Laserfiche WebLink
GENERAL REFLECTED CEILING PLAN NOTES <br />1.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL LIGHT FIXTURES AND ELECTRICAL WORK AS SHOWN OR <br />IMPLIED IN DRAWINGS AND NOTES. <br />2.THE MECHANICAL AND ELECTRICAL DRAWINGS ARE SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. IT <br />IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK DRAWINGS FOR COORDINATION PRIOR TO BIDDING AND <br />AGAIN PRIOR TO INSTALLATION OF MECHANICAL AND ELECTRICAL WORK. ANY DISCREPANCY BETWEEN THE <br />DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF MAD FOR CLARIFICATION. WORK INSTALLED IN <br />CONFLICT WITH MAD'S DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT THE CONTRACTOR'S <br />EXPENSE AND SHALL NOT IMPACT THE SCHEDULE. <br />3.CEILING HEIGHTS AND DETAILING SHALL BE AS INDICATED IN DRAWINGS. ANY DEVIATION FROM HEIGHT OR <br />DETAILING INDICATED SHALL BE SUBMITTED TO MAD FOR REVIEW PRIOR TO BIDDING. <br />4.REFER TO PLAN FOR ALL CEILING HEIGHTS. GENERAL CONTRACTOR SHALL VERIFY CLEARANCES BETWEEN <br />DUCTWORK, LIGHT FIXTURES, AND OTHER OBSTRUCTIONS IN THE CEILING PLENUM TO ASSURE THE FINISH <br />CEILING HEIGHT. <br />5.FOR DETAILS AND SPECIFICATIONS OF LIGHTING FIXTURES, SWITCHES, PANEL BOXES, DIMMER CONTROLS, <br />CIRCUITING, AIR CIRCUITING, AIR CONDITIONING, DUCTWORK AIR SUPPLY DIFFUSERS, AIR RETURN GRILLES, <br />JUMP DUCT, THERMOSTATS, SMOKE DETECTORS, ETC., SEE ELECTRICAL AND MECHANICAL DRAWINGS. <br />6.THE CEILING WORK SHALL BE CLOSELY COORDINATED WITH THAT OF OTHER TRADES WHEREVER IT IS <br />CONTIGUOUS. <br />7.GENERAL CONTRACTOR SHALL ENSURE COMPLIANCE WITH CURRENT TITLE 24. <br />8.GENERAL CONTRACTOR TO RE-CIRCUIT/RE-SWITCH ALL LIGHTING AS REQUIRED TO COMPLY WITH NEW <br />DESIGN AND LOCAL CODES. SWITCHING OF ALL OFFICES/ENCLOSED ROOMS SHALL COMPLY WITH TITLE 24 <br />REQUIREMENTS. <br />9.GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS AND DIMENSIONS AND NOTIFY MAD <br />OF ANY DISCREPANCIES ADVERSELY AFFECTING THE LIGHTING DESIGN AND/OR INSTALLATION (INCLUDING <br />CONFLICTS WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ETC.) PRIOR TO PROCEEDING WITH <br />THE WORK. <br />10.FASCIAS OR ANY OTHER TRANSITION IN CEILING HEIGHT CREATED BY THE INSTALLATION AND/OR <br />ALTERATION OF HVAC DUCTS, PIPING, OR OTHER EQUIPMENT SHALL BE CONSTRUCTED OF GYPSUM BOARD <br />ON METAL FRAMING. <br />11.ALL JOINTS IN THE CEILING TILE FIELD SHALL BE SQUARE, LEVEL, AND PERFECTLY ALIGNED WITH EACH OTHER <br />AND WITH RECESSED LIGHT FIXTURES. <br />12.THE GENERAL CONTRACTOR SHALL PROVIDE CUTOUTS AND OTHER SPECIAL PROVISIONS IN ACOUSTICAL <br />CEILING TILE AS REQUIRED FOR LIGHT FIXTURES, REGISTERS, DIFFUSERS AND OTHER INSERTED ITEMS. <br />13.THE GENERAL CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY DAMAGED CEILING TILES WHICH ARE <br />REMOVED TO FACILITATE PLENUM SYSTEMS INSTALLATIONS. <br />14.PRIOR TO CLOSING CEILINGS, PLENUM SYSTEMS (HVAC, PLUMBING, ELECTRICAL, ETC.) SHALL BE INSPECTED <br />AND TESTED AS REQUIRED BY CONTRACTOR'S ENGINEER AND BY AUTHORITIES HAVING JURISDICTION TO <br />ENSURE PROPER INSTALLATION AND FUNCTION. <br />15.THE GENERAL CONTRACTOR SHALL NOT BE REQUIRED TO OPEN ANY CEILINGS FOR TELEPHONE, SECURITY, <br />OR COMPUTER DATA SYSTEMS INSTALLATION, REPAIR, OR RECONFIGURATION AFTER CEILINGS ARE CLOSED. <br />IF SUCH WORK IS REQUIRED, THE EXPENSE TO REOPEN CEILINGS SHALL BE BORNE BY THE PARTY <br />RESPONSIBLE. <br />16.THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL NEW LIGHT FIXTURES (COMPLETE WITH LAMPS) OF <br />TYPES AND MANUFACTURERS SPECIFIED. <br />17.WHEN NOTED ON THE DRAWINGS TO REMOVE & RELOCATE EXISTING LIGHT FIXTURES, THEY SHALL BE <br />REFURBISHED, CLEANED, AND RELAMPED AS REQUIRED. <br />18.