My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC. (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 1:50:26 PM
Creation date
6/13/2018 3:58:40 PM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
5/1/2018
Document Relationships
20A - AA WESTMINISTER IMPROVEMENTS
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2018\05/01/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 YEAR REFERENCES — PUBLIC WORKS <br />rct <br />/16 Curb Access Ramp Installation <br />Project Address Owner <br />Various Locations City of Huntington Beach <br />Contact Phone <br />Jim Escutia, Public Works 714) 536-5525 <br />Price of Contract Type of Work Dates <br />$327,200 Curb Ramps, Domes 5/2016 to 6/2016 <br />6. Project <br />Rancho Santa Fe Road ADA Curb Ramp Reconstruction <br />Proiect Address Owner <br />Rancho Santa Fe Rd City of San Marcos <br />Contact Phone <br />Duane Neyes, Construction Mgr. (760) 744-1050 <br />Price of Contract Type of Work Dates <br />$290,100 Ramps, Sidewalk, Gutter, Domes 6/2017 to 7/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.