL CONDUITS AND POWER AS <br />REQUIRED. CONTRACTOR TO ALSO VERIFY LOCATION OF SECURITY MONITORING SYSTEM PRIOR TO <br />INSTALLATION. NOTIFY MAD OF ANY CONFLICTS BETWEEN DRAWINGS PRIOR TO ORDERING OR INSTALLING <br />MATERIALS. <br />7.REFER TO MAD'S DRAWINGS FOR EXACT SPECIFICATIONS AND LOCATIONS OF FIXTURES, OUTLETS AND <br />EQUIPMENT. <br />8.REFER TO ELECTRICAL ENGINEER DRAWINGS FOR ADDITIONAL EQUIPMENT/DEVICE REQUIREMENTS. <br />9.THE GC SHALL BE RESPONSIBLE FOR VERIFYING THE EQUIPMENT'S ENVIRONMENTAL & ELECTRICAL <br />REQUIREMENTS. <br />10.CONTRACTOR SHALL VERIFY QUANTITY AND LOCATION OF EXISTING OUTLETS SHOWN TO REMAIN. ADVISE <br />MAD OF ANY CONFLICTS PRIOR TO CONSTRUCTION. <br />11.THE CONTRACTOR SHALL COORDINATE HIS WORK WITH MANUFACTURERS' SPECIFICATIONS AND <br />REQUIREMENTS. <br />12.THE WORK SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL <br />BOARD OF FIRE UNDERWRITERS, PUBLIC UTILITIES COMPANY, OWNER'S AND LANDLORD'S <br />COMMUNICATIONS COMPANY, AND ALL OTHER AUTHORITIES HAVING JURISDICTION. <br />13.ALL NEW MATERIALS REQUIRED SHALL CONFORM TO THE STANDARDS OF UNDERWRITERS' LABORATORIES, <br />INC. IN EVERY CASE WHERE SUCH A STANDARD HAS BEEN ESTABLISHED, U.O.N. <br />14.GENERAL CONTRACTOR TO COORDINATE SECURING OF PERMITS FOR LOW VOLTAGE WIRING. <br />15.GENERAL CONTRACTOR TO COORDINATE SECURING OF PERMITS FOR FIRE/LIFE SAFETY DEVICES. <br />16.THE CONTRACTOR SHALL FURNISH, INSTALL, AND COORDINATE ANY ELECTRICAL AND/OR LIGHTING ITEMS <br />WITH CABINET WORK AS REQUIRED, U.O.N. <br />17.THE CONTRACTOR SHALL COORDINATE ANY COMMUNICATIONS/DATA & AV REQUIREMENTS WITH THE <br />OWNER'S IT/AV CONTRACTOR AS REQUIRED. <br />18.THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY ELECTRICAL SERVICE AND LIGHTING FOR ALL TRADES AS <br />REQUIRED. <br />19.PROVIDE COMMUNICATIONS/DATA/AV OUTLETS AND ALL NECESSARY CONDUIT RUNS AS SHOWN ON <br />POWER AND DATA PLANS. <br />20.PROVIDE SLEEVES IN RATED PARTITIONS ABOVE CEILING FOR COMMUNICATIONS/DATA. VERIFY THE SIZE OF <br />REQUIRED CONDUITS WITH COMMUNICATIONS/DATA CONTRACTOR AND TENANT PRIOR TO START OF <br />WORK. <br />21.ALL POWER, COMMUNICATIONS/DATA, AND AV CONDUIT SHALL BE CONCEALED IN PARTITIONS AND/OR <br />CEILINGS. <br />22.PROVIDE METER, METER LOOP, AND SERVICE IN ACCORDANCE WITH LOCAL AND ELECTRICAL RUNS AS THEY <br />OCCUR. <br />23.PROVIDE POWER DISTRIBUTION TO ALL LIGHTING AND EQUIPMENT. <br />24.PROVIDE SERVICE AND CONNECTIONS FOR HVAC EQUIPMENT AND CONTROLS. <br />25.PROVIDE ALL PANELS, CUTTERS AND DISCONNECTS. <br />26.PROVIDE PANEL COMPLETE WITH TYPEWRITTEN DIRECTORY AND SPLIT BARS FOR TIME-CONTROLLED <br />CIRCUITS. <br />27.COORDINATE CONTROL WIRING WITH HVAC CONTRACTOR. <br />28.PROVIDE SERVICE, OUTLETS, OR CONNECTION AS REQUIRED FOR FIXTURES AND/OR EQUIPMENT FURNISHED <br />AND INSTALLED BY OTHERS. <br />29.ALL NEW COMMUNICATIONS AND/OR DATA CONDUIT SHALL BE 3/4"Ø STUB UP 10" ABOVE PARTITION WITH <br />90 DEGREE SWEEP TO PLENUM SPACE. PROVIDE PLASTIC BUSHING AT STUB UP CONDUIT. <br />30.ALL NEW AV CONDUIT SHALL BE 1-1/4"Ø (U.O.N.) STUB UP 10" ABOVE PARTITION WITH 90 DEGREE SWEEP TO <br />PLENUM