GENERAL REFLECTED CEILING PLAN NOTES
<br />1.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL LIGHT FIXTURES AND ELECTRICAL WORK AS SHOWN OR
<br />IMPLIED IN DRAWINGS AND NOTES.
<br />2.THE MECHANICAL AND ELECTRICAL DRAWINGS ARE SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. IT
<br />IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK DRAWINGS FOR COORDINATION PRIOR TO BIDDING AND
<br />AGAIN PRIOR TO INSTALLATION OF MECHANICAL AND ELECTRICAL WORK. ANY DISCREPANCY BETWEEN THE
<br />DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF MAD FOR CLARIFICATION. WORK INSTALLED IN
<br />CONFLICT WITH MAD'S DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT THE CONTRACTOR'S
<br />EXPENSE AND SHALL NOT IMPACT THE SCHEDULE.
<br />3.CEILING HEIGHTS AND DETAILING SHALL BE AS INDICATED IN DRAWINGS. ANY DEVIATION FROM HEIGHT OR
<br />DETAILING INDICATED SHALL BE SUBMITTED TO MAD FOR REVIEW PRIOR TO BIDDING.
<br />4.REFER TO PLAN FOR ALL CEILING HEIGHTS. GENERAL CONTRACTOR SHALL VERIFY CLEARANCES BETWEEN
<br />DUCTWORK, LIGHT FIXTURES, AND OTHER OBSTRUCTIONS IN THE CEILING PLENUM TO ASSURE THE FINISH
<br />CEILING HEIGHT.
<br />5.FOR DETAILS AND SPECIFICATIONS OF LIGHTING FIXTURES, SWITCHES, PANEL BOXES, DIMMER CONTROLS,
<br />CIRCUITING, AIR CIRCUITING, AIR CONDITIONING, DUCTWORK AIR SUPPLY DIFFUSERS, AIR RETURN GRILLES,
<br />JUMP DUCT, THERMOSTATS, SMOKE DETECTORS, ETC., SEE ELECTRICAL AND MECHANICAL DRAWINGS.
<br />6.THE CEILING WORK SHALL BE CLOSELY COORDINATED WITH THAT OF OTHER TRADES WHEREVER IT IS
<br />CONTIGUOUS.
<br />7.GENERAL CONTRACTOR SHALL ENSURE COMPLIANCE WITH CURRENT TITLE 24.
<br />8.GENERAL CONTRACTOR TO RE-CIRCUIT/RE-SWITCH ALL LIGHTING AS REQUIRED TO COMPLY WITH NEW
<br />DESIGN AND LOCAL CODES. SWITCHING OF ALL OFFICES/ENCLOSED ROOMS SHALL COMPLY WITH TITLE 24
<br />REQUIREMENTS.
<br />9.GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS AND DIMENSIONS AND NOTIFY MAD
<br />OF ANY DISCREPANCIES ADVERSELY AFFECTING THE LIGHTING DESIGN AND/OR INSTALLATION (INCLUDING
<br />CONFLICTS WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ETC.) PRIOR TO PROCEEDING WITH
<br />THE WORK.
<br />10.FASCIAS OR ANY OTHER TRANSITION IN CEILING HEIGHT CREATED BY THE INSTALLATION AND/OR
<br />ALTERATION OF HVAC DUCTS, PIPING, OR OTHER EQUIPMENT SHALL BE CONSTRUCTED OF GYPSUM BOARD
<br />ON METAL FRAMING.
<br />11.ALL JOINTS IN THE CEILING TILE FIELD SHALL BE SQUARE, LEVEL, AND PERFECTLY ALIGNED WITH EACH OTHER
<br />AND WITH RECESSED LIGHT FIXTURES.
<br />12.THE GENERAL CONTRACTOR SHALL PROVIDE CUTOUTS AND OTHER SPECIAL PROVISIONS IN ACOUSTICAL
<br />CEILING TILE AS REQUIRED FOR LIGHT FIXTURES, REGISTERS, DIFFUSERS AND OTHER INSERTED ITEMS.
<br />13.THE GENERAL CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY DAMAGED CEILING TILES WHICH ARE
<br />REMOVED TO FACILITATE PLENUM SYSTEMS INSTALLATIONS.
<br />14.PRIOR TO CLOSING CEILINGS, PLENUM SYSTEMS (HVAC, PLUMBING, ELECTRICAL, ETC.) SHALL BE INSPECTED
<br />AND TESTED AS REQUIRED BY CONTRACTOR'S ENGINEER AND BY AUTHORITIES HAVING JURISDICTION TO
<br />ENSURE PROPER INSTALLATION AND FUNCTION.
<br />15.THE GENERAL CONTRACTOR SHALL NOT BE REQUIRED TO OPEN ANY CEILINGS FOR TELEPHONE, SECURITY,
<br />OR COMPUTER DATA SYSTEMS INSTALLATION, REPAIR, OR RECONFIGURATION AFTER CEILINGS ARE CLOSED.
<br />IF SUCH WORK IS REQUIRED, THE EXPENSE TO REOPEN CEILINGS SHALL BE BORNE BY THE PARTY
<br />RESPONSIBLE.
<br />16.THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL NEW LIGHT FIXTURES (COMPLETE WITH LAMPS) OF
<br />TYPES AND MANUFACTURERS SPECIFIED.
<br />17.WHEN NOTED ON THE DRAWINGS TO REMOVE & RELOCATE EXISTING LIGHT FIXTURES, THEY SHALL BE
<br />REFURBISHED, CLEANED, AND RELAMPED AS REQUIRED.
<br />18.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD SUPERVISION OF ALL MECHANICAL WORK
<br />DURING INSTALLATION AND SHALL INSPECT ALL SYSTEMS FOR OPERATION AND CODE COMPLIANCE AT
<br />COMPLETION OF THE JOB.