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD SUPERVISION OF ALL MECHANICAL WORK <br />DURING INSTALLATION AND SHALL INSPECT ALL SYSTEMS FOR OPERATION AND CODE COMPLIANCE AT <br />COMPLETION OF THE JOB. <br />19.LOCATE NEW DIFFUSERS TO ALIGN WITH NEW FIXTURE PATTERNS. COORDINATE DIFFUSER INSTALLATION TO <br />AVOID CONFLICT WITH WORK OF OTHER TRADES IN PLENUM. <br />20.WHEN NOTED FOR EXISTING DIFFUSERS TO BE REMOVED & RELOCATED, THEY SHALL BE CLEANED AND <br />REFURBISHED AS REQUIRED. COORDINATE DIFFUSER INSTALLATION TO AVOID CONFLICT WITH WORK OF <br />OTHER TRADES IN PLENUM. <br />21.LOCATE HVAC GRILLES TO MINIMIZE SOUND TRAVEL FROM AREA TO AREA. NOTIFY MAD OF ANY <br />ANTICIPATED ACOUSTICAL PROBLEMS BEFORE START OF WORK. <br />22.ALLOWANCE SHALL BE MADE FOR LATERAL MOVEMENT OF THE SYSTEM. MAIN RUNNERS AND CROSS <br />RUNNERS SHALL BE ATTACHED AT TWO ADJACENT WALLS WITH CLEARANCE BETWEEN THE WALL AND THE <br />RUNNERS MAINTAINED AT THE OTHER TWO WALLS. REFER TO DETAILS ON SHEET ID5.2. <br />23.INSTALL SUPPORT WIRES AND CROSS RUNNERS TO AVOID CONTACT WITH HVAC EQUIPMENT AND <br />DUCTWORK. <br />24.THE GENERAL CONTRACTOR SHALL COORDINATE FIRE/LIFE SAFETY PERMITS WITH THE BUILDING'S FIRE/LIFE <br />SAFETY CONTRACTOR AND NOTIFY THE DESIGNER OF ANY DISCREPANCIES BETWEEN THE FIRE/LIFE SAFETY <br />SYSTEM REQUIREMENTS AND THE PLANS. <br />25.FIRE SPRINKLERS - PROVIDE COMPLETE SYSTEM INCLUDING, BUT NOT LIMITED TO, PIPING, VALVES, SPRINKLER <br />DROPS, AND SPRINKLER HEADS. USE REFLECTED CEILING PLANS FOR LAYOUT GUIDELINES. ALL SPRINKLER <br />HEADS SHALL BE FULLY RECESSED (FLUSH TO CEILING). <br />26.RE-WORK, RELOCATE, RETROFIT AND/OR INSTALL NEW FIRE/LIFE SAFETY ANNUNCIATION DEVICES AS <br />REQUIRED TO COMPLY WITH LOCAL GOVERNING CODES. <br />27.EXTEND OR MODIFY EXISTING AUTOMATIC FIRE EXTINGUISHING SYSTEM AS NEEDED, TO BE APPROVED BY <br />BUILDING AND SAFETY MECHANICAL PLAN CHECK PRIOR TO INSTALLATION. <br />28.FURNISH AND INSTALL SMOKE DETECTORS PER ELECTRICAL ENGINEER'S DRAWINGS. LOCATION AND <br />QUANTITY OF SMOKE DETECTORS WITHIN TENANT SPACE SHALL BE DETERMINED BY THE FIRE MARSHAL. <br />29.WHERE CEILINGS ARE SPECIFIED TO BE OF FIRE-RATED CONSTRUCTION, ALL RECESSED LIGHT FIXTURES, <br />SPEAKERS, ETC. SHALL BE BOXED OUT ABOVE THE CEILING WITH A FIRE-RATED ENCLOSURE EQUAL TO THAT <br />OF THE CEILING. <br />30.GENERAL CONTRACTOR SHALL COORDINATE WORK TO ACCOMMODATE VARIATIONS IN CEILING HEIGHTS <br />AND EQUIPMENT INSTALLED THEREIN. <br />31.THE GENERAL CONTRACTOR SHALL VERIFY THAT SPRINKLER AND HVAC PLACEMENT COMPLIES WITH ALL <br />APPLICABLE LOCAL CODE REQUIREMENTS AND RE-WORK AS NECESSARY. <br />32.ALL SUSPENDED GYP. BD CEILINGS SHALL RECEIVE SKIM COAT. PREP FOR FLAT PAINT FINISH WITHOUT ANY <br />APPARENT SEAMS OR IMPERFECTIONS. UNLESS OTHERWISE NOTED, REFER TO REFLECTED CEILING PLAN AND <br />FINISH PLANS PAINT SPEC, FINISH AND LOCATION. <br />33.CEILING FIXTURES, TERMINALS, AND DEVICES: <br />a.ALL LIGHT FIXTURES, AIR TERMINALS/GRILLS, OR OTHER DEVICES (REFERRED TO ALL BY COMMON TERM <br />FIXTURES HEREAFTER) SHALL BE MOUNTED IN A MANNER THAT WILL NOT COMPROMISE CEILING <br />PERFORMANCE. <br />b.ALL FIXTURES SHALL BE SUPPORTED DIRECTLY BY MAIN RUNNERS OR BY SUPPLEMENTAL FRAMING WHICH IS <br />SUPPORTED BY MAIN RUNNERS AND POSITIVELY ATTACHED WITH SCREWS OR OTHER APPROVED <br />CONNECTORS. <br />c.SURFACE MOUNTED FIXTURES SHALL BE ATTACHED TO A MAIN RUNNER WITH A POSITIVE CLAMPING DEVICE <br />MADE OF MATERIAL WITH A MINIMUM OF 14 GAGE. ROTATIONAL SPRING CLAMPS DO NOT COMPLY. <br />d.ACCESS PANELS: ACCESS TO THE SPACE