COW and ARAM Pavement ifahabilltaflont The task included a total of 42 streets, sod had striothudget,: funding,. and
<br />scheduling components. The City naaded a censo tont who could onslyze aaverol alternative pavement rehabllitallon
<br />strategies under a limited corratruotlon budget, while stilt meeting the required projectguldeRnes to obtainfunding.
<br />tmprovemonts entailed grind acrid overlay of all streets In both bid packages, with the rise of on Asphalt Rubber and
<br />Aggregate Membrane (ARAM) interlayer, with localized areas of hall -depth remove and replace. Klmley-Flom assisted the
<br />City to meet requirements fora grant from the Department of Resources Recycling and Recovery (Cat Recycle) and the
<br />Community Development Wok Giant tPUG) federstfunding program. Klmley Horn's knowledge Of how and innovative
<br />Pavement rehabilitation strategies has helped the City utillze reoycleid materials and'tnwplgoe recycling methods, which
<br />has brougntthe Oityseveral funding opportunities and millions of dollars to construction costsovings.
<br />Client Raferanaa; City ofFsntana, KelthKromac Public Works-Manoger, 909.350,6644
<br />West Grove Valley pipelines, Riverview Pipelines, Santa Arta, CA (Hazed acid Sawyer)
<br />Uo projects with the City of Wig Ana Included a total of over 17,000 Linear Peet of water pipeline design ranging in
<br />size from 84hoh to 12-Inch.diamoter.. The City Is actively replacing aging and undersized water mains throughout their
<br />distribution system: The West Grove Valley project lnoluded 9,500 Linear Feat of pipeline replacement design. The
<br />.Riverview, project included 7,700 Linear Feet.of pipeline replacement design;
<br />Client Reference: City of Santa Ana, Public WnrksAgency,, Armando Fernandez, Project Menage, 714.647.5680
<br />Well 29 improvements Alternatives Analysis, Santa Ana, CA (Hazen arta Sawyer)
<br />The City of Santa Ana owns and opsrates Well 29, located at the southeast comer of Flower.9treet olid First Street;
<br />adjacent to City owned tonrils oourt's, Well 29 pumps dirot:tly to an existing 8 MG reservoir, The existing well site includes
<br />the well head and discharge, piping assembly, control equipment, a chlorination system in a building, and. an SCE
<br />transformer. An alternatives analysis Was.conducted W recommend, upgrades at the site including site improvements,
<br />structural, mechanical, and electrical upgrades: Highlights of the study include developing three altsrnativos for the
<br />Improved site, providing 30 renderings for each site alternative, and developing a preliminary. opinion of probable
<br />cost for the design and construction of each alternative discussed. The Gillis moving forward with Implementing the
<br />recommended alternative from this analysis.
<br />CLlont Reference: City of SantaAnp, Publie Works Agency -.Wafer Resources DlvWon, laden igo, Assistant Engineer
<br />714.6473380'
<br />References
<br />We have provided client references in the previous section and below. We Invite you to contact these recent clients and
<br />ask them about our work history, quality of service, and whotherthey would again select us for simllar services.
<br />Me, Carlos Castellanos, City Engineer, City of Anaheim
<br />TEL: 714.765,5176 (On -Call Planning and Engineering projects)
<br />Mr,. Keith Kramer, Public Works. Manager. City of Fontana
<br />TEL: 909,350.6644 (On -Coil Pavement Rehabilitatlonititllity Design Projects)
<br />Mr. Jason Lee, Project Manager, Orange County Transportation Agency
<br />TEL: 714.560.6282 (On -Call Transportation Engineering projects)
<br />Kimlep Horn ra moc7roas:r7rcurofOontaAna
<br />25E-104
<br />
|