<br />19.LOCATE NEW DIFFUSERS TO ALIGN WITH NEW FIXTURE PATTERNS. COORDINATE DIFFUSER INSTALLATION TO
<br />AVOID CONFLICT WITH WORK OF OTHER TRADES IN PLENUM.
<br />20.WHEN NOTED FOR EXISTING DIFFUSERS TO BE REMOVED & RELOCATED, THEY SHALL BE CLEANED AND
<br />REFURBISHED AS REQUIRED. COORDINATE DIFFUSER INSTALLATION TO AVOID CONFLICT WITH WORK OF
<br />OTHER TRADES IN PLENUM.
<br />21.LOCATE HVAC GRILLES TO MINIMIZE SOUND TRAVEL FROM AREA TO AREA. NOTIFY MAD OF ANY
<br />ANTICIPATED ACOUSTICAL PROBLEMS BEFORE START OF WORK.
<br />22.ALLOWANCE SHALL BE MADE FOR LATERAL MOVEMENT OF THE SYSTEM. MAIN RUNNERS AND CROSS
<br />RUNNERS SHALL BE ATTACHED AT TWO ADJACENT WALLS WITH CLEARANCE BETWEEN THE WALL AND THE
<br />RUNNERS MAINTAINED AT THE OTHER TWO WALLS. REFER TO DETAILS ON SHEET ID5.2.
<br />23.INSTALL SUPPORT WIRES AND CROSS RUNNERS TO AVOID CONTACT WITH HVAC EQUIPMENT AND
<br />DUCTWORK.
<br />24.THE GENERAL CONTRACTOR SHALL COORDINATE FIRE/LIFE SAFETY PERMITS WITH THE BUILDING'S FIRE/LIFE
<br />SAFETY CONTRACTOR AND NOTIFY THE DESIGNER OF ANY DISCREPANCIES BETWEEN THE FIRE/LIFE SAFETY
<br />SYSTEM REQUIREMENTS AND THE PLANS.
<br />25.FIRE SPRINKLERS - PROVIDE COMPLETE SYSTEM INCLUDING, BUT NOT LIMITED TO, PIPING, VALVES, SPRINKLER
<br />DROPS, AND SPRINKLER HEADS. USE REFLECTED CEILING PLANS FOR LAYOUT GUIDELINES. ALL SPRINKLER
<br />HEADS SHALL BE FULLY RECESSED (FLUSH TO CEILING).
<br />26.RE-WORK, RELOCATE, RETROFIT AND/OR INSTALL NEW FIRE/LIFE SAFETY ANNUNCIATION DEVICES AS
<br />REQUIRED TO COMPLY WITH LOCAL GOVERNING CODES.
<br />27.EXTEND OR MODIFY EXISTING AUTOMATIC FIRE EXTINGUISHING SYSTEM AS NEEDED, TO BE APPROVED BY
<br />BUILDING AND SAFETY MECHANICAL PLAN CHECK PRIOR TO INSTALLATION.
<br />28.FURNISH AND INSTALL SMOKE DETECTORS PER ELECTRICAL ENGINEER'S DRAWINGS. LOCATION AND
<br />QUANTITY OF SMOKE DETECTORS WITHIN TENANT SPACE SHALL BE DETERMINED BY THE FIRE MARSHAL.
<br />29.WHERE CEILINGS ARE SPECIFIED TO BE OF FIRE-RATED CONSTRUCTION, ALL RECESSED LIGHT FIXTURES,
<br />SPEAKERS, ETC. SHALL BE BOXED OUT ABOVE THE CEILING WITH A FIRE-RATED ENCLOSURE EQUAL TO THAT
<br />OF THE CEILING.
<br />30.GENERAL CONTRACTOR SHALL COORDINATE WORK TO ACCOMMODATE VARIATIONS IN CEILING HEIGHTS
<br />AND EQUIPMENT INSTALLED THEREIN.
<br />31.THE GENERAL CONTRACTOR SHALL VERIFY THAT SPRINKLER AND HVAC PLACEMENT COMPLIES WITH ALL
<br />APPLICABLE LOCAL CODE REQUIREMENTS AND RE-WORK AS NECESSARY.
<br />32.ALL SUSPENDED GYP. BD CEILINGS SHALL RECEIVE SKIM COAT. PREP FOR FLAT PAINT FINISH WITHOUT ANY
<br />APPARENT SEAMS OR IMPERFECTIONS. UNLESS OTHERWISE NOTED, REFER TO REFLECTED CEILING PLAN AND
<br />FINISH PLANS PAINT SPEC, FINISH AND LOCATION.
<br />33.CEILING FIXTURES, TERMINALS, AND DEVICES:
<br />a.ALL LIGHT FIXTURES, AIR TERMINALS/GRILLS, OR OTHER DEVICES (REFERRED TO ALL BY COMMON TERM
<br />FIXTURES HEREAFTER) SHALL BE MOUNTED IN A MANNER THAT WILL NOT COMPROMISE CEILING
<br />PERFORMANCE.
<br />b.ALL FIXTURES SHALL BE SUPPORTED DIRECTLY BY MAIN RUNNERS OR BY SUPPLEMENTAL FRAMING WHICH IS
<br />SUPPORTED BY MAIN RUNNERS AND POSITIVELY ATTACHED WITH SCREWS OR OTHER APPROVED
<br />CONNECTORS.
<br />c.SURFACE MOUNTED FIXTURES SHALL BE ATTACHED TO A MAIN RUNNER WITH A POSITIVE CLAMPING DEVICE
<br />MADE OF MATERIAL WITH A MINIMUM OF 14 GAGE. ROTATIONAL SPRING CLAMPS DO NOT COMPLY.
<br />d.ACCESS PANELS: ACCESS TO THE SPACE BETWEEN THE CEILING AND THE FLOOR OR ROOF ABOVE SHALL
<br />NOT BE ALLOWED. SMALL ACCESS PANELS FOR THE INSPECTION, ADJUSTMENT, OR REPAIR OF UTILITY
<br />SWITCHES, VALVES, SENSORS, ETC MAY BE ALLOWED IF THE PANEL IS LESS THAN 300 SQUARE INCHES. SUCH
<br />PANELS SHALL ALSO HAVE PERMANENT WARNING LABEL AS FOLLOWS:
<br />WARNING: 1. DO NOT CLIMB, WALK, OR CRAWL ON THE GYPSUM BOARD CEILING.
