My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-CALL ENGINEERING SERVICES <br />WO,Ur R6i4VICA9-0,X0A <br />pumping redevelopment and pumping tests on A part-time basis; preparation of the <br />reoommended new pumping rate and depth setting for the now pump; observe the final well <br />vidso survey; .and prepare a summary.of well rehabilitation operations report, <br />Task 6s Basis of Design - Tetra Tech will prepare a 84pis;©f Design Report summarizing tha <br />findings of the well assessment, necessary Well modifications, the pipeline design requirements, <br />and the pipeline .alignment selection. The Basis of Design Report will include the following <br />Issues; <br />• Overall. evaluation of the existing well based on current operation and City standards. <br />• Recommended well rehabilitation. <br />» Recommended Well modifications required to pump water directly into distribution system <br />instead of into :adjacent reservoir: size of pump/motor; pump to waste; et0. <br />• Evaluation of chlorination facilities and any recommended modifications. <br />» Evaluation of sits Payout, access issues, piping Modifioations, :eto, <br />» Evaluation..& existing electrical taoilitles and recommended upgrades, <br />• Evaluation .of existing communications and controls, Recommend upgrades. <br />» Identify any hydraulic issues for the change in well operation. <br />Update. the wed Operational Functional` Specifloallon for the well (ars Qptt4As I Teak). <br />• -Summarize. the alignment analysis and the recommended alignment selootion. <br />• Determine pipeline mat6rial; PVG for water main (unless restrained joints are required and <br />DIP is recommended); and PVC (SDR -33) for the sewer main (unless depth Is greateuthah <br />10 to 12 feet and extra -strength VCP to recommended). <br />• Summarize the preliminary staging for construction and traffic management.plan. <br />» identify all permits and time frames for processing said permits.. <br />• Prepare prellminary estimate of probable construction costs. <br />Tetra Tech will prepare preliminary drawings (30% milestone) for both the pipelines and well <br />rehabilitation as part of the Basle of Design Report. <br />Task 6, GEOA Documentation . Tetra Tech :will prepare documentation required to fulfill the <br />California Environmenlal Quality Act (CEQA) requirements. We have assumed an initial Study <br />(IS)/Proposed Mitigated Negative Declaration (MND) will be required as was in the RFP for both <br />Well No. 32 and Well No. 20 Rehabilitation Projects. However, on similar past projects where <br />the rehabilitation of the well was minor and no building modifications were required, a Notice of <br />Exception was only required as the project was only replacing an existing facility with no <br />appreciable upsize In capacity. The following Is a brief summary of the anticipated scope of <br />work for the 15/MND: <br />• Technical studies for air quality/greenhouse gas and noise are included, as well as <br />biological resources letter report. <br />• Perform project initiation and organization. <br />Prepare prosot description. <br />• Prepare and submit administrative Draft I$/MND using the CEQA checklist. <br />• Prepare revisions, produce and circulate Draft is/MND. <br />• Prepare draft responses to public comments, and Compile and submit final 15/MND, <br />Task Z. 60% Construction Document (PS&E) Submittal - Tetra Tech will prepare 60% <br />design plans, specifications and estimate of probable construction costs (P5&E's) in <br />accordance with the approved criteria as outlined in the Final Basis of Design, Two (2) hard <br />copies of full size plan sets, four (4) hard copies of half-size plan sets and one electronic pdf <br />Illy of Santa AMA .14- TETRA TECH <br />25E-179 <br />;t <br />.P <br />J: <br />"' <br />'E_t <br />r'i.+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.