Laserfiche WebLink
N'TETRATECH <br />Mr. Bohn has provided design engineering In various water and <br />wastewater projects Including domestic and reclaimed water <br />pipelines, water main replacements, gravity sewer mains, CIPP <br />sewef lining, pull7p stations, liftetatlons, reinforced concrete <br />reservoirs, flow control facilities, and pressure reducing valve vaults. <br />Reset nslbilities have included preparotlon of conatruction plans, <br />speofficeticns, end dasjgn calculations; ass(stad superGisors in <br />pro pa ring. project memorandums; organized officatechnical Tlbrary. <br />EXPERIENCE <br />Newport Boulevard Water Main. Rehabilltation, City of Newport <br />BeOCh, GA — Provided:enginearing support foe _the <br />repladentaht1rehabiiitation of the existing 20/164noh cost iron pipeline <br />constructed in the mid -1'920s within Newport/Saiboa Bouleyord: from <br />'the intersection of VIA Oporto and Central Avenue to the lntersootion <br />of Balboa Boulevard and 101" Street. "this pipeline is vital as It <br />provides water anal fire flow protection to thee businesses and <br />resident's In the Newport Say and Peninsula area. <br />Kyle Bohn, PE <br />Design Engineer <br />12000atton: <br />9.S., Civil Vng)n®ering, <br />University of California, Irvine, <br />20.08 <br />ReglatratiunsrCortiNcationei <br />Registered Civil Engineer; <br />2011, California No. 77884 <br />Emielle fiberflow, Design and <br />Enginae lrio 4onification <br />Office: <br />Irvine, C*11fornle. <br />Years of EXfvditnces <br />12 <br />Years with Tetra Tech: <br />12 <br />QSWG Waterline Replacement Projects 2010, 4oldon State <br />water company, City pf HOwthorne and County o.f Los Angeles, <br />GA - As Design Engineer, assisted with conipietii g design plans for <br />seVeral water main replacement projects throughout the GSWC <br />service areas primarily the Southwest District. The work was completed as part of a design-bulid <br />contract teamed.with Precision Pipeline. Work included; existing utility, research -and base map <br />preparation, determining abandonment required, alignment selection and field check surveys, <br />Interaction with GSWC project manager with plan check comments, and obtained permit conditions <br />for construction for various affected cities. Project locetions included City of Hawthorne snd'County <br />of Los Angeles. Streets included: Budlong Avenue, Korn lura Avenue,132nd Street, and Doty <br />Avenue, Total water main footage was approximately 6,000 feet of 12- through i 6 -inch pipe. <br />Water Lille Replacement Projects, City of Lakewood, Lakewood, CA - Design Engineer for the <br />preparation of plans and specifications of multiple water line replacement projects for the City of <br />Lakewood, Projects included preparation of plans, specifications, and cost estimates for over 501000 <br />linear feet of 6- to 124nch pipeline. <br />Centennial Park Neighborhood Water Main improvements, City of Santa Ana, Santa Ana, CA - <br />Deslgn Engineer for approximately 20,000 linear feet of 6 -inch PVC water main to replace existing <br />water mains. <br />Central City Water Main Improvements, City of Santa Ana, Santa Ana, CA - Design Engineer for <br />approximately 6,600 linear feet of 8 -Inch PVC water main to replace existing water mains. <br />Recycled Water Distribution System Expansion, EI Toro Water District, Laguna Woods, CA - <br />Design Engineer for the design of over 20 miles of recycled water pipelines for the EI Toro Water <br />District's - Recycled Water Distribution System Expansion Project. The pipelines ranged In size <br />from 4 -Inch to 20 -inch in diameter, and convey up to 775 acre-feet of tertiary treated recycled <br />water per year. The major customer being served recycled water is the Laguna Woods Village <br />Home Owners Association (formerly Leisure World). <br />Well No. 27, City of Grange, grange, CA -. Design Engineer for the drilling and equipping of <br />Well No. 27, a new potable water well (930 feet deep.). The project Involved the partial <br />Pagel <br />25E-199 <br />