<br />2. DO NOT STORE OR STOW ANYTHING ON THE GYPSUM BOARD CEILING.
<br />e.ALL LIGHT FIXTURES WEIGHING LESS THAN OR EQUAL TO 10 LB. SHALL HAVE ONE NO. 12 GAUGE SAFETY
<br />WIRE CONNECTED FROM FIXTURE HOUSING TO STRUCTURE ABOVE. IT IS NOT NECESSARY FOR THESE SAFETY
<br />WIRES TO BE TAUT.
<br />f.ALL FIXTURES WEIGHING GREATER THAN 10 LB. BUT LESS THAN OR EQUAL TO 56 LB. SHALL HAVE TWO NO. 12
<br />GAUGE SAFETY WIRE CONNECTED FROM FIXTURE HOUSING TO STRUCTURE ABOVE. IT IS NOT NECESSARY
<br />FOR THESE SAFETY WIRES TO BE TAUT.
<br />g.ALL FIXTURES WEIGHING GREATER THAN 56 LB. SHALL BE SUPPORTED DIRECTLY FROM STRUCTURE ABOVE BY
<br />APPROVED HANGERS.
<br />h.PENDANT-HUNG FIXTURES SHALL BE SUPPORTED DIRECTLY FROM STRUCTURE ABOVE USING NO LESS THAN
<br />NO. 9 GAUGE WIRE OR AN APPROVED ALTERNATE SUPPORT. THE CEILING SUSPENSION SYSTEM SHALL NOT
<br />PROVIDE ANY DIRECT SUPPORT.
<br />i.ALL RECESSED OR DROP-IN FIXTURES SHALL BE SUPPORTED DIRECTLY FROM FIXTURE HOUSING TO THE
<br />STRUCTURE ABOVE WITH A MINIMUM OF TWO NO. 12 GAUGE WIRES LOCATED AT DIAGONALLY OPPOSITE
<br />CORNERS. LEVELING OR POSITIONING OF FIXTURES MAY BE PROVIDED BY CEILING GRID. FIXTURE SUPPORT
<br />WIRES MAY BE SLIGHTLY LOOSE TO ALLOW THE FIXTURE TO SEAT IN THE GRID SYSTEM. FIXTURES SHALL NOT
<br />BE SUPPORTED FROM MAIN RUNNERS OR FURRING CHANNELS IF THE WEIGHT OF THE FIXTURES CAUSES
<br />TOTAL LOAD TO EXCEED THE DEFLECTION CAPABILITY OF THE CEILING SUSPENSION SYSTEM.
<br />j.PROVIDE A 2-INCH OVERSIZED RING, ADAPTER OR SLEEVE ON SPRINKLER AND SIMILAR PENETRATIONS TO
<br />ALLOW FOR A 1-INCH HORIZONTAL DISPLACEMENT IN ANY DIRECTION.
<br />34.ANY WALL MOUNTED FIXTURES SHALL BE MOUNTED SO AS NOT TO PROTRUDE BEYOND 4" FROM THE FACE
<br />OF THE WALL IF MOUNTED AT HEIGHT OF LESS THAN 6'-8" A.F.F.
<br />35.GENERAL CONTRACTOR SHALL FURNISH MAD WITH PLANS SHOWING LOCATIONS OF ALL LIGHT SENSORS,
<br />EMERGENCY LIGHT STROBES, SMOKE DETECTORS, LIFE SAFETY PUBLIC ANNOUNCEMENT SPEAKERS AND
<br />THERMOSTATS FOR REVIEW PRIOR TO ORDERING AND INSTALLATION.
<br />36.CUT SHEETS AND/OR SHOP DRAWINGS OF ALL REGISTERS AND ACCESS PANELS (AS REQUIRED) SHALL BE
<br />SUBMITTED TO MAD FOR REVIEW PRIOR TO FABRICATION, INSTALLATION, OR RELOCATION.
<br />37.CONTRACTOR SHALL SUBMIT MECHANICAL AND SPRINKLER DRAWINGS TO MAD FOR APPROVAL OF
<br />LOCATION OF SPRINKLER HEADS AND HVAC GRILLES.
<br />38.THE GENERAL CONTRACTOR SHALL SUBMIT ONE (1) ELECTRONIC (PDF PREFERRED) SUBMITTAL OF SPECIFIED
<br />LIGHT FIXTURES AND EQUIPMENT. IN ADDITION, TWO (2) FULL WORKING SAMPLES OF SPECIFIED LIGHT
<br />FIXTURES SHALL BE SUBMITTED, IF REQUESTED BY MAD.
<br />GENERAL FLOOR FINISH NOTES
<br />1.ALL INTERIOR FINISHES SHALL CONFORM WITH CURRENT CBC CHAPTER 8 AND ARE TO COMPLY WITH CLASS
<br />III FLAME-SPREAD REQUIREMENTS.
<br />2.FLOORING SHALL MEET ALL CURRENT NON-SLIP STANDARDS AND REQUIREMENTS SPECIFIED BY APPLICABLE
<br />CODES AND/OR AUTHORITIES. CONTRACTOR SHALL PROVIDE NON-SLIP COATINGS AS NECESSARY TO MEET
<br />THESE REQUIREMENTS.
<br />3.ALL MATERIALS AND INSTALLATIONS OF THE SAME SHALL COMPLY WITH ALL APPLICABLE LOCAL BUILDING,
<br />FIRE AND ADA MUNICIPAL CODES.
<br />4.ALL NEW FINISH FLOOR SHALL BE INSTALLED BY CONTRACTOR AS SPECIFIED ON FINISH PLANS.
