I ' <br />ON-CALL ENGINEERING SERVICES <br />Ww Re¢wx -OpDmA <br />Task 2: Utility Research and Design Survey - Tetra Tech will conduct as -built and utility <br />research within the project area. The utility research will include contacting USA, and sending <br />preliminary notice to each utility company within the project area. Tetra Tech will verify the <br />location of the utilities. based an the IDSA Information by a field walk of the alignment, Tetra Tech <br />will identify any critical utilities which are recommended to be potholed, We will prepare. a <br />memorandum summarizing the pothole recommendations for the city review and approval. For <br />this sample project, we are assuming that five (5) utilities for thesewer main may be necessary <br />to be performed to confirm the vertical alignment of the:sewar. We do not recommend potholing <br />for the PVG water main. The potholing suboonsuitant will procure the neoessory permit.$, <br />Including preparation of typical traffic Control. plan (nota afte-specific traffic control plan). <br />Field topographic survey will be`perlormed for the existing well slte, :area immediately around <br />the existing well site Including the adjacent streets, The field topographlo survey, will include <br />curbs, gutters, medians, light poles, Improvements, surface breaklinse, ramps, above ground <br />facilities, utility manholes and pull bt?xt3s and the dipping of sewer and storm draln manholes: <br />Our survey suboonsuttant will ;provide a field survey profile over the proposed sewor.pipellhe at <br />50-foot,intervals, This Is similar to what we have done previously for other sewer replacement <br />projects, <br />Task M faeoteehh(dal Recommendations - Due to the potential of encountering ground water <br />during the construction of the proposed sewer main, we are recommending a geoteohnicai <br />Irrvestlgation be performed during the design phase of the weak. We have assumed a total of <br />three (3) borings for the pipeline work.; One of tho borings can be located at the existing well site <br />if a now building is required for the chlorination facilities, The cast difference between doing one <br />boring verses three borings is minimal and the additional data will only ensure that the <br />contractor bidding on the project has the necessary Information to bid the project. We have <br />assumed the following: field exploration can be performed during the daylight hours on <br />weekdays under a no charge City' Excavation permit; Identification, handling and treatment of <br />materials that need to be environmentally addresses are beyond our scope of work; and the <br />removal of USA markings Is not Included in our scope of work, In addition, we have assumed <br />that typical traffic control plans will be acceptable to the City and site specific traffic control plans <br />will not be required. <br />'task 4: Well Assessment • Richard C. Slade & Associates (ROS), as a subconsuitant to Tetra <br />Tech, will perform the following scope of work: <br />Review available well data (both historic and current). perform a site visit. <br />Prepare teohhloai speeffication and bid form for the City to contract with a well rehabilitation <br />company for the preliminary investigation of the well. This work will include: conducting an <br />initial short-term pumping test; removal of pump, sound bottom of casing and perform a <br />down -well survey, <br />Provide support/assistance to the City during the preliminary Investigation work at the well. <br />Prepare Technical Specifications for the rehabilitation of the well, including probable cost for <br />the rehabilitation work. Also, prepare a memorandum discussing the estimated iawer <br />production capacity of the well based on a new Casing finer. <br />» Perform field monitoring of the well rehabilitatlon construction (this Is an optional task). <br />This Optional Task includes the following: attend pro -construction meeting; observe the <br />removal of the pump on a full-time basis; support during well surveys; monitor the brushing <br />and bailing of the well (two days); observe the Casing liner Installation on a partAlme basis; <br />monitor the mechanical and chemical development on a full-time basis; monitor the <br />swabbing and airlifting on a full-time basis; observe the video surveys; present during the <br />City of Santa Ans -13 � TETMA TECH <br />25E-178 <br />