BETWEEN THE CEILING AND THE FLOOR OR ROOF ABOVE SHALL <br />NOT BE ALLOWED. SMALL ACCESS PANELS FOR THE INSPECTION, ADJUSTMENT, OR REPAIR OF UTILITY <br />SWITCHES, VALVES, SENSORS, ETC MAY BE ALLOWED IF THE PANEL IS LESS THAN 300 SQUARE INCHES. SUCH <br />PANELS SHALL ALSO HAVE PERMANENT WARNING LABEL AS FOLLOWS: <br />WARNING: 1. DO NOT CLIMB, WALK, OR CRAWL ON THE GYPSUM BOARD CEILING. <br />2. DO NOT STORE OR STOW ANYTHING ON THE GYPSUM BOARD CEILING. <br />e.ALL LIGHT FIXTURES WEIGHING LESS THAN OR EQUAL TO 10 LB. SHALL HAVE ONE NO. 12 GAUGE SAFETY <br />WIRE CONNECTED FROM FIXTURE HOUSING TO STRUCTURE ABOVE. IT IS NOT NECESSARY FOR THESE SAFETY <br />WIRES TO BE TAUT. <br />f.ALL FIXTURES WEIGHING GREATER THAN 10 LB. BUT LESS THAN OR EQUAL TO 56 LB. SHALL HAVE TWO NO. 12 <br />GAUGE SAFETY WIRE CONNECTED FROM FIXTURE HOUSING TO STRUCTURE ABOVE. IT IS NOT NECESSARY <br />FOR THESE SAFETY WIRES TO BE TAUT. <br />g.ALL FIXTURES WEIGHING GREATER THAN 56 LB. SHALL BE SUPPORTED DIRECTLY FROM STRUCTURE ABOVE BY <br />APPROVED HANGERS. <br />h.PENDANT-HUNG FIXTURES SHALL BE SUPPORTED DIRECTLY FROM STRUCTURE ABOVE USING NO LESS THAN <br />NO. 9 GAUGE WIRE OR AN APPROVED ALTERNATE SUPPORT. THE CEILING SUSPENSION SYSTEM SHALL NOT <br />PROVIDE ANY DIRECT SUPPORT. <br />i.ALL RECESSED OR DROP-IN FIXTURES SHALL BE SUPPORTED DIRECTLY FROM FIXTURE HOUSING TO THE <br />STRUCTURE ABOVE WITH A MINIMUM OF TWO NO. 12 GAUGE WIRES LOCATED AT DIAGONALLY OPPOSITE <br />CORNERS. LEVELING OR POSITIONING OF FIXTURES MAY BE PROVIDED BY CEILING GRID. FIXTURE SUPPORT <br />WIRES MAY BE SLIGHTLY LOOSE TO ALLOW THE FIXTURE TO SEAT IN THE GRID SYSTEM. FIXTURES SHALL NOT <br />BE SUPPORTED FROM MAIN RUNNERS OR FURRING CHANNELS IF THE WEIGHT OF THE FIXTURES CAUSES <br />TOTAL LOAD TO EXCEED THE DEFLECTION CAPABILITY OF THE CEILING SUSPENSION SYSTEM. <br />j.PROVIDE A 2-INCH OVERSIZED RING, ADAPTER OR SLEEVE ON SPRINKLER AND SIMILAR PENETRATIONS TO <br />ALLOW FOR A 1-INCH HORIZONTAL DISPLACEMENT IN ANY DIRECTION. <br />34.ANY WALL MOUNTED FIXTURES SHALL BE MOUNTED SO AS NOT TO PROTRUDE BEYOND 4" FROM THE FACE <br />OF THE WALL IF MOUNTED AT HEIGHT OF LESS THAN 6'-8" A.F.F. <br />35.GENERAL CONTRACTOR SHALL FURNISH MAD WITH PLANS SHOWING LOCATIONS OF ALL LIGHT SENSORS, <br />EMERGENCY LIGHT STROBES, SMOKE DETECTORS, LIFE SAFETY PUBLIC ANNOUNCEMENT SPEAKERS AND <br />THERMOSTATS FOR REVIEW PRIOR TO ORDERING AND INSTALLATION. <br />36.CUT SHEETS AND/OR SHOP DRAWINGS OF ALL REGISTERS AND ACCESS PANELS (AS REQUIRED) SHALL BE <br />SUBMITTED TO MAD FOR REVIEW PRIOR TO FABRICATION, INSTALLATION, OR RELOCATION. <br />37.CONTRACTOR SHALL SUBMIT MECHANICAL AND SPRINKLER DRAWINGS TO MAD FOR APPROVAL OF <br />LOCATION OF SPRINKLER HEADS AND HVAC GRILLES. <br />38.THE GENERAL CONTRACTOR SHALL SUBMIT ONE (1) ELECTRONIC (PDF PREFERRED) SUBMITTAL OF SPECIFIED <br />LIGHT FIXTURES AND EQUIPMENT. IN ADDITION, TWO (2) FULL WORKING SAMPLES OF SPECIFIED LIGHT <br />FIXTURES SHALL BE SUBMITTED, IF REQUESTED BY MAD. <br />GENERAL FLOOR FINISH NOTES <br />1.ALL INTERIOR FINISHES SHALL CONFORM WITH CURRENT CBC CHAPTER 8 AND ARE TO COMPLY WITH CLASS <br />III FLAME-SPREAD REQUIREMENTS. <br />2.FLOORING SHALL MEET ALL CURRENT NON-SLIP STANDARDS AND REQUIREMENTS SPECIFIED BY APPLICABLE <br />CODES AND/OR AUTHORITIES. CONTRACTOR SHALL PROVIDE NON-SLIP COATINGS AS NECESSARY TO MEET <br />THESE REQUIREMENTS. <br />3.ALL MATERIALS AND INSTALLATIONS OF THE SAME SHALL COMPLY WITH ALL APPLICABLE LOCAL BUILDING, <br />FIRE AND ADA MUNICIPAL CODES. <br />4.ALL NEW FINISH FLOOR SHALL BE INSTALLED BY CONTRACTOR AS SPECIFIED ON FINISH PLANS. <br />5.ALL WORKMANSHIP SHALL BE OF THE BEST