Laserfiche WebLink
TETRATECH Erin Cabatiiero <br />l ^"1 Well Design <br />Nis, Cabafiiero has provided design engineering in various water <br />Mandan. <br />and wastewater projects including domestic vvatO pipelines, water <br />B.S., civil Engineering, <br />main replacements, gravity sower mains, gravity force -main, <br />university of aalifomia, Irvine, <br />,pump stations, [fit stations, reinforced concrete reservoirs, steal <br />2009 <br />tank reservoirs, flo* control facilities, .and pressure reducing valve <br />Registrations: <br />vaults: Rosppo Ot101o heve'inciuded: preparation of oonetruoticn <br />Engineer In Training, <br />plans, specifications, end design ealoulations; assisted <br />California, 200a, No. 1,31.89`1 <br />supervisors In preparing project memorandums and. project <br />schedules; and organized offieo technical library, <br />otflee: <br />Irvine, Csiiiomla <br />EXPERIENCE <br />Years of E*perieenco: <br />Mild -Basin Injection; Centennial Park Design. Services, Orange <br />Nine <br />County Water District, Santa Ana, CA. — Design Engineer for <br />four injection Wells lobe located within Centennial Parkin the City <br />years with Tetra Tach: <br />of Santa Ana for Orange Gouty Water District. in addition to the <br />seven <br />engineering eervices,for th'e'four injeotion Wells, the project <br />includes the design OMMe supplyplpel he, bitcklIU M pipeline, <br />bridge crossing, two shared facility.dltes, a monitoring well site, <br />site improvements, and paving of park access roads and parking <br />lots. <br />Welt No. 29 and Elizabeth Reservoir and Booster Pump Station, City of South Gate <br />Design Engineer for the design and construction support for the drilling and equipping of a new <br />2,500 gpm well, :sodium hypochlorite facilities, and generalor at the well site and a 1,8 steel <br />reservoir, booster pump station consisting of three 125 hp pumps/motors at the reservoir site, <br />and about 5,000 feet of water main replacements within the City of South Cate. The project <br />combined the well drilling and well equipping phases of the work together. <br />Well 78 Replacernent, Irvine Ranch Water District, Irvine, CA — Design Engineer for the <br />drilling and equipping of a recycled water well in the City of Irvine. <br />Wall No. 27, City of Orange, Orange, CA --Design Engineer for the drilling and equipping of <br />Well 27, a new potable water well (930 feet deep), The project Involved the partial demolition of <br />an existing warehouse to accommodate the footprint of the new well, installation of a.CMU block <br />control building and sodium hypochlorite building, 12.5% sodium hypochlorite disinfection <br />facility, sound enclosure around the well head back-up generator, as well as, site and <br />landscaping Improvements. <br />Burris Pump Station, Orange County Water District, Anaheim, CA -- Design Engineer for <br />the design of the new Burris Pump Station which consists of four 1,750 horsepower vertical <br />turbine pumps delivering a maximum flow rate of 200 ofs to the Santiago Basins from Burris <br />Basin. Work consisted of reviewing the existing Burris Pump Station Evaluation Report, <br />assisting COCWD with selecting a replacement option, performing final design of the selected <br />option and providing bid and construotion phase services. The project also Included unique <br />designs: 190,000 cubic yards of earthwork to be completed prior to pump station construction, <br />the construction of a 55 -foot diameter by 55 -foot high circular wet well which was computer and <br />physically modeled during design for flow characteristics, and the construction of a 180,000 <br />gallon surge suppression system. <br />Paye 1 <br />25E-201 <br />