My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC. (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 1:50:26 PM
Creation date
6/13/2018 3:58:40 PM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
5/1/2018
Document Relationships
20A - AA WESTMINISTER IMPROVEMENTS
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2018\05/01/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 YEAR REFERENCES - PUBLIC WORKS <br />1. Proiect Name <br />2016/2017 Arterial and Minor Streets Maintenance <br />Project Address Owner <br />Various Locations City of Riverside <br />Principal Contact Phone <br />Steve Howard, Construction Project Manager (951) 826-5708 <br />Price of Contract Type of Work Dates <br />$4,594,000 Streets Maintenance 9/2017 — on going <br />2. Proiect <br />Concrete Street Rehabilitation, FY 2015-16 <br />Project Address Owner <br />Various Locations City of Orange <br />Contact Phone <br />Matthew Lorenzen, Project Manager (714) 744-5566 <br />Price of Contract Type of Work Dates <br />$574,850 Minor Concrete, Street Improvements 7/2016 to 10/2016 <br />3. Proiect <br />Washington Square Residential Street Improvements <br />ProjectAddress Owner <br />Grand Ave. from First St. to Fourth St. City of Santa Ana <br />Contact Phone <br />Tyrone Chesanek, Principal Civil Engineer (714) 647-5074 <br />Price of Contract Type of Work Dates <br />$984,925 Minor Concrete, Street Improvements 4/2016 to 10/2016 <br />4. Proiect <br />ADA Access Improvements Del Cerro/Burma Rd Entrance to PV Nature Preserve <br />Project Address Owner <br />Del Cerro/Burma Rd. City of Rancho Palos Verdes <br />Contact Phone <br />James Flannigan, Asst Eng. (310) 544-5295 <br />Price of Contract Type of Work Dates <br />$99,470 Exposed Agg. Sidewalk, Ramps, Drive approach 1/2017 to 3/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.