<br />5.ALL WORKMANSHIP SHALL BE OF THE BEST QUALITY. WHEN THE WORK IS COMPLETE, IT SHALL BE FREE FROM
<br />BUCKLES, BUBBLES, OPEN JOINTS, OR OTHER IMPERFECTIONS. SEAMS SHALL BE KEPT IN ACCURATE
<br />ALIGNMENT ALONG BOTH COORDINATES. TILES HAVING CHIPPED OR ROUNDED CORNERS WILL BE
<br />REJECTED AND IF INSTALLED, SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE TILES AT CONTRACTOR'S
<br />EXPENSE.
<br />6.THE GENERAL CONTRACTOR SHALL FLASH ALL CRACKS, HOLES, OR OTHER IMPERFECTIONS (PROJECTIONS
<br />SHALL BE REMOVED AND PATCHED) TO PROVIDE A CONTINUOUSLY SMOOTH FLOOR SURFACE WITH
<br />VARIATION IN LEVEL NOT TO EXCEED 1/4" IN 10'-0" NON-CUMULATIVE.
<br />7.THE GENERAL CONTRACTOR SHALL NOTIFY MAD AFTER FLOOR PATCHING IS COMPLETE FOR FIELD
<br />INSPECTION PRIOR TO THE INSTALLATION OF FINISH FLOOR.
<br />8.GENERAL CONTRACTOR SHALL COORDINATE WORK OF ALL FLOORING CONTRACTORS TO ENSURE THAT
<br />ALL VARYING FLOOR MATERIALS USED ARE INSTALLED FLUSH. ALL TRANSITION METHODS SHALL BE APPROVED
<br />BY MAD PRIOR TO INSTALLATION.
<br />9.GENERAL CONTRACTOR SHALL FOLLOW ALL MANUFACTURERS RECOMMENDATIONS AND INSTRUCTIONS
<br />FOR THE INSTALLATION OF ANY FINISHES OR PRODUCTS.
<br />10.TILES SHALL BE LAID IN SQUARE PATTERN WITH COURSES PARALLEL TO WALLS, U.O.N. ON THE DRAWINGS.
<br />TILES SHALL BE SECURELY CEMENTED AND SHALL BE LAID WITH TIGHT JOINTS. THE ADHESIVE USED FOR
<br />CEMENTING THE TILES SHALL BE APPLIED FAR ENOUGH IN ADVANCE OF SETTING TO PERMIT THE ADHESIVE
<br />TO REACH ITS INITIAL SET, BUT NOT ITS FINAL SET. ADHESIVES USED ARE TO BE NON-COMBUSTIBLE.
<br />11.AREAS WHERE FLOOR FINISH IS SCHEDULED SHALL BE CLOSED TO TRAFFIC AND OTHER WORK DURING
<br />INSTALLATION OF FINISH FLOOR.
<br />12.UPON COMPLETION, ALL FLOOR FINISH WORK SHALL BE CLEANED BY THE CONTRACTOR, REMOVING ALL
<br />SPOTS OF ADHESIVE, SURFACE STAINS, AND ALL SCRAPS. CARTONS AND CONTAINERS SHALL BE REMOVED
<br />FROM THE BUILDING.
<br />13.AFTER CLEANING, THE CONTRACTOR SHALL PROVIDE (2) APPLICATIONS OF AN APPROVED NON-SLIP WAX TO
<br />RESILIENT TILE FLOOR, WHICH SHALL BE THOROUGHLY MACHINE-BUFFED AND LEFT IN CONDITION ENTIRELY
<br />ACCEPTABLE TO MAD.
<br />14.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE PROTECTION FOR ALL FLOORING WORK FOR
<br />THE DURATION OF THE CONTRACT. ALL PROTECTION SHALL BE REMOVED PRIOR TO PUNCH LIST.
<br />15.ACCURATE, DIMENSIONED FLOORING PLANS SHALL BE SUBMITTED TO MAD FOR APPROVAL PRIOR TO
<br />INSTALLATION. ELECTRONIC FILE (PDF PREFERRED) SUBMITTAL IS ACCEPTABLE.
<br />16.GENERAL CONTRACTOR SHALL FOLLOW ALL MANUFACTURERS RECOMMENDATIONS AND INSTRUCTIONS
<br />FOR THE INSTALLATION OF ALL FINISHES OR PRODUCTS.
<br />17.GENERAL CONTRACTOR SHALL SUBMIT AN ELECTRONIC FILE (PDF PREFERRED) OF CARPET SEAMING DIAGRAM
<br />INCLUDING DIRECTION OF CARPET TO MAD FOR APPROVAL PRIOR TO ORDERING AND PRIOR TO
<br />INSTALLATION OF MATERIALS.
<br />18.PLASTIC LAMINATE BASE SHALL BE PROVIDED ON ALL MILLWORK SCHEDULED TO RECEIVE PLASTIC LAMINATE
<br />FINISH (SEE ELEVATIONS).
<br />19.GENERAL CONTRACTOR SHALL SUBMIT (3) 8" X 8" SAMPLES OF ALL FINISHES TO MAD FOR APPROVAL, PRIOR
<br />TO PURCHASE OR INSTALLATION.
<br />20.NO SUBSTITUTIONS OF FINISHES SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL FROM MAD.
<br />GENERAL MILLWORK NOTES
<br />1.REFER TO SHEET ID3.0 FOR EQUIPMENT, FIXTURE, AND MILLWORK HARDWARE/ACCESORY SCHEDULES FOR
<br />CONTRACTOR SUPPLIED EQUIPMENT, FIXTURE, AND HARDWARE/ACCESSORIES.
<br />2.ALL PLASTIC LAMINATE MILLWORK TO BE FABRICATED, ASSEMBLED, FINISHED AND ERECTED TO AWI CUSTOM
<br />GRADE STANDARDS. ALL EXPOSED AND SEMI-EXPOSED SURFACES TO BE FINISHED WITH SCHEDULED PLASTIC
<br />LAMINATE. MILLWORK TO BE 5/8" MELAMINE. MILLWORK FINISH, U.O.N.: BLACK AT COLOR PLASTIC
<br />LAMINATE MILLWORK. WHITE AT WHITE OR LIGHT COLORED PLASTIC LAMINATE MILLWORK.