SPACE. PROVIDE PLASTIC BUSHING AT STUB UP CONDUIT. <br />28.ALL VOICE AND DATA WIRING SHALL BE PLENUM RATED. CONTRACTOR SHALL PROVIDE WALL BOX AND <br />CONDUIT FROM BOX TO CEILING PLENUM. CONDUIT SHALL HAVE PULL STRINGS. COORDINATE WITH <br />TENANTS VOICE/DATA CONSULTANT. <br />29.THE MINIMUM SIZE JUNCTION BOX FOR ALL WALL MOUNTED OUTLETS SHALL BE 4S, DEEP. THIS SHALL <br />INCLUDE, BUT NOT BE LIMITED TO ELECTRICAL, PHONE/DATA, AUDIO/VISUAL AND SECURITY. REFER TO <br />ELECTRICAL ENGINEER'S DRAWINGS. <br />30.JUNCTION BOXES AT ALL ACOUSTICAL PARTITION SHALL RECEIVE 'LOWRY' OR APPROVED EQUAL, BOX PADS <br />(MIN. 1/8" THICK, PERMANENTLY RESILIENT MATERIAL) ALL HOLES IN JUNCTION BOXES SHALL BE COMPLETELY <br />COVERED WITH PADS, MOLDED AND PRESSED ONTO THE BACK AND SIDES OF BOX. <br />31.PROVIDE EXTENSION RING AT FIRE ALARM BOXES & WALL OUTLETS ALONG CORE WALLS WHEREVER FURRED <br />PARTITIONS & FABRIC-WRAPPED/TACKABLE WALL SURFACES OCCUR. REFER TO ELEVATIONS & FINISH PLAN(S) <br />FOR LOCATIONS OF THESE CONDITIONS. <br />32.THE GC SHALL SUBMIT, FOR DESIGNER'S APPROVAL, SAMPLES OF ALL SWITCHES, ELEC, COMMUNICATIONS & <br />DATA OUTLETS & ANY OTHER ELECTRICAL DEVICES THAT ARE TO BE SURFACE-MOUNTED ON THE PROJECT <br />(INCLUDING SUBCONTRACTOR DEVICES) PRIOR TO INSTALLATION. <br />33.THE GC SHALL SUBMIT TO MAD FOR APPROVAL, PLANS INDICATING LOCATIONS OF SURFACE-MOUNTED <br />FIRE/LIFE SAFETY DEVICES, INCLUDING STROBE LIGHTS, PRIOR TO INSTALLATION. <br />GENERAL DEMOLITION NOTES <br />1.THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIAL AS REQUIRED TO COMPLETE <br />DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED ON PLANS OR AS OTHERWISE DIRECTED BY <br />OWNER/TENANT. <br />2.THE GENERAL CONTRACTOR SHALL EXECUTE ALL WORK WITHIN THE REGULATIONS OF THE BUILDING FOR <br />DEMOLITION AND REMOVAL OF DEBRIS, INCLUDING OVERTIME WORK REQUIRED. <br />3.PRIOR TO FINAL BID SUBMITTAL, THE GENERAL CONTRACTOR SHALL VERIFY IF ANY EXISTING PIPING, HVAC OR <br />ANY OTHER BUILDING SYSTEM COMPONENTS NEED TO BE RELOCATED IN ORDER TO ACCOMMODATE THE <br />PROPOSED DESIGN. IF SO, SUCH MODIFICATIONS ARE TO BE IDENTIFIED IN THE BID AND PRESENTED TO <br />THE CLIENT/DESIGNER TO ACCEPT OR REJECT. CHANGE ORDERS FOR THESE KINDS OF MODIFICATIONS <br />WILL NOT BE ACCEPTED DURING CONSTRUCTION. <br />4.PRIOR TO FINAL BID SUBMITTAL, THE GENERAL CONTRACTOR SHALL VERIFY IF THE EXISTING CEILING SYSTEM <br />NEEDS TO BE UPGRADED TO COMPLY WITH LOCAL BUILDING AND SEISMIC CODES. IF SO, THIS SHALL BE <br />INCLUDED IN THE BID/BASE SCOPE OF WORK. CHANGE ORDERS FOR THIS MODIFICATION WILL NOT BE <br />ACCEPTED DURING CONSTRUCTION. <br />5.ALL DEMOLITION AND CONSTRUCTION SHALL BE PERFORMED DURING HOURS DETERMINED BY LANDLORD. <br />(MAY REQUIRE WORK BE PERFORMED AFTER HOURS AND DURING WEEKEND). THE GENERAL CONTRACTOR <br />SHALL PREPARE SCHEDULE OF PHASES AND TIME OF PERFORMANCE FOR OWNER/TENANT AND CLIENT'S <br />REVIEW AT BID SUBMITTAL. <br />6.GENERAL CONTRACTOR SHALL CONTACT LANDLORD IN ADVANCE TO ARRANGE WHERE STOCK CAN BE <br />MOVED/STORED. <br />7.THE GENERAL CONTRACTOR SHALL AT ALL TIMES PROTECT THE PROPERTY OF