QUALITY. WHEN THE WORK IS COMPLETE, IT SHALL BE FREE FROM <br />BUCKLES, BUBBLES, OPEN JOINTS, OR OTHER IMPERFECTIONS. SEAMS SHALL BE KEPT IN ACCURATE <br />ALIGNMENT ALONG BOTH COORDINATES. TILES HAVING CHIPPED OR ROUNDED CORNERS WILL BE <br />REJECTED AND IF INSTALLED, SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE TILES AT CONTRACTOR'S <br />EXPENSE. <br />6.THE GENERAL CONTRACTOR SHALL FLASH ALL CRACKS, HOLES, OR OTHER IMPERFECTIONS (PROJECTIONS <br />SHALL BE REMOVED AND PATCHED) TO PROVIDE A CONTINUOUSLY SMOOTH FLOOR SURFACE WITH <br />VARIATION IN LEVEL NOT TO EXCEED 1/4" IN 10'-0" NON-CUMULATIVE. <br />7.THE GENERAL CONTRACTOR SHALL NOTIFY MAD AFTER FLOOR PATCHING IS COMPLETE FOR FIELD <br />INSPECTION PRIOR TO THE INSTALLATION OF FINISH FLOOR. <br />8.GENERAL CONTRACTOR SHALL COORDINATE WORK OF ALL FLOORING CONTRACTORS TO ENSURE THAT <br />ALL VARYING FLOOR MATERIALS USED ARE INSTALLED FLUSH. ALL TRANSITION METHODS SHALL BE APPROVED <br />BY MAD PRIOR TO INSTALLATION. <br />9.GENERAL CONTRACTOR SHALL FOLLOW ALL MANUFACTURERS RECOMMENDATIONS AND INSTRUCTIONS <br />FOR THE INSTALLATION OF ANY FINISHES OR PRODUCTS. <br />10.TILES SHALL BE LAID IN SQUARE PATTERN WITH COURSES PARALLEL TO WALLS, U.O.N. ON THE DRAWINGS. <br />TILES SHALL BE SECURELY CEMENTED AND SHALL BE LAID WITH TIGHT JOINTS. THE ADHESIVE USED FOR <br />CEMENTING THE TILES SHALL BE APPLIED FAR ENOUGH IN ADVANCE OF SETTING TO PERMIT THE ADHESIVE <br />TO REACH ITS INITIAL SET, BUT NOT ITS FINAL SET. ADHESIVES USED ARE TO BE NON-COMBUSTIBLE. <br />11.AREAS WHERE FLOOR FINISH IS SCHEDULED SHALL BE CLOSED TO TRAFFIC AND OTHER WORK DURING <br />INSTALLATION OF FINISH FLOOR. <br />12.UPON COMPLETION, ALL FLOOR FINISH WORK SHALL BE CLEANED BY THE CONTRACTOR, REMOVING ALL <br />SPOTS OF ADHESIVE, SURFACE STAINS, AND ALL SCRAPS. CARTONS AND CONTAINERS SHALL BE REMOVED <br />FROM THE BUILDING. <br />13.AFTER CLEANING, THE CONTRACTOR SHALL PROVIDE (2) APPLICATIONS OF AN APPROVED NON-SLIP WAX TO <br />RESILIENT TILE FLOOR, WHICH SHALL BE THOROUGHLY MACHINE-BUFFED AND LEFT IN CONDITION ENTIRELY <br />ACCEPTABLE TO MAD. <br />14.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE PROTECTION FOR ALL FLOORING WORK FOR <br />THE DURATION OF THE CONTRACT. ALL PROTECTION SHALL BE REMOVED PRIOR TO PUNCH LIST. <br />15.ACCURATE, DIMENSIONED FLOORING PLANS SHALL BE SUBMITTED TO MAD FOR APPROVAL PRIOR TO <br />INSTALLATION. ELECTRONIC FILE (PDF PREFERRED) SUBMITTAL IS ACCEPTABLE. <br />16.GENERAL CONTRACTOR SHALL FOLLOW ALL MANUFACTURERS RECOMMENDATIONS AND INSTRUCTIONS <br />FOR THE INSTALLATION OF ALL FINISHES OR PRODUCTS. <br />17.GENERAL CONTRACTOR SHALL SUBMIT AN ELECTRONIC FILE (PDF PREFERRED) OF CARPET SEAMING DIAGRAM <br />INCLUDING DIRECTION OF CARPET TO MAD FOR APPROVAL PRIOR TO ORDERING AND PRIOR TO <br />INSTALLATION OF MATERIALS. <br />18.PLASTIC LAMINATE BASE SHALL BE PROVIDED ON ALL MILLWORK SCHEDULED TO RECEIVE PLASTIC LAMINATE <br />FINISH (SEE ELEVATIONS). <br />19.GENERAL CONTRACTOR SHALL SUBMIT (3) 8" X 8" SAMPLES OF ALL FINISHES TO MAD FOR APPROVAL, PRIOR <br />TO PURCHASE OR INSTALLATION. <br />20.NO SUBSTITUTIONS OF FINISHES SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL FROM MAD. <br />GENERAL MILLWORK NOTES <br />1.REFER TO SHEET ID3.0 FOR EQUIPMENT, FIXTURE, AND MILLWORK HARDWARE/ACCESORY SCHEDULES FOR <br />CONTRACTOR SUPPLIED EQUIPMENT, FIXTURE, AND HARDWARE/ACCESSORIES. <br />2.ALL PLASTIC LAMINATE MILLWORK TO BE FABRICATED, ASSEMBLED, FINISHED AND ERECTED TO AWI CUSTOM <br />GRADE STANDARDS. ALL EXPOSED AND SEMI-EXPOSED SURFACES TO BE FINISHED WITH SCHEDULED PLASTIC <br />LAMINATE. MILLWORK TO BE 5/8" MELAMINE. MILLWORK