<br />3.ALL VENEERED OR LACQUERED MILLWORK SHALL BE FABRICATED, ASSEMBLED, FINISHED AND ERECTED TO
<br />AWI PREMIUM GRADE STANDARDS. ALL EXPOSED SURFACES INCLUDING DOORS, DRAWERS, FRONTS,
<br />COUNTERTOPS AND BASE SHALL BE VENEERED. UNLESS OTHERWISE NOTED, MILLWORK SHALL BE FULLY
<br />VENEERED.
<br />4.THE GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE.
<br />ALL INSTALLED MILLWORK SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES.
<br />5.GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING FIELD DIMENSIONS IN ALL AREAS SCHEDULED
<br />TO RECEIVE CABINETS NOTED HEREIN.
<br />6.ALL INSTALLED MILLWORK SHALL BE SCRIBED TO WALL OR CEILING. CONTRACTOR SHALL COORDINATE
<br />MILLWORK INSTALLATION WITH THE WORK OF ALL TRADES WHICH HAVE AN IMPACT ON MILLWORK.
<br />7.PROVIDE BRACING IN WALLS AS REQUIRED FOR OVERHEAD CABINETS. WHERE OPEN SHELVING IS INDICATED
<br />PROVIDE ALL EXPOSED EDGE SURFACES WITH PLASTIC LAMINATE FINISHES AND INTERIOR SURFACE WITH
<br />WHITE KORTRON OR MELAMINE.
<br />8.GENERAL CONTRACTOR SHALL ENSURE THAT MILLWORK CONTRACTOR SHALL BE RESPONSIBLE FOR ALL JOB
<br />SITE CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO MAD PRIOR TO FABRICATION OF CABINET
<br />WORK.
<br />9.ALL MILLWORK IS TO BE FABRICATED IN A CONTROLLED SHOP ENVIRONMENT. FIELD WORK SHALL BE LIMITED
<br />TO BLOCKING, TRIMMING, AND ASSEMBLED FINISHED COMPONENTS.
<br />10.ALL MILLWORK JOINERY SHALL BE FABRICATED AND SECURED IN A MANNER WHICH ENSURES THAT THE JOINT
<br />WILL NOT SEPARATE.
<br />11.ALL CUTOUTS IN PLASTIC LAMINATE COUNTER TOPS (SINKS, GROMMET CHASES, ETC.) SHALL BE MADE BY
<br />CABINET SUBCONTRACTOR AT SITE.
<br />12.ALL WOOD VENEER PIECES SHALL BE FINISHED IN THE SHOP WITH SPRAY EQUIPMENT. NO FINISHING OTHER
<br />THAN TOUCHUP TO BE DONE AT JOB SITE.
<br />13.ALL REVEALS SHALL BE 1/8" U.O.N. AND BE ADJACENT WOOD FINISH OR ADJACENT PLASTIC LAMINATE WHERE
<br />SPECIFIED. REFER TO ELEVATIONS.
<br />14.GENERAL CONTRACTOR SHALL COORDINATE APPROPRIATE MUD RINGS FOR OUTLETS LOCATED ON FULL
<br />HEIGHT BACKSPLASH.
<br />15.GENERAL CONTRACTOR SHALL SUPPLY AND INSTALL ALL NECESSARY HARDWARE AS REQUIRED BY THE
<br />SPECIFICATIONS OR INTENT OF THE DESIGNER. SUBMITTALS OF MILLWORK HARDWARE SHALL BE SUBMITTED
<br />TO MAD FOR APPROVAL BEFORE ASSEMBLY.
<br />16.CABINET HARDWARE - SEE MILLWORK HARDWARE/ACCESSORY SCHEDULE SHEET ID3.0 (U.O.N.):
<br />a.ALL HINGES AT ALL MILLWORK SHALL BE FULLY CONCEALED.
<br />b.ALL DRAWER GLIDES SHALL BE FULL EXTENSION EXTRA HEAVY DUTY; GLIDES TO BE BLACK AT BLACK
<br />CASEWORK; SILVER OR WHITE AT WHITE CASEWORK.
<br />c.ALL GROMMETS SHALL BE DOUG MOCKETT "THE MAX" SATIN ALUMINUM FINISH OR APPROVED EQUAL. ALL
<br />GROMMET LOCATIONS TO BE FIELD VERIFIED BY ARCHITECT PRIOR TO INSTALLATION.
<br />d.PEDESTAL CABINETS TO ACCOMMODATE PENDEFLAX LETTER AND/OR LEGAL FOLDERS. PROVIDE METAL
<br />BRACES.
<br />e.WASTE RECEPTACLE DRAWERS SHALL HAVE TWO (2) SETS OF HEAVY DUTY GLIDES.
<br />17.ALL MILLWORK FINISHES SHALL BE AS SPECIFIED ON PLANS, SCHEDULES, ELEVATIONS AND/OR DETAILS,
<br />U.O.N.
<br />18.GENERAL CONTRACTOR TO SUBMIT AN ELECTRONIC FILE (PDF PREFERRED) MILLWORK SHOP DRAWINGS FOR
<br />APPROVAL BEFORE FABRICATION AND INSTALLATION. CONFIRM FINISHES ON SHOP DRAWINGS FOR MAD'S
<br />APPROVAL BEFORE FABRICATION. SUBMIT (4) 12"x12" SAMPLES OF EACH FINISH FOR APPROVAL.
<br />19.ALL SPECIAL MILLWORK PRODUCTS AND SPECIAL ASSEMBLIES ARE SUBJECT TO SUBMITTAL AND REVIEW. SHOP
<br />DRAWINGS AND SUBMITTALS SHALL NOT BE WAIVED UNLESS WRITTEN PERMISSION TO DO SO IS GIVEN BY
<br />MAD.