THE BUILDING OWNER, <br />INCLUDING BUT NOT LIMITED TO, WINDOWS, MULLIONS, ELECTRICAL AND AIR CONDITIONING <br />EQUIPMENT, CONVECTOR ENCLOSURES, ETC. COLUMNS, FLOORS AND CEILING TILES, PUBLIC TOILETS, <br />ELEVATORS, DOORS, BUCKS. <br />8.THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, FITTING AND PATCHING WORK THAT MAY BE <br />REQUIRED TO MAKE ALL PARTS COME TOGETHER PROPERLY, AND FIT TO RECEIVE OR BE RECEIVED BY WORK <br />OF OTHER CONTRACTORS SHOWN UPON OR REASONABLY IMPLIED BY THE DRAWINGS AND NOTES. <br />9.CONTRACTOR SHALL PROVIDE ALL SUPPORTS AND SEISMIC BRACING REQUIRED FOR EXISTING BUILDING <br />ELEMENTS THAT ARE TO REMAIN (DUCTS, PIPES, ACOUSTICAL CEILING HANGER WIRES, LIGHT FIXTURES, <br />CONDUITS, SPRINKLER LINES, ETC.). <br />10.ALL WORK DEMOLISHED SHALL BE REMOVED FROM THE PREMISES EXCEPT ITEMS TO BE RE-USED OR <br />RETURNED TO TENANT OR AS OTHERWISE NOTED. <br />11.THE GENERAL CONTRACTOR SHALL REMOVE FROM PREMISES CONDUITS LEFT AFTER WALL DEMOLITION, <br />INCLUDING SWITCH BOXES, PLATES, BRIDGES, OR ANY OTHER TELEPHONE OR ELECTRICAL WIRING AND <br />EQUIPMENT. U.O.N. <br />12.THE GENERAL CONTRACTOR SHALL FURNISH A SYSTEM OF TEMPORARY LIGHTS THROUGHOUT THE SPACE <br />UNDER CONSTRUCTION AS REQUIRED. <br />13.THE GENERAL CONTRACTOR SHALL CAP AND FLUSH OFF BEHIND FINISH SURFACES ALL PROJECTING <br />PLUMBING, FLOOR ELECTRICAL/TELEPHONE OUTLETS, AND ALL OTHER PROJECTING ITEMS WHICH ARE BEING <br />ABANDONED. <br />14.TERMINATE AND PATCH ALL ABANDONED/UNUSED ELECTRICAL, DATA/TELEPHONE OUTLETS, THERMOSTATS <br />AND LIGHT SWITCHES AS NOTED ON PLANS. <br />15.PIPES AND CONDUIT ENCOUNTERED IN DEMOLISHED PARTITIONS AND AREAS WHICH ARE TO REMAIN IN USE <br />SHALL BE RE-ROUTED AND CONCEALED. THOSE WHICH ARE TO BE ABANDONED SHALL BE CAPPED AND <br />CONCEALED IN FLOOR, WALL OR CEILING. <br />16.UPON COMPLETION OF THE DEMOLITION WORK, THE GENERAL CONTRACTOR SHALL PROVIDE THAT ALL <br />AREAS BE LEFT BROOM CLEAN. <br />Sheet Title: <br />ISSUE DATE <br />ISSUE FOR PLANCHECK 12.22.2025 <br />All drawings and written material appearing herein constitute the original and <br />unpublished work of MAD Studio and the same may not be duplicated, used <br />or disclosed without the written consent of MAD Studio. <br />Sheet No.: <br />ISSUE DESCRIPTION <br />ENGINEER/CONSULTANT <br />ARCHITECT/ENGINEER STAMP <br />30 <br />5 <br /> <br />W <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />CA <br />F <br />E <br />OA <br />S <br />I <br />S <br />CLIENT <br />www.madstudiola.com <br />CITY STAMP <br />Project Director: <br />Project Designer: <br />Project Tech: <br />Project No:25030.300E.M. <br />E.M. <br />S.P. <br />ISSUED FOR MEP 01.13.2026 <br />ISSUED FOR PLAN CHECK COMMENTS- PLANNING DEPT.01.22.2026 <br />ISSUED FOR PRICING 02.17.2026 <br />ISSUED FOR PLAN CHECK COMMENTS - PLANNING DEPT.02.20.2026 <br />ISSUED FOR COUNTY REVIEW 03.24.2026 <br />ISSUED FOR ADDENDUM A 03.27.2026 <br />ISSUED FOR BUILDING DEPT REVIEW 04.08.2026 <br />ISSUED FOR BUILDING DEPT REVIEW - RESUBMITTAL 05.05.2026 <br />ISSUED FOR BUILDING DEPT CORRECTIONS 05.20.2026 <br />ID0.1 <br />GENERAL NOTES