FINISH, U.O.N.: BLACK AT COLOR PLASTIC <br />LAMINATE MILLWORK. WHITE AT WHITE OR LIGHT COLORED PLASTIC LAMINATE MILLWORK. <br />3.ALL VENEERED OR LACQUERED MILLWORK SHALL BE FABRICATED, ASSEMBLED, FINISHED AND ERECTED TO <br />AWI PREMIUM GRADE STANDARDS. ALL EXPOSED SURFACES INCLUDING DOORS, DRAWERS, FRONTS, <br />COUNTERTOPS AND BASE SHALL BE VENEERED. UNLESS OTHERWISE NOTED, MILLWORK SHALL BE FULLY <br />VENEERED. <br />4.THE GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE. <br />ALL INSTALLED MILLWORK SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES. <br />5.GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING FIELD DIMENSIONS IN ALL AREAS SCHEDULED <br />TO RECEIVE CABINETS NOTED HEREIN. <br />6.ALL INSTALLED MILLWORK SHALL BE SCRIBED TO WALL OR CEILING. CONTRACTOR SHALL COORDINATE <br />MILLWORK INSTALLATION WITH THE WORK OF ALL TRADES WHICH HAVE AN IMPACT ON MILLWORK. <br />7.PROVIDE BRACING IN WALLS AS REQUIRED FOR OVERHEAD CABINETS. WHERE OPEN SHELVING IS INDICATED <br />PROVIDE ALL EXPOSED EDGE SURFACES WITH PLASTIC LAMINATE FINISHES AND INTERIOR SURFACE WITH <br />WHITE KORTRON OR MELAMINE. <br />8.GENERAL CONTRACTOR SHALL ENSURE THAT MILLWORK CONTRACTOR SHALL BE RESPONSIBLE FOR ALL JOB <br />SITE CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO MAD PRIOR TO FABRICATION OF CABINET <br />WORK. <br />9.ALL MILLWORK IS TO BE FABRICATED IN A CONTROLLED SHOP ENVIRONMENT. FIELD WORK SHALL BE LIMITED <br />TO BLOCKING, TRIMMING, AND ASSEMBLED FINISHED COMPONENTS. <br />10.ALL MILLWORK JOINERY SHALL BE FABRICATED AND SECURED IN A MANNER WHICH ENSURES THAT THE JOINT <br />WILL NOT SEPARATE. <br />11.ALL CUTOUTS IN PLASTIC LAMINATE COUNTER TOPS (SINKS, GROMMET CHASES, ETC.) SHALL BE MADE BY <br />CABINET SUBCONTRACTOR AT SITE. <br />12.ALL WOOD VENEER PIECES SHALL BE FINISHED IN THE SHOP WITH SPRAY EQUIPMENT. NO FINISHING OTHER <br />THAN TOUCHUP TO BE DONE AT JOB SITE. <br />13.ALL REVEALS SHALL BE 1/8" U.O.N. AND BE ADJACENT WOOD FINISH OR ADJACENT PLASTIC LAMINATE WHERE <br />SPECIFIED. REFER TO ELEVATIONS. <br />14.GENERAL CONTRACTOR SHALL COORDINATE APPROPRIATE MUD RINGS FOR OUTLETS LOCATED ON FULL <br />HEIGHT BACKSPLASH. <br />15.GENERAL CONTRACTOR SHALL SUPPLY AND INSTALL ALL NECESSARY HARDWARE AS REQUIRED BY THE <br />SPECIFICATIONS OR INTENT OF THE DESIGNER. SUBMITTALS OF MILLWORK HARDWARE SHALL BE SUBMITTED <br />TO MAD FOR APPROVAL BEFORE ASSEMBLY. <br />16.CABINET HARDWARE - SEE MILLWORK HARDWARE/ACCESSORY SCHEDULE SHEET ID3.0 (U.O.N.): <br />a.ALL HINGES AT ALL MILLWORK SHALL BE FULLY CONCEALED. <br />b.ALL DRAWER GLIDES SHALL BE FULL EXTENSION EXTRA HEAVY DUTY; GLIDES TO BE BLACK AT BLACK <br />CASEWORK; SILVER OR WHITE AT WHITE CASEWORK. <br />c.ALL GROMMETS SHALL BE DOUG MOCKETT "THE MAX" SATIN ALUMINUM FINISH OR APPROVED EQUAL. ALL <br />GROMMET LOCATIONS TO BE FIELD VERIFIED BY ARCHITECT PRIOR TO INSTALLATION. <br />d.PEDESTAL CABINETS TO ACCOMMODATE PENDEFLAX LETTER AND/OR LEGAL FOLDERS. PROVIDE METAL <br />BRACES. <br />e.WASTE RECEPTACLE DRAWERS SHALL HAVE TWO (2) SETS OF HEAVY DUTY GLIDES. <br />17.ALL MILLWORK FINISHES SHALL BE AS SPECIFIED ON PLANS, SCHEDULES, ELEVATIONS AND/OR DETAILS, <br />U.O.N. <br />18.GENERAL CONTRACTOR TO SUBMIT AN ELECTRONIC FILE (PDF PREFERRED) MILLWORK SHOP DRAWINGS FOR <br />APPROVAL BEFORE FABRICATION AND INSTALLATION. CONFIRM FINISHES ON SHOP DRAWINGS FOR MAD'S <br />APPROVAL BEFORE FABRICATION. SUBMIT (4) 12"x12" SAMPLES OF EACH FINISH FOR APPROVAL. <br />19.ALL SPECIAL MILLWORK PRODUCTS AND SPECIAL ASSEMBLIES ARE SUBJECT TO SUBMITTAL AND REVIEW. SHOP <br />DRAWINGS AND SUBMITTALS SHALL NOT BE WAIVED UNLESS WRITTEN PERMISSION TO DO