<br />20.MILLWORK SHOP DRAWINGS SHALL CALL OUT ALL MATERIALS AND FINISHES. ALL JOINTS, CORNERS, AND
<br />EDGES SHALL BE DESCRIBED IN DETAIL DRAWINGS. ALL DIMENSIONS, CRITICAL OR OTHERWISE, SHALL BE
<br />CALLED OUT ON THE SHOP DRAWINGS. MAD WILL NOT REVIEW SHOP DRAWINGS WHICH ARE INCOMPLETE
<br />AND/OR WHICH SHOW MINIMAL DETAIL.
<br />GENERAL WALL FINISH NOTES
<br />1.ALL INTERIOR FINISHES SHALL CONFORM WITH CURRENT CBC CHAPTER 8.
<br />2.ALL AREAS ARE TO BE PAINTED IN ACCORDANCE WITH FINISH PLANS UNLESS OTHERWISE NOTED OR
<br />SPECIFIED.
<br />3.PAINT COLORS AND ALL OTHER WALL FINISHES INCLUDING WALL COVERING SHALL BE AS SPECIFIED BY MAD.
<br />4.THE GENERAL CONTRACTOR SHALL USE SPECIFIED PAINT PRODUCTS. IF SUBSTITUTION OF MANUFACTURER
<br />IS REQUESTED, THE CONTRACTOR SHALL PROVIDE MANUFACTURER'S LITERATURE, INCLUDING FULL
<br />APPLICATION SPECIFICATIONS, TO MAD FOR APPROVAL IN ADVANCE OF APPLICATION.
<br />5.WALLS SHALL BE DEFINED AS SURFACES FROM FLOOR TO CEILING, INCLUDING PILASTERS, FASCIAS, JAMBS,
<br />BUCKS, REVEALS, RETURNS, AND ALL VERTICAL SURFACES NOT INCLUDED IN CEILING.
<br />6.INDICATIONS OF EXTENT OF WALL FINISH ARE GRAPHICALLY SYMBOLIC AND DO NOT REPRESENT EVERY
<br />JOG, PROTRUSION, OR RECESS OCCURRING ON THE ACTUAL CONSTRUCTED SURFACE (NEW OR EXISTING).
<br />THE CONTRACTOR SHALL PROVIDE SPECIFIED FINISH ON ALL SURFACES WITHIN THE LIMITS SHOWN ON THE
<br />PLANS.
<br />7.THE CONTRACTOR SHALL INSPECT ALL SURFACES FOR HOLES, CRACKS, AND ANY OTHER CONDITIONS
<br />WHICH WOULD ADVERSELY IMPACT PAINT APPLICATION. ALL EXISTING LOOSE PAINT SHALL BE REMOVED.
<br />ALL SURFACES SHALL BE PROPERLY PREPARED, PATCHED AS APPROPRIATE TO A SMOOTH CONDITION, AND
<br />MADE READY FOR PRIME AND PAINT. THE CONTRACTOR SHALL NOT PROCEED WITH THE PAINTING WORK
<br />UNTIL THIS HAS OCCURRED AT ALL SURFACES SCHEDULED TO RECEIVE PAINT.
<br />8.COMMENCEMENT OF PAINTING WORK SHALL REPRESENT ACCEPTANCE OF SURFACE CONDITIONS.
<br />9.THE GENERAL CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ALL ELECTRICAL SWITCH AND OUTLET
<br />PLATES, SURFACE HARDWARE, ETC. PRIOR TO PAINTING AND REPLACE THEM WHEN PAINTING WORK IS
<br />COMPLETE. ALL PAINT SPILLED, SPLASHED, OR SPLATTERED ON DIFFUSERS, REGISTERS, SLAB FITTINGS, ETC.
<br />SHALL BE REMOVED WHEN PAINTING WORK IS COMPLETE. THE CONTRACTOR SHALL REPLACE ANY ITEMS
<br />DAMAGED DURING THIS PROCESS WITH NEW ITEM TO MATCH EXISTING.
<br />10.ALL WOOD SHELVING AND PAINTED DOORS SHALL RECEIVE PRIMING, SANDING, AND (2) FULL COATS OF
<br />SEMI-GLOSS ENAMEL FREE OF BRUSH MARKS. THE CONTRACTOR SHALL EXAMINE ALL AREAS OF
<br />CONSTRUCTION AFTER COMPLETION OF ALL WORK AND PERFORM NECESSARY "TOUCH-UP" PAINTING
<br />AND/OR PATCHING.
<br />11.THE GENERAL CONTRACTOR SHALL INSTALL WALL COVERING PER MANUFACTURER'S SPECIFICATIONS WHERE
<br />INDICATED ON FINISH PLANS. WALL COVERING SHALL BE INSTALLED SMOOTH, WITHOUT WRINKLES,
<br />BUBBLES OR LOOSE EDGES. ALL PASTE AND BRUSH MARKS SHALL BE REMOVED. WALL COVERING
<br />ADJOINING WOOD AND METAL TRIM SHALL BE CUT STRAIGHT AND SQUARE. WALL COVERING AT ALL
<br />REVEALS SHALL RETURN INTO REVEAL. ALL WORKMANSHIP WHICH IS NOT JUDGED TO BE FIRST QUALITY BY
<br />MAD WILL NOT BE ACCEPTED.
<br />13.REPAIR, PATCH (IF REQUIRED) EXISTING WALLS AND RE PAINT AS SPECIFIED.
<br />14.SOFFIT AND FASCIA FINISH SHALL MATCH ADJACENT WALL COLOR, U.O.N.
<br />15.SEE REFLECTED CEILING PLAN FOR CEILING FINISHES & LOCATION.
<br />16.ALL ACCESS DOORS AND PANELS LOCATED IN DRYWALL CEILINGS AND WALL SHALL BE PAINTED TO MATCH
<br />ADJACENT SURFACE COLOR AND FINISH, U.O.N.
