My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 8., Street Improvement Plans (Option B) <br />....., .,....... ........ ....... .....,. <br />Klmley,Hom will develop a street Improvement pion for the construction of roadway improvements. The plans will show <br />horizontal and vertical design Infprmatlon, Roadway plans will by prepared at a:scalo of 1" R 211' horizontel:and f" r- 4' <br />vertical for profiles. We will use the surveying from Task for base mapping, Vertical design information for construction of <br />now medians and curbs will be Indicated on the plans with profiles, Details and typical sections will be added as needed. <br />We Wit prepare details for items that deviate from published stehdards, <br />Deltvambiea:30%, 60%, and r4nat Plans, electronic files In Mlomstation V81 and PDF (final plans will be sealed and <br />sfgnodl, and tosponses topro vious tovie w commonts from the My. <br />Task 9 Sy Modeling to Connect Well ai�ectly to Water System (Option A) <br />... ,...... .. . ... ., ... .. ....,.. <br />A hydraulic modeling analysis will be conducted to anal yza:the changed operating conditions fMrn the existing. direct <br />disohargp.to a reservoir, to a direct connection to the City's distribution system. Avow system curve will be developed <br />and analyzed with the existing well pumpcurve to determine the new operating conditions of the pump, along with. any <br />Improvements necessary for the new connection point, The model will also be used to analyze Impacts to other system <br />feclilles within the City's distribution system, and recommend a revised operations and Centel strategy. <br />Deliversbles: Draft water system modeling report, Motivator system modeling report <br />Task 10: Water Improvement Plans (Option A) <br />Kimlay Horn will develop a wakar improvoment pian for rehabliRatio n of the existing watt well and proposed water <br />mains construction, The plans will, show horizontal and vertical design Information. Plans will be prepared at a scale <br />of 1" a 20' horizontal and 1" a 4' varticoi for profiles. We will use the surveying from Task 4 for base mapping, Vertical <br />design Information for grater hraln wiltshow proposed water main.proflla and will ldentifypotentlaloonflicts with existing <br />underground utilities. Details and typical sections will be added as needed. We will prepare details for items that deviate <br />from published standards. <br />Dallyerabies: Moo, 6W6, and Final Plans, electronic files In Wrostallon V81 and PDF (final plans will be sealed and <br />signed), and responses to previous review comments from the City <br />Task 11: Signing and Striping Plans (Options A and B) <br />Waw411 prepare striping and signing plans at a scale of 1" r 44' for the propasod improvements wikhimthe limits of the <br />project. Striping and signing plans will comply with the City's.sterrdards, Caltrans, and the California MUTCD, flashing <br />beacon installation and parking meter details, If required, will be shown on the striping and signing plans, <br />Dollverobtes: 30%, 60916, and Final Plans, electronic files in Microstation V81 and PDF (final plans will be sealed and <br />signed), and responses to previous review comments from the City. <br />Task 12: Landscape and hrigation Plans (Option B) <br />Tha KimleyHorn team will prapar'e landsoapa and irrigation plans for the proposed medians and parkways wtthln the <br />project limits. These plans will be consistent with the City's Standards and General Plan, the City's Scenic Corridor <br />Elements, the City's Urban Design Elements, and California's Water Efficient Landscape Ordinance. We will consider City <br />maintenance when developing the design. Landscape and Irrigation plans will be prepared at a scale of 1"= 20' horizontal. <br />Deliverables: 30°x6, 60%, and Final Plans, electroritc files in Mlcrostatfon V81 and PDF (final plans will be seated and <br />signed), and responses to previous review comments from the City. <br />City otsentaandi m007702E.17 17 Kit11ley)))Horn <br />25E-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.