SO IS GIVEN BY <br />MAD. <br />20.MILLWORK SHOP DRAWINGS SHALL CALL OUT ALL MATERIALS AND FINISHES. ALL JOINTS, CORNERS, AND <br />EDGES SHALL BE DESCRIBED IN DETAIL DRAWINGS. ALL DIMENSIONS, CRITICAL OR OTHERWISE, SHALL BE <br />CALLED OUT ON THE SHOP DRAWINGS. MAD WILL NOT REVIEW SHOP DRAWINGS WHICH ARE INCOMPLETE <br />AND/OR WHICH SHOW MINIMAL DETAIL. <br />GENERAL WALL FINISH NOTES <br />1.ALL INTERIOR FINISHES SHALL CONFORM WITH CURRENT CBC CHAPTER 8. <br />2.ALL AREAS ARE TO BE PAINTED IN ACCORDANCE WITH FINISH PLANS UNLESS OTHERWISE NOTED OR <br />SPECIFIED. <br />3.PAINT COLORS AND ALL OTHER WALL FINISHES INCLUDING WALL COVERING SHALL BE AS SPECIFIED BY MAD. <br />4.THE GENERAL CONTRACTOR SHALL USE SPECIFIED PAINT PRODUCTS. IF SUBSTITUTION OF MANUFACTURER <br />IS REQUESTED, THE CONTRACTOR SHALL PROVIDE MANUFACTURER'S LITERATURE, INCLUDING FULL <br />APPLICATION SPECIFICATIONS, TO MAD FOR APPROVAL IN ADVANCE OF APPLICATION. <br />5.WALLS SHALL BE DEFINED AS SURFACES FROM FLOOR TO CEILING, INCLUDING PILASTERS, FASCIAS, JAMBS, <br />BUCKS, REVEALS, RETURNS, AND ALL VERTICAL SURFACES NOT INCLUDED IN CEILING. <br />6.INDICATIONS OF EXTENT OF WALL FINISH ARE GRAPHICALLY SYMBOLIC AND DO NOT REPRESENT EVERY <br />JOG, PROTRUSION, OR RECESS OCCURRING ON THE ACTUAL CONSTRUCTED SURFACE (NEW OR EXISTING). <br />THE CONTRACTOR SHALL PROVIDE SPECIFIED FINISH ON ALL SURFACES WITHIN THE LIMITS SHOWN ON THE <br />PLANS. <br />7.THE CONTRACTOR SHALL INSPECT ALL SURFACES FOR HOLES, CRACKS, AND ANY OTHER CONDITIONS <br />WHICH WOULD ADVERSELY IMPACT PAINT APPLICATION. ALL EXISTING LOOSE PAINT SHALL BE REMOVED. <br />ALL SURFACES SHALL BE PROPERLY PREPARED, PATCHED AS APPROPRIATE TO A SMOOTH CONDITION, AND <br />MADE READY FOR PRIME AND PAINT. THE CONTRACTOR SHALL NOT PROCEED WITH THE PAINTING WORK <br />UNTIL THIS HAS OCCURRED AT ALL SURFACES SCHEDULED TO RECEIVE PAINT. <br />8.COMMENCEMENT OF PAINTING WORK SHALL REPRESENT ACCEPTANCE OF SURFACE CONDITIONS. <br />9.THE GENERAL CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ALL ELECTRICAL SWITCH AND OUTLET <br />PLATES, SURFACE HARDWARE, ETC. PRIOR TO PAINTING AND REPLACE THEM WHEN PAINTING WORK IS <br />COMPLETE. ALL PAINT SPILLED, SPLASHED, OR SPLATTERED ON DIFFUSERS, REGISTERS, SLAB FITTINGS, ETC. <br />SHALL BE REMOVED WHEN PAINTING WORK IS COMPLETE. THE CONTRACTOR SHALL REPLACE ANY ITEMS <br />DAMAGED DURING THIS PROCESS WITH NEW ITEM TO MATCH EXISTING. <br />10.ALL WOOD SHELVING AND PAINTED DOORS SHALL RECEIVE PRIMING, SANDING, AND (2) FULL COATS OF <br />SEMI-GLOSS ENAMEL FREE OF BRUSH MARKS. THE CONTRACTOR SHALL EXAMINE ALL AREAS OF <br />CONSTRUCTION AFTER COMPLETION OF ALL WORK AND PERFORM NECESSARY "TOUCH-UP" PAINTING <br />AND/OR PATCHING. <br />11.THE GENERAL CONTRACTOR SHALL INSTALL WALL COVERING PER MANUFACTURER'S SPECIFICATIONS WHERE <br />INDICATED ON FINISH PLANS. WALL COVERING SHALL BE INSTALLED SMOOTH, WITHOUT WRINKLES, <br />BUBBLES OR LOOSE EDGES. ALL PASTE AND BRUSH MARKS SHALL BE REMOVED. WALL COVERING <br />ADJOINING WOOD AND METAL TRIM SHALL BE CUT STRAIGHT AND SQUARE. WALL COVERING AT ALL <br />REVEALS SHALL RETURN INTO REVEAL. ALL WORKMANSHIP WHICH IS NOT JUDGED TO BE FIRST QUALITY BY <br />MAD WILL NOT BE ACCEPTED. <br />13.REPAIR, PATCH (IF REQUIRED) EXISTING WALLS AND RE PAINT AS SPECIFIED. <br />14.SOFFIT AND FASCIA FINISH SHALL MATCH ADJACENT WALL COLOR, U.O.N. <br />15.SEE REFLECTED CEILING PLAN FOR CEILING FINISHES & LOCATION. <br />16.ALL ACCESS DOORS AND PANELS LOCATED IN DRYWALL CEILINGS AND WALL SHALL BE PAINTED TO MATCH <br />ADJACENT SURFACE COLOR AND FINISH, U.O.N. <br />17.GENERAL CONTRACTOR SHALL COORDINATE ALL FINISHES ON MILLWORK