Laserfiche WebLink
» We will design the project in accordance with your schedule. This begins with development of a detailed schedule that includes critical <br />path, agency review times, and milestones. Progress will be reviewed during our design meetings. <br />» We will design a project that Is within your budget. We will develop a project budget that includes contingency, probable construction cost, <br />and consultant fees. The probable construction cost will be prepared using current unit prices and submitted for review. <br />u We strive to minimize non -client initiated change orders during construction. Our QA/QC procedure implements a constructability <br />reviewer. it helps us foresee and resolve potential issues before the bidding phase. <br />Our PM will establish the framework and ensure that we capture your expectations for quality prior to publishing our plan. <br />Existing Utility inventory- Every project presents its own special design challenges. The most frequent challenge related to existing utilities <br />we would expect in the City of Santa Ana. is that improvement to utilities located in developed areas will generally affect or be affected by other <br />utilities. Through experience we have learned that existing records may be non-existent, inaccurate, or lack information. This is why all projects <br />require an effective existing utility locating approach. A precise utility inventory will: <br />» Equal a high quality design » Promote public safety <br />» Avold conflicts during construction Avoid construction change orders <br />» Prevent utility interruptions » Prevent construction delays <br />With HZ, utilities will be located, verified, and compiled Into a VIN CAOD file using a "Four Tier Approach." <br />Enviranmentat Assessment— Our assumption for both project options is that the work limits are within areas with existing infrastructure. Small <br />improvements of this nature typically quality for environmental exclusions but if the work requires a negative declaration. Our first stop would be to . r <br />- — research existing environmental filing(s). There-afterour consultant and civil team would assist the City of SantaAna withsupportingstudies and <br />documentation to comply with CEQA and/or NEPA. We have assumed exclusions have been filed for both options A and B, t <br />Topography- HZ Is leading the industry with fixed wing aerial drone surveying. The new technology has a perfect platform in topography. With ` <br />on board RTK the data will generate an accuracy that matches conventional aerial photography but a picture quality that is unmatched. It allows <br />for quicker delivery and data control at a competitive fee. The data would be supplemented with a field survey(s) and tied to the most appropriate <br />datum. HZ will acquire necessary permits to perform aerial surveys via drones. Our survey department would also provide legal descriptions, if 1 <br />required, Providing plans, specifications, and estimates (PS&E) for engineering projects Is the backbone of our Irvine branch. We familiar with <br />local, state, and federal codes and regulations. This ensures that the design is in conformance with established guidelines. We are also experience <br />with preparation of special provisions. We have been serving Southern California for over 30 years this includes projects with the City of Santa Ana. <br />We are familiar with the City's criteria for acceptance of plans, <br />Encroachment—Potential encroachments would be identified in the proposal stage. The work to coordinate, design, provide temporary easements, <br />etc. would be included in the fee proposal. Our goal during design is to make every attempt possible to avoid impact to adjacent properties but it <br />is not always possible. With options A and B we have assumed that all work will fall within City controlled property and that encroachment is not <br />necessary. <br />WaterWeff Expertise — Our proposed project team has a history of successfully delivering water well design services. Our Bakersfield National <br />Cemetery Project constructed a waterweli for domestic and Irrigation use. Our proposed PM, Mr. Hernandez, rehabilitated several water wells that <br />were used for construction <br />Twaatteer. The same water wells were later used to feed a cooling system for the Mojave Solar Project. <br />HUITfZOGI�1ItS City of Santa Ana Civil Engineering Services: RFP 17-083 g <br />25E-232 <br />