My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We will design the project in accordance with your schedule. This begins with development of a detailed schedule that Includes critical <br />path, agency review times, and milestones. Progress will be reviewed during our design meetings. <br />We will design a project that Is within your budget. We will develop a project budget that includes contingency, probable construction cost, <br />and consultant fees. The probable construction cost will be prepared using current unit prices and submitted for review. <br />We strive to minimize non -client Initiated change orders during construction. Our QA/QC procedure implements a constractability <br />reviewer.. It helps us foresee and resolve potential issues before the bidding phase. <br />Our PM will establish the framework and ensure that we capture your expectations for quality prior to publishing our plan. <br />Fxlstingllfllity laventory- Every project presents its own special design challenges. The most frequent challenge related to existing utilities <br />we would expect in the City of Santa Ana. is that improvement to utilities located in developed areas will generally affect or be affected by other <br />utilities. Through experience we have learned that existing records may non-existent, inaccurate, or tack information. This is why all projects <br />require an effective existing utility locating approach. A precise utility inventory will <br />D Equal a high quality design a Promote public safety <br />)> Avoid conflicts during construction u Avoid Construction change orders <br />+> Prevent utility Interruptions » Prevent construction delays <br />utilities will be located, verified, and compiled Into a Vial CAOD file using a "Four Tier Approach," <br />Environmental Assessment— Our assumption for both project options is that the work limits are within areas with existing infrastructure. Small <br />improvements of this nature typically qualify for environmental exclusions but if the work requires a negative declaration. Our first stop would be to <br />research existing onvlronmental filing(s). Thereafter our consultant and civil team would assist the City of Santa Ana with supporting studies and <br />documentation to comply with CEQA mrd/or NEPA. We have assumed exclusions have been filed for both options A and B. <br />topography - HZ is leading the industry with fixed wing aerial drone surveying. The now technology has a perfect platform in topography. With <br />on board RTK the data will generate an accuracy that matches conventional aerial photography but a picture quality that Is unmatched. it allows <br />for quicker delivery and data control at a competitive fee. The data would be supplemented with a field survey(s) and tied to the most appropriate <br />datum. HZ will acquire necessary permits to perform aerial surveys via drones. Our survey department would also provide legal descriptions, if <br />required. Providing plans, specifications, and estimates (PS&E) for engineering projects is the backbone of our Irvine branch, We are familiar with <br />local, state, and federal codes and regulations. This ensures that the design is In conformance with established guidelines. We are also experience <br />with preparation of special provisions. We have been serving Southern California for over 30 years this includes projects with the City of Santa Ana. <br />We are familiar with the City's criteria for acceptance of plans. <br />Encroachment—Potential encroachments would he identified in the proposal stage. The work to coordinate, design, provide temporary easements, <br />etc. would be included in the fee proposal. Our goal during design is to make every attempt possible to avoid impact to adjacent properties but it <br />is not always possible. With options A and B we have assumed that all work will fall within City controlled property and that encroachment is not <br />necessary. <br />Water Well Expertise — Our proposed project team has a history of successfully delivering water well design services. Our Bakersfield National <br />Cemetery Project constructed a water well for domestic and Irrigation use. Our proposed PM, Mr. Hernandez, rehabilitated several water wells that <br />were used for construction water. The same water wells were later used to feed a cooling system for the Mojave Solar Project. <br />HUI 11'ZOLM City of Santa Ana Civil Engineering Services: RFP 17-083 8 <br />25E-278 <br />X" <br />a.,i <br />I <br />e ,k <br />
The URL can be used to link to this page
Your browser does not support the video tag.