AS SHOWN ON MILLWORK PLANS <br />WITH THE MILLWORK SUB-CONTRACTOR. <br />GREEN BUILDING NOTES <br />1.INTERIOR AND EXTERIOR LIGHTING SHALL BE INSTALLED SUCH THAT ZERO DIRECT-BEAM ILLUMINATION <br />LEAVES THE BUILDING SITE. <br />2.ALL NEW EXTERIOR LUMINAIRES SHALL BE SHIELDED OR BE CUTOFF LUMINAIRES AS DEFINED IN SECTION 132 <br />(b) OF THE CALIFORNIA ENERGY CODE. <br />3.NEW NON-RESIDENTIAL GRADE EQUIPMENT AND APPLIANCES PROVIDED AND INSTALLED SHALL BE ENERGY <br />STAR LABELED IF ENERGY STAR IS APPLICABLE TO THAT EQUIPMENT OR APPLIANCE. <br />4.NONABSORBENT FLOOR AND WALL FINISH SHALL BE USED WITHIN AT LEAST TWO FEET AND PERPENDICULAR <br />TO EXTERIOR ENTRIES AND/OR OPENING SUBJECT TO FOOT TRAFFIC. <br />5.WHEN PROJECT OCCURS WITHIN THE LOS ANGELES CITY LIMITS, ONLY A CITY OF LOS ANGELES CERTIFIED <br />HAULER WILL BE USED FOR HAULING OF CONSTRUCTION WASTE. <br />6."AN OPERATION AND SYSTEMS MANUAL" SHALL BE PROVIDED TO THE FIELD INSPECTOR AT THE TIME OF <br />FINAL INSPECTION. <br />7.ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, <br />PLASTIC, OR SHEETMETAL UNTIL THE FINAL STARTUP OF THE HEATING AND COOLING EQUIPMENT. <br />8.THE VOC CONTENT VERIFICATION CHECKLIST, FORM GRN 2, SHALL BE COMPLETED AND VERIFIED PRIOR TO <br />FINAL INSPECTION APPROVAL. THE MANUFACTURER'S SPECIFICATIONS SHOWING VOC CONTENT FOR ALL <br />APPLICABLE PRODUCTS SHALL BE READILY AVAILABLE AT THE JOB SITE AND BE PROVIDED TO THE FIELD <br />INSPECTOR FOR VERIFICATION. <br />9.ALL NEW CARPET INSTALLED IN THE BUILDING INTERIOR SHALL MEET THE TESTING AND PRODUCT <br />REQUIREMENTS OF ONE OF THE FOLLOWING: <br />a.CARPET AND RUG INSTITUTE'S GREEN LABEL PLUS PROGRAM; <br />b.CALIFORNIA DEPARTMENT OF PUBLIC HEALTH STANDARD PRACTICE FOR TESTING OF (VOLATILE <br />ORGANIC COMPOUNDS) VOCs (SPECIFICATION 01350); <br />c.NSF/ANSI 140 AT THE GOLD LEVEL; OR <br />d.SCIENTIFIC CERTIFICATIONS SYSTEMS INDOOR ADVANTAGE GOLD <br />10.ALL NEW CARPET CUSHION INSTALLED IN THE BUILDING INTERIOR SHALL MEET REQUIREMENTS OF THE <br />CARPET AND RUG INSTITUTE GREEN LABEL PROGRAM. <br />11.THE FORMALDEHYDE EMISSIONS VERIFICATION CHECKLIST, FORM GRN 3, SHALL BE COMPLETED PRIOR TO <br />FINAL INSPECTION APPROVAL. THE MANUFACTURER'S SPECIFICATIONS SHOWING FORMALDEHYDE CONTENT <br />FOR ALL APPLICABLE WOOD PRODUCTS SHALL BE READILY AVAILABLE AT THE JOB SITE AND BE PROVIDED TO <br />THE FIELD INSPECTOR FOR VERIFICATION. <br />12.50% OF THE TOTAL AREA RECEIVING RESILIENT FLOORING SHALL COMPLY WITH THE VOC LIMITS OR BE <br />CERTIFIED UNDER THE RESILIENT FLOOR COVERING INSTITUTE (RFCI) FLOORSCORE PROGRAM. <br />13.AN AIR FILTER WITH A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8 OR HIGHER SHALL BE INSTALLED <br />IN NEW MECHANICAL SYSTEMS FOR OUTSIDE AND RETURN AIR PRIOR TO OCCUPANCY. <br />14.THE HVAC, REFRIGERATION, FIRE SUPPRESSION EQUIPMENT SHALL NOT CONTAIN CFC OR HALONS. <br />15.ARCHITECTURAL PAINTS AND COATINGS, ADHESIVES, CAULKS AND SEALANTS SHALL COMPLY WITH THE <br />VOLATILE ORGANIC COMPOUND (VOC) LIMITS LISTED IN TABLES 10.504.4.1 - 10.504.4.3. <br />16.AEROSOL PAINTS AND COATINGS SHALL MEET THE PRODUCT-WEIGHTED MIR LIMITS FOR ROC IN SECTION <br />94522(A)(3) AND OTHER REQUIREMENTS, INCLUDING PROHIBITIONS ON USE OF CERTAIN TOXIC <br />COMPOUNDS AND OZONE DEPLETING SUBSTANCES, IN SECTIONS 94522(C)(2) AND (D)(2) OF CALIFORNIA <br />CODE OF REGULATIONS, TITLE 17, COMMENCING WITH SECTION 94520; AND IN AREAS UNDER THE <br />JURISDICTION OF THE SOUTH COAST AREA AIR QUALITY MANAGEMENT DISTRICT ADDITIONALLY COMPLY <br />WITH THE PERCENT VOC BY WEIGHT OF PRODUCT LIMITS OF REGULATION 8, RULE 49 <br />17.ALL SEALERS, STAINS, AND FINISHES ON