Laserfiche WebLink
2. SCOPE OF SERVICES AND SCHEDULE <br />Scope of Services <br />The tasks below are Intended to demonstrate the work to be implemented and the dellverabiesto be provided as part <br />of the On -Gall services..Additicnai Items not in the Soope of Services maybe required to complete the On -Coll project, <br />Design pians and reports indicated will follow the Clty's standard format, unless raqulred otherwise, Tasks are marked per <br />options A and B as outlined in the RFI? <br />Task 9: Project Management and Coordination Options A and r3) <br />...... ........ .....(. .. ,.,... .,...... <br />Kimley Horn team members will attend an ltiltlel kiek off meeting to confirm project elements, ob1600,.scope, and <br />schedule; and attend monthly PDT coordination rneefings with the City. We will conduct' meetings and conference cells and <br />provide pertinent meogng minutes with action Items and.wiil prepare monthly progress reports, as part of die invoice package. <br />As part of this task, a Gantt Chart Format Target.Schedule will be provided showing primary tasks and review periods/ <br />processing, in.agjeoment with the City Klmley-Hom MI maintain a Progress Schedule showing actual progress versus <br />target and provide to the Cky one monthly basis. <br />Deliverables: Mooting agendas, meeting minutes, action Items, progress reports, Invoicing, draft target schedule, <br />monthly updated schedule. <br />Task 2: record Research and Utility Coordination (tafat%ns A and) <br />Klmlay-Horri will obtain readily avellable record drawings and data pedin0ht to tha scope of services, such as GIS <br />mapping, as -built pians, and utility atlases, We will maintain a utility agency tracking list to Indicate the status of <br />communication and add a contact list for substructure and utility owner -operators that will piso carry over to the <br />specifications, We will assist the CRy with utility notificeticn tetters. These letters will notify the utility agency of the project, <br />describe anticipated Impacts, and Identify action required, <br />Do"vereAles: utiityagency tracking list, witynotifloationtotters, <br />Task 3: geotechnical Study (Options A and 8) <br />..................................................................................................................................... <br />Pavement Evaluation: We will use City's provided traffic index for pavement design,. Pavement evaluation will consist of <br />the following services: <br />• Subsurface exploration consisting of the excavation, • Evaluate Expansion Index and Corrosion potential of <br />sampling, and logging subsurface soils <br />• Evaluate the 11 -value and In-place moisture content of • Analysis and design of now pavement and pavement <br />subsurface sells rehabilitation alternatives <br />• Excavation and compaction requirements • Provide recommendation for sidewalk improvement <br />Infiltration foot: Our team will conduct a geotechnical field review and will provide recommendations as follows: <br />Percolation rate test to the depth of eight feet Grain Size Distribution and Atterberg Limits/Plasticity <br />• Agronomy/soil fertility laboratory testing Index <br />• Obtain bulk soil samples at selected depths <br />• Percolation rate characteristics of the Solis <br />City of Sante Ann I T80077023.17 <br />Moisture content <br />Suitability of the on-site solls for landscape <br />Improvements <br />is <br />25E-105 <br />Kimley*Horn <br />