Page 2 <br />25E-200 <br />TETRATECH Kyle Bohn, PE <br />Design Engineer <br />demolition of an existing warehouse to accommodate the footprint of the new well, installation of <br />a CMU biocontrc 11idingand sodium hypochlorite building, 12.fi% sodium hypochlorite <br />a <br />01 <br />disinfection facility, sound enclosure around the well head as well as site. and landscaping <br />0 <br />Improvements. <br />C! <br />SA -4 and SA -5 Vault Relocation$, City Of Santa Ana, Santa. Ana, CA — Design Engineer for <br />the .design -and, construction phases of two pressure reducing valve vaults. The project included <br />the design of steel and -ductile iron yard piping and connections to the existing City system, <br />pressure reducing valves, and concrete vaults. <br />G <br />Trunk Une.Sawar Reconstruction, City of Son Juan Capistrano, Son Juan Capistrano, CA <br />— Design Engineer for design to replace approximately 450 linear foot of deficient 24-Inph <br />sewerthe design Included removing on existing abandoned 30 -Inch sower and construotliv, a <br />new 274rich PVC sewer In Its place. Project Included permitting through the City of Deno Point <br />ood coordination with SOCWA. <br />Sao Lorenzo Sewage Lift Station, City of Sorfts.Aaa, Santa Ann, CA — Design Engineer for <br />the preparation of plans, specifications and cost ostirnates to construct a new sewer lift station <br />Lorenzo, Avenue within the City of Santo Ana. The Improvements Included swat Well, <br />on Ban.Lorenzo, <br />dry well, three variable frequency drive PUMP$, AbovOVOUPCI CMV block control room, <br />emergency generator, hardscape and landscape Improvements, and ApProklmotely 1,366 linear <br />foot of new sower Main. <br />Gislor-Rodhill Trunk Improvements, Reach 8, Orange County Sanitation District, Tustin, <br />CA— Design Engineer for the replacement of 21- and 24 -inch sewer mains in the Gisler -Redhill <br />Trunk Improvements, Reach B to be replaced with 24- to 36 inch pipelines. The project <br />traversed through the cities of Tustin, Santa Ana and Irvine. Scope of services included <br />preliminary design, final design, and construction administration. <br />Western Avenue Sewer Project, City of Buena Park, Buena Park, CA — Design Engineer for <br />the preparation of plans, specifications and cost estimates for construction of 1,700 linear foot of <br />a 15 -inch VCP relief sewer In Western Avenue. <br />36 -Inch Transmission Main Replacement, City of Anaheim, Anaheim, CA — Design <br />Engineer for the preparation of the plans, specifications, cost estimates and construction <br />services for the construction of 700 linear feet of 3e -Inch steel pipeline, <br />Ohio Street and Oriente Drive Pipeline Replacement, Yor4a Linda Water District, Yorba <br />Linda, CA— Design Engineer for approximately 3,000 feet of 16 -inch ductile Iron and 1,000 feet <br />of PVC water main to replace existing cast Iron water mains within the City of Yorbo Linda, The <br />t. <br />project Included the replacement of existing water services, fire hydrants and the up-sizing of <br />the existing main. <br />SA -3 Vault, City of Santa Ana, Santa Ana, CA — Design Engineer for tho. design and <br />.construction phases of a pressure reducing valve vault. The project included steel yard piping <br />and connections to the existing city system, a pressure reducing valve, and a concrete vault. <br />Page 2 <br />25E-200 <br />