CONCRETE, WOOD, BAMBOO, OR CORK MUST COMPLY WITH THE <br />SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQD) RULE 113, ARCHITECTURAL COATINGS. <br />GENERAL CONTRACTOR SHALL SUBMIT ALL SEALERS, STAINS, AND FINISHES BEING USED ON THE PROJECT TO <br />WDG FOR APPROVAL PRIOR TO INSTALLATION. <br />18.NEW PLUMBING FIXTURES AND FITTINGS SHALL NOT EXCEED THE MAXIMUM ALLOWABLE FLOW RATE <br />SPECIFIED IN TABLE 10.303.2.3. <br />19.A FINAL REPORT FOR THE TESTING AND ADJUSTING OF ALL NEW SYSTEMS SHALL BE COMPLETED AND <br />PROVIDED TO THE FIELD INSPECTOR PRIOR TO FINAL INSPECTION. THIS REPORT SHALL BE SIGNED BY THE <br />INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE SERVICES. <br />20.NEW HARDWOOD PLYWOOD, PARTICLE BOARD, AND MEDIUM DENSITY FIBERBOARD COMPOSITE WOOD <br />PRODUCTS USED IN THE INTERIOR OR EXTERIOR OF THE BUILDING SHALL MEET THE FORMALDEHYDE LIMITS <br />LISTED IN TABLE 10.504.4.5. <br />21.THE BUILDING SHALL MEET OR EXCEED THE PROVISIONS FOR MECHANICAL VENTILATION OF SECTION 1203 <br />OR THE LOS ANGELES BUILDING CODE. <br />22.BUILDINGS THAT USE DEMAND CONTROL VENTILATION SHALL HAVE CO₂ SENSORS AND VENTILATION <br />CONTROLS INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE CURRENT EDITION OF THE <br />CALIFORNIA ENERGY CODE, CCR, TITLE 24, PART 6, SECTION 121(c). <br />23.IF THE NEW HVAC SYSTEM IS USED DURING CONSTRUCTION, USE RETURN AIR FILTERS WITH A <br />MERV OF 8. REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPPANCY. <br />24.TESTING AND ADJUSTMENT IS REQUIRED FOR ALL NEW INSTALLATION OF ANY OF THE FOLLOWING SYSTEMS: <br />a. HEATING VENTILATING AND AIR CONDITIONING SYSTEM <br />i. DESCRIBE THE HVAC SYSTEMS AND CONTROLS. <br />ii. PLANS SHALL INDICATE THAT THE HVAC SYSTEM AND COMPONENTS WILL BE TESTED, ADJUSTED <br />AND BALANCED IN ACCORDANCE WITH ONE OF THE FOLLOWING: <br />·TABB'S CONSTRUCTION SPECIFICATION INSTITUTE MASTERFORMAT <br />·NEBB'S STANDARDS FOR TESTING, ADJUSTMENT AND BALANCING OF ENVIRONMENTAL SYSTEMS <br />(7TH EDITION) <br />·AABC'S NATIONAL STANDARDS FOR TOTAL SYSTEM BALANCE (6TH EDITION) <br />·ASHRAE'S STANDARD 111-2008 <br />b. INDOOR AND OUTDOOR LIGHTING AND CONTROLS: <br />i. DESCRIBE THE TYPES OF LIGHTING FIXTURES USED AND THEIR CORRESPONDING CONTROLS AT <br />VARIOUS SPACES/ROOMS WITHING THE BUILDING (E.G. DIMMERS, OCCUPANCY SENSORS, <br />PROGRAMMABLE TIME SWITCHES, PHOTOSENSORS, ETC.) <br />ii. PROVIDE A NARRATIVE OF THE TESTING AND ADJUSTMENT PROCEDURE FOR THE LIGHTING <br />CONTROLS. <br />Sheet Title: <br />ISSUE DATE <br />ISSUE FOR PLANCHECK 12.22.2025 <br />All drawings and written material appearing herein constitute the original and <br />unpublished work of MAD Studio and the same may not be duplicated, used <br />or disclosed without the written consent of MAD Studio. <br />Sheet No.: <br />ISSUE DESCRIPTION <br />ENGINEER/CONSULTANT <br />ARCHITECT/ENGINEER STAMP <br />30 <br />5 <br /> <br />W <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />CA <br />F <br />E <br />OA <br />S <br />I <br />S <br />CLIENT <br />www.madstudiola.com <br />CITY STAMP <br />Project Director: <br />Project Designer: <br />Project Tech: <br />Project No:25030.300E.M. <br />E.M. <br />S.P. <br />ISSUED FOR MEP 01.13.2026 <br />ISSUED FOR PLAN CHECK COMMENTS- PLANNING DEPT.01.22.2026 <br />ISSUED FOR PRICING 02.17.2026 <br />ISSUED FOR PLAN CHECK COMMENTS - PLANNING DEPT.02.20.2026 <br />ISSUED FOR COUNTY REVIEW 03.24.2026 <br />ISSUED FOR ADDENDUM A 03.27.2026 <br />ISSUED FOR BUILDING DEPT REVIEW 04.08.2026 <br />ISSUED FOR BUILDING DEPT REVIEW - RESUBMITTAL 05.05.2026 <br />ISSUED FOR BUILDING DEPT CORRECTIONS 05.20.2026 <br />ID0.2 <br />GENERAL NOTES