<br />17.GENERAL CONTRACTOR SHALL COORDINATE ALL FINISHES ON MILLWORK AS SHOWN ON MILLWORK PLANS
<br />WITH THE MILLWORK SUB-CONTRACTOR.
<br />GREEN BUILDING NOTES
<br />1.INTERIOR AND EXTERIOR LIGHTING SHALL BE INSTALLED SUCH THAT ZERO DIRECT-BEAM ILLUMINATION
<br />LEAVES THE BUILDING SITE.
<br />2.ALL NEW EXTERIOR LUMINAIRES SHALL BE SHIELDED OR BE CUTOFF LUMINAIRES AS DEFINED IN SECTION 132
<br />(b) OF THE CALIFORNIA ENERGY CODE.
<br />3.NEW NON-RESIDENTIAL GRADE EQUIPMENT AND APPLIANCES PROVIDED AND INSTALLED SHALL BE ENERGY
<br />STAR LABELED IF ENERGY STAR IS APPLICABLE TO THAT EQUIPMENT OR APPLIANCE.
<br />4.NONABSORBENT FLOOR AND WALL FINISH SHALL BE USED WITHIN AT LEAST TWO FEET AND PERPENDICULAR
<br />TO EXTERIOR ENTRIES AND/OR OPENING SUBJECT TO FOOT TRAFFIC.
<br />5.WHEN PROJECT OCCURS WITHIN THE LOS ANGELES CITY LIMITS, ONLY A CITY OF LOS ANGELES CERTIFIED
<br />HAULER WILL BE USED FOR HAULING OF CONSTRUCTION WASTE.
<br />6."AN OPERATION AND SYSTEMS MANUAL" SHALL BE PROVIDED TO THE FIELD INSPECTOR AT THE TIME OF
<br />FINAL INSPECTION.
<br />7.ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE,
<br />PLASTIC, OR SHEETMETAL UNTIL THE FINAL STARTUP OF THE HEATING AND COOLING EQUIPMENT.
<br />8.THE VOC CONTENT VERIFICATION CHECKLIST, FORM GRN 2, SHALL BE COMPLETED AND VERIFIED PRIOR TO
<br />FINAL INSPECTION APPROVAL. THE MANUFACTURER'S SPECIFICATIONS SHOWING VOC CONTENT FOR ALL
<br />APPLICABLE PRODUCTS SHALL BE READILY AVAILABLE AT THE JOB SITE AND BE PROVIDED TO THE FIELD
<br />INSPECTOR FOR VERIFICATION.
<br />9.ALL NEW CARPET INSTALLED IN THE BUILDING INTERIOR SHALL MEET THE TESTING AND PRODUCT
<br />REQUIREMENTS OF ONE OF THE FOLLOWING:
<br />a.CARPET AND RUG INSTITUTE'S GREEN LABEL PLUS PROGRAM;
<br />b.CALIFORNIA DEPARTMENT OF PUBLIC HEALTH STANDARD PRACTICE FOR TESTING OF (VOLATILE
<br />ORGANIC COMPOUNDS) VOCs (SPECIFICATION 01350);
<br />c.NSF/ANSI 140 AT THE GOLD LEVEL; OR
<br />d.SCIENTIFIC CERTIFICATIONS SYSTEMS INDOOR ADVANTAGE GOLD
<br />10.ALL NEW CARPET CUSHION INSTALLED IN THE BUILDING INTERIOR SHALL MEET REQUIREMENTS OF THE
<br />CARPET AND RUG INSTITUTE GREEN LABEL PROGRAM.
<br />11.THE FORMALDEHYDE EMISSIONS VERIFICATION CHECKLIST, FORM GRN 3, SHALL BE COMPLETED PRIOR TO
<br />FINAL INSPECTION APPROVAL. THE MANUFACTURER'S SPECIFICATIONS SHOWING FORMALDEHYDE CONTENT
<br />FOR ALL APPLICABLE WOOD PRODUCTS SHALL BE READILY AVAILABLE AT THE JOB SITE AND BE PROVIDED TO
<br />THE FIELD INSPECTOR FOR VERIFICATION.
<br />12.50% OF THE TOTAL AREA RECEIVING RESILIENT FLOORING SHALL COMPLY WITH THE VOC LIMITS OR BE
<br />CERTIFIED UNDER THE RESILIENT FLOOR COVERING INSTITUTE (RFCI) FLOORSCORE PROGRAM.
<br />13.AN AIR FILTER WITH A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8 OR HIGHER SHALL BE INSTALLED
<br />IN NEW MECHANICAL SYSTEMS FOR OUTSIDE AND RETURN AIR PRIOR TO OCCUPANCY.
<br />14.THE HVAC, REFRIGERATION, FIRE SUPPRESSION EQUIPMENT SHALL NOT CONTAIN CFC OR HALONS.
<br />15.ARCHITECTURAL PAINTS AND COATINGS, ADHESIVES, CAULKS AND SEALANTS SHALL COMPLY WITH THE
<br />VOLATILE ORGANIC COMPOUND (VOC) LIMITS LISTED IN TABLES 10.504.4.1 - 10.504.4.3.
<br />16.AEROSOL PAINTS AND COATINGS SHALL MEET THE PRODUCT-WEIGHTED MIR LIMITS FOR ROC IN SECTION
<br />94522(A)(3) AND OTHER REQUIREMENTS, INCLUDING PROHIBITIONS ON USE OF CERTAIN TOXIC
<br />COMPOUNDS AND OZONE DEPLETING SUBSTANCES, IN SECTIONS 94522(C)(2) AND (D)(2) OF CALIFORNIA
<br />CODE OF REGULATIONS, TITLE 17, COMMENCING WITH SECTION 94520; AND IN AREAS UNDER THE
<br />JURISDICTION OF THE SOUTH COAST AREA AIR QUALITY MANAGEMENT DISTRICT ADDITIONALLY COMPLY
<br />WITH THE PERCENT VOC BY WEIGHT OF PRODUCT LIMITS OF REGULATION 8, RULE 49
<br />17.ALL SEALERS, STAINS, AND FINISHES ON CONCRETE, WOOD, BAMBOO, OR CORK MUST COMPLY WITH THE
<br />SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQD) RULE 113, ARCHITECTURAL COATINGS.
