My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10198790 - Permit
PBA
>
Building
>
Permits
>
F
>
First St
>
2116 E First St
>
10198790 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 11:31:57 AM
Creation date
11/5/2021 11:31:56 AM
Metadata
Fields
Template:
Permit
Permit Number
10198790
Full Address
2116 E First St
Permit ID
249531
Master ID Number
2018-147742
Project Name
AMG First Point Mixed Use Community
Street Number
002116
Street Direction
E
Street Name
First
Street Suffix
St
Building Use Code
Resid-Multi-unit
Job Types
New
Permit Type
Building
Applied Date
1/3/2019
Flood Zone
X-0602320277J
Description of Work
5-Story Residential over podium garage- floors 2nd through 6th floors-206 units (1) 1-bedroom, (79) 2-bedrooms, (62) 3-bedrooms, (64) 4-bedrooms
Nature of Work
Residential
Document Relationships
10198789-90_Structural Calculations - Plan
(Plan)
Path:
\Building\Plans\F\First St\2116 E First St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commont #25 IAMMR Justltlcatlonl i Provide conslruclion delails to show compliance with requirements of <br />CBC Socr/br, 1206.3.2 for hoizontal air lnlake tor oach cout yard tor lhis proiect. <br />Response: Horlzontal alr intake at the bottom of €ach Level 2 courl ln Building A and B ls provided by <br />way ot the open-ended firsfighter tunnel connecting each court lo at leasl one adjoinlng court(s). CBC <br />Section 1206.3.2 requiros that court endosed on all four sides to ba provided with a horizontal air intake <br />at the botlom of lho court or be adlacent to a yard or publlc way. To comply wlth the lntent of thls <br />seclion, th6 opon-ended lirelighter tunnels will provide an avenua for natural ventilation from an <br />ad,iacent court that is equivalent to the roquked op€ning of 10 square feet connected directly to a street <br />or yard. Tho courts ln the prolect buildings are much larger than the minimum dimensions required by <br />Section 1206.3 (i.e. 9' x 16' minlmum dimensions for a S-story court). Courtyards 1 and 2 in Bullding B <br />have approximate dimensions of 62' x 90' where Courtyard 3 has approximate dlmenslons of 48190'. <br />These dimenslons provldo a court area that ls at l€ast 30 limos largor than the minimum size court <br />required by CBC Section 1206.3. The larg€r sizes of th6 courts within the prdect buildings do not havo <br />the same characterisllcs of a smaller four-sided court that can act as a chlmnsy during summer w€ather <br />whon lhe bullding mass is heatod from the daytimo sun (referonced attached drawing sh6ot A2.2.1). <br />Additionally, it ls not intended for the courls to functlon as an etlicient sourco of natural ventilation for tho <br />spaces they front (i.e. dwelling unlts, lounges, otc) lh6refore the requirement for having the courts abut a <br />yard or publlc way is less essential. <br />(rirst Poitt Apartments - Santn Ano, CA) <br />those two axll passdgeways show c,fndldnc€ with tho CBC Soctbn 1021.1. '.. . exft pessagleway on othet ahan <br />levalof exit discharge, shall tomlnate al an exil.'Also, the opening protection in rho 6xit passagaways sha,, <br />comply with Sections 1024.5, 716, and Tablo 716.5 requlromenls. <br />Resoonse: Th6 flreflghtor tunn€ls aro providod for riro departmont access to the lnterior courtyards p€r <br />OCFA Guideline B-09 hese tunn s are not utilizad as an exit onen t of ths eorass svstam andTelcomo <br />are not reouirod to comolv with the reo UI m ents lor exit oassaoawavs The current agress scheme <br />does not raquire the lntroductlon of exit passageways at the lowest residential level as delin6d in the <br />CBC and as regulated by CBC Section 1024. These tunnels will be refened to as'2-Hour Rated <br />Firefighter Tunnels' ln lleu of'2-Hour lnterior Exit Passageway" as proviously sho\Ml on th€ drawings. <br />Per OCFA Guideline B-09, the interior doors opening into the tunnels will be go-minute rated solf- or <br />automatic-closing assemblies, but the ends of each s€gment of tunnel that connects the open court <br />yards should not b€ requlrod to b€ €ndosed sinc6 the opening is r€quired for firolighters to conduct th€ir <br />oporations, <br />ln addition to the dan ch6ck comment responses abo/e, th€ dssign team nrould like to address the disctErge of <br />interior 6xlt stairways at Level l: <br />Eoress Court Condition: The interior exit staaru/€y identilied as Stair #1 discharges at Level 1 to a p.ivate <br />sid€walk located on th€ \r,est side <br />of the project that leads to the public way on East First Str8et. The prop€rty line is locet€d approdmately 6.5- <br />feet frorn lhe face of the exterior wall on the ne$ side of the building. As such, this creatas an egress court <br />condition that is less than 1o-fe€t in width measured b€tu,Een th€ exlerior wall d the buildng and the p.operty <br />line. See Exhitrit A attached. <br />Page3oa4 I llovsnber 25, 2019 lR6/1 jensenhughc^s.cont
The URL can be used to link to this page
Your browser does not support the video tag.