Laserfiche WebLink
N <br />STETRA TECH <br />Erin Cabafiero <br />Wail Design <br />Peters Canyon Channel Water Capture and Reuse Pipeline, Irvine Ranch Water District, <br />Irvine, CA «- Design Engineer for over 17,QPO. linear feet of 10�inch to 1.9 -inch steel and PVC <br />pipeline: This was a joint project with the City of Irvine, City of Tustin, County of Grange, and <br />CAltrans. Project Included three storm strain diversion structures and intake design, hanging the <br />pipailne from taro bridges, bore and jack under the railroad And backpressure -vault. <br />Recycled Water Distribution :system Expansion, EI Toed Water District, Laguna Woods, <br />04- Design Enginoor for the design 0 over 20 miles of recycled water pipelines for the El Toro <br />Water bl9trict's - R6�ycl6d Water Distribution System Expansion project; The pipelines range in <br />size:from 4•1nch to 20LInch in diameter, and convey up to 776 acra4eet of tertiary treated <br />reeyded Water per year.`The major customer Doing served recycled water is the LAgun.A. Woods <br />Village Home Owners Association (formerly Letsuto World). <br />Page 2 <br />25E-202 <br />