|
NTETRATECH
<br />Maxen Kassar, PE
<br />Electricallinstrumentation Lead
<br />iNr, Mazer Kassar hes more than 27 years of experience in
<br />Education:
<br />electrical anglheering and industry standard that include electrical
<br />S.S., Electrical Engineering,
<br />engineering staff management, project management, oonstruotion
<br />C01116fnia'state Uitiverdty, Long
<br />man"ernent and supervision, water and wastewater treatment,
<br />saacn, Logo
<br />petro-chamloal design, and anVIronmental.sail and groundwater.
<br />RogietrationslCertifioations:
<br />treatment, His background includes designing medium and Cow
<br />ProfesslonelMectricai Engineer,
<br />voltage power distribution, designing Instrumentation, control
<br />csiifomla,lgog, No, t.dsota
<br />.systems and SCADA .systems for It wide -variety of projects, and
<br />General Construction, Mass S
<br />the Installation of alectridel systems for remediattori projects,
<br />caiitornia, 2008, No. 77?W
<br />Including soil vapor extraction systems and groundwater pump
<br />and -treat systems, Otherexperianoe.includes, working With utility
<br />Contractor • O-10 Eiecpfeat
<br />California Class 6,specialty
<br />companies to provide new electrical service to now projects,
<br />2000. No. 727648
<br />Working with local Building and Safet .Departments to obtalrf Plan
<br />Check and construction permits, field trouble shooting of electrical
<br />Training and Cartincattohs:
<br />and mechanical systems, system commissioning and startup,
<br />ETAO Eieotricar Power Modeling
<br />problem solving, andmanaging an operation and maintenance
<br />Project Management 1 s it
<br />department, He has: strong knowledge in MS Office and.
<br />Auto CAD 2005
<br />AutoCAD.,
<br />GE and Alien pradley PLC
<br />EXPERIENCE
<br />programming
<br />Mid -Basin Injection: Centennial Park Design Services,
<br />GEflnteliution and Wonderware
<br />SCADA programming
<br />Orange County Water District, Santa Ana, CA — Electrical F
<br />Vapor Mextractlon and
<br />responsible for the design of four Injection wells to be located
<br />Groundwater Treatment
<br />Within Centenniai Park in the City of Santa Ana for Orange County
<br />Water District, In addition to the engineering services for the four
<br />OSHA a -hour Hazardous Waste
<br />operations Annual Refresher
<br />Injection wells, the project includes the design of the supply
<br />Training, 2016
<br />pipeline, backfiush pipeline, bridge crossing, two shared facility
<br />sites, a monitoring well site, site improvements,, and paving of
<br />OSHA 11 -hour Hazardous Waste
<br />park access roads and parking lots,
<br />Operations Site Supervisor
<br />Training, 1992
<br />Lakewood Plant 13 Project; Lakewood, CA — Managing the
<br />OSHA 4D -hour Hazardous
<br />electrical design for Plant 13 pump station upgrade. The design
<br />Waste operations Training,
<br />consists of replacing the plant old MCC with new outdoor NEMA
<br />is
<br />3R MCC, installing new conduits and wires to the new pumps,
<br />Professional Affiliations:
<br />and reinstalling the existing control and telemetry system, This
<br />Institute of Electrical and
<br />replacement upgrade requires Interfacing with Southern California
<br />Electronics Engineers IEEE
<br />Edison (SCE) and relocating the existing ATS.
<br />Well 27 Equipping Plan, City of Orange, orange, CA —
<br />Office:
<br />Irvine, California
<br />Electrical Project Manager for the preparation of the plans,
<br />specifications and cost estimate for the equipping of a potable
<br />Years of Experience:
<br />water well. As part of the well equipping a generator room was
<br />27
<br />Installed for backup power,
<br />Years with Tetra Tech:
<br />Lakewood Well No. 22 Project; Lakewood, CA — Managing the
<br />eight
<br />electrical design for well no. 22 pump upgrade. The design
<br />consists of replacing. the old well pump VFD with now one and
<br />rewiring the new well pump.
<br />Page 1
<br />25E-207
<br />
|