TETRATECH Erin Cabatiiero
<br />l ^"1 Well Design
<br />Nis, Cabafiiero has provided design engineering in various water
<br />Mandan.
<br />and wastewater projects including domestic vvatO pipelines, water
<br />B.S., civil Engineering,
<br />main replacements, gravity sower mains, gravity force -main,
<br />university of aalifomia, Irvine,
<br />,pump stations, [fit stations, reinforced concrete reservoirs, steal
<br />2009
<br />tank reservoirs, flo* control facilities, .and pressure reducing valve
<br />Registrations:
<br />vaults: Rosppo Ot101o heve'inciuded: preparation of oonetruoticn
<br />Engineer In Training,
<br />plans, specifications, end design ealoulations; assisted
<br />California, 200a, No. 1,31.89`1
<br />supervisors In preparing project memorandums and. project
<br />schedules; and organized offieo technical library,
<br />otflee:
<br />Irvine, Csiiiomla
<br />EXPERIENCE
<br />Years of E*perieenco:
<br />Mild -Basin Injection; Centennial Park Design. Services, Orange
<br />Nine
<br />County Water District, Santa Ana, CA. — Design Engineer for
<br />four injection Wells lobe located within Centennial Parkin the City
<br />years with Tetra Tach:
<br />of Santa Ana for Orange Gouty Water District. in addition to the
<br />seven
<br />engineering eervices,for th'e'four injeotion Wells, the project
<br />includes the design OMMe supplyplpel he, bitcklIU M pipeline,
<br />bridge crossing, two shared facility.dltes, a monitoring well site,
<br />site improvements, and paving of park access roads and parking
<br />lots.
<br />Welt No. 29 and Elizabeth Reservoir and Booster Pump Station, City of South Gate
<br />Design Engineer for the design and construction support for the drilling and equipping of a new
<br />2,500 gpm well, :sodium hypochlorite facilities, and generalor at the well site and a 1,8 steel
<br />reservoir, booster pump station consisting of three 125 hp pumps/motors at the reservoir site,
<br />and about 5,000 feet of water main replacements within the City of South Cate. The project
<br />combined the well drilling and well equipping phases of the work together.
<br />Well 78 Replacernent, Irvine Ranch Water District, Irvine, CA — Design Engineer for the
<br />drilling and equipping of a recycled water well in the City of Irvine.
<br />Wall No. 27, City of Orange, Orange, CA --Design Engineer for the drilling and equipping of
<br />Well 27, a new potable water well (930 feet deep), The project Involved the partial demolition of
<br />an existing warehouse to accommodate the footprint of the new well, installation of a.CMU block
<br />control building and sodium hypochlorite building, 12.5% sodium hypochlorite disinfection
<br />facility, sound enclosure around the well head back-up generator, as well as, site and
<br />landscaping Improvements.
<br />Burris Pump Station, Orange County Water District, Anaheim, CA -- Design Engineer for
<br />the design of the new Burris Pump Station which consists of four 1,750 horsepower vertical
<br />turbine pumps delivering a maximum flow rate of 200 ofs to the Santiago Basins from Burris
<br />Basin. Work consisted of reviewing the existing Burris Pump Station Evaluation Report,
<br />assisting COCWD with selecting a replacement option, performing final design of the selected
<br />option and providing bid and construotion phase services. The project also Included unique
<br />designs: 190,000 cubic yards of earthwork to be completed prior to pump station construction,
<br />the construction of a 55 -foot diameter by 55 -foot high circular wet well which was computer and
<br />physically modeled during design for flow characteristics, and the construction of a 180,000
<br />gallon surge suppression system.
<br />Paye 1
<br />25E-201
<br />
|