<br />GENERAL CONTRACTOR SHALL SUBMIT ALL SEALERS, STAINS, AND FINISHES BEING USED ON THE PROJECT TO
<br />WDG FOR APPROVAL PRIOR TO INSTALLATION.
<br />18.NEW PLUMBING FIXTURES AND FITTINGS SHALL NOT EXCEED THE MAXIMUM ALLOWABLE FLOW RATE
<br />SPECIFIED IN TABLE 10.303.2.3.
<br />19.A FINAL REPORT FOR THE TESTING AND ADJUSTING OF ALL NEW SYSTEMS SHALL BE COMPLETED AND
<br />PROVIDED TO THE FIELD INSPECTOR PRIOR TO FINAL INSPECTION. THIS REPORT SHALL BE SIGNED BY THE
<br />INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE SERVICES.
<br />20.NEW HARDWOOD PLYWOOD, PARTICLE BOARD, AND MEDIUM DENSITY FIBERBOARD COMPOSITE WOOD
<br />PRODUCTS USED IN THE INTERIOR OR EXTERIOR OF THE BUILDING SHALL MEET THE FORMALDEHYDE LIMITS
<br />LISTED IN TABLE 10.504.4.5.
<br />21.THE BUILDING SHALL MEET OR EXCEED THE PROVISIONS FOR MECHANICAL VENTILATION OF SECTION 1203
<br />OR THE LOS ANGELES BUILDING CODE.
<br />22.BUILDINGS THAT USE DEMAND CONTROL VENTILATION SHALL HAVE CO₂ SENSORS AND VENTILATION
<br />CONTROLS INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE CURRENT EDITION OF THE
<br />CALIFORNIA ENERGY CODE, CCR, TITLE 24, PART 6, SECTION 121(c).
<br />23.IF THE NEW HVAC SYSTEM IS USED DURING CONSTRUCTION, USE RETURN AIR FILTERS WITH A
<br />MERV OF 8. REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPPANCY.
<br />24.TESTING AND ADJUSTMENT IS REQUIRED FOR ALL NEW INSTALLATION OF ANY OF THE FOLLOWING SYSTEMS:
<br />a. HEATING VENTILATING AND AIR CONDITIONING SYSTEM
<br />i. DESCRIBE THE HVAC SYSTEMS AND CONTROLS.
<br />ii. PLANS SHALL INDICATE THAT THE HVAC SYSTEM AND COMPONENTS WILL BE TESTED, ADJUSTED
<br />AND BALANCED IN ACCORDANCE WITH ONE OF THE FOLLOWING:
<br />·TABB'S CONSTRUCTION SPECIFICATION INSTITUTE MASTERFORMAT
<br />·NEBB'S STANDARDS FOR TESTING, ADJUSTMENT AND BALANCING OF ENVIRONMENTAL SYSTEMS
<br />(7TH EDITION)
<br />·AABC'S NATIONAL STANDARDS FOR TOTAL SYSTEM BALANCE (6TH EDITION)
<br />·ASHRAE'S STANDARD 111-2008
<br />b. INDOOR AND OUTDOOR LIGHTING AND CONTROLS:
<br />i. DESCRIBE THE TYPES OF LIGHTING FIXTURES USED AND THEIR CORRESPONDING CONTROLS AT
<br />VARIOUS SPACES/ROOMS WITHING THE BUILDING (E.G. DIMMERS, OCCUPANCY SENSORS,
<br />PROGRAMMABLE TIME SWITCHES, PHOTOSENSORS, ETC.)
<br />ii. PROVIDE A NARRATIVE OF THE TESTING AND ADJUSTMENT PROCEDURE FOR THE LIGHTING
<br />CONTROLS.
<br />Sheet Title:
<br />ISSUE DATE
<br />ISSUE FOR PLANCHECK 12.22.2025
<br />All drawings and written material appearing herein constitute the original and
<br />unpublished work of MAD Studio and the same may not be duplicated, used
<br />or disclosed without the written consent of MAD Studio.
<br />Sheet No.:
<br />ISSUE DESCRIPTION
<br />ENGINEER/CONSULTANT
<br />ARCHITECT/ENGINEER STAMP
<br />30
<br />5
<br />
<br />W
<br />
<br />4
<br />T
<br />H
<br />
<br />S
<br />T
<br />R
<br />E
<br />E
<br />T
<br />,
<br />
<br />S
<br />A
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />1
<br />CA
<br />F
<br />E
<br />OA
<br />S
<br />I
<br />S
<br />CLIENT
<br />www.madstudiola.com
<br />CITY STAMP
<br />Project Director:
<br />Project Designer:
<br />Project Tech:
<br />Project No:25030.300E.M.
<br />E.M.
<br />S.P.
<br />ISSUED FOR MEP 01.13.2026
<br />ISSUED FOR PLAN CHECK COMMENTS- PLANNING DEPT.01.22.2026
<br />ISSUED FOR PRICING 02.17.2026
<br />ISSUED FOR PLAN CHECK COMMENTS - PLANNING DEPT.02.20.2026
<br />ISSUED FOR COUNTY REVIEW 03.24.2026
<br />ISSUED FOR ADDENDUM A 03.27.2026
<br />ISSUED FOR BUILDING DEPT REVIEW 04.08.2026
<br />ISSUED FOR BUILDING DEPT REVIEW - RESUBMITTAL 05.05.2026
<br />ISSUED FOR BUILDING DEPT CORRECTIONS 05.20.2026
<br />ID0.2
<br />GENERAL NOTES
|