Laserfiche WebLink
Task 17: Opinion of Probable Construction Cost (Options A and B) <br />... .... ....:... ........_................ .,....... ................... .......... ...,........... ......... ...,........ ,.......,...,........ <br />................,........... <br />Kimley-Horn will prepare an Opinion of Probable Construction Costs (Estimate) based on quantities,for comparison to <br />project budget and assist during the Contractor's bidding process. Unit prices will be derived from readily available current <br />bid Information based on similar projects within the area. Backup will be generated for lump sum Items. Contingencies will <br />be shown, as agreed upon with City staff. r <br />Deliverables: 30%, 60, and Final Estimates, electronic files In PDI: <br />Kimsey* Horn is rnacrrazs.rri GUY utSputa Ann <br />25E-33 <br />Task 13: Storm Drain Plans TOTPJ <br />We will ptepara storm drain plans ahowing proposed catch basins' andleleral connections to the existing main lines, <br />@ <br />Catch basin sizing, inlet: dimensions, and laterals pipe sixes wilf be determined as, part of Task d. Potential conflicts with <br />existing utilities will be shown on profiles with approximate location of utilities, per the utility agencies readily available <br />record drawings. Storm drain plans will he prepared at a scale of 1" = 20' horizontal and t" = A' verbal for profiles. <br />' �+ <br />DeBvsrobles: x0'16, 60%, and Final Plans, aloctronlc.flfes. n Mlorostation V81 and PDP (final plans will ba sealed and <br />signed), and responses to previous review comments from the City. <br />Task 14: Street Light and Electrical Alms (Option k3) <br />... <br />Kimlay Hom wippreparestroet Ilght"pians foe tha pmjeot, Plans wlIf incorporate street lighting along both sides of the <br />f <br />street. We will conduct voltage drop calculations tb.determine the wiring sixes, Part of this task wilt include coordination <br />Cr <br />with Southern California Olson to, determine new and existing service polms, We will provide a photemetrle.analysls to <br />determine requiredillumination for this corridor <br />0 <br />Deliverables: 30%, e0%, and Final Plans, electronic files in Microstatlon V81 and PDF (final plans will be sealed and <br />( ) <br />signed), and responses to previous review comments from the Clty, <br />t <br />Task 1 & TraMic Signal Plans (Opti'on B) . <br />t t <br />We will prepare traffics(gnai plans ko incorporate 1ha naw Improvements along project area. Installation of closed aroult <br />television (CCTV), video detection, conduits, and cables or modification of existing communication systems is anticipated <br />within the project,limits and will be shown on thetraffic signal plans. Plans will show the connection to each signalized <br />C; f <br />Intersection within the project limits. Pull box details and modification of conduit sweeps for the signal Interconnect are <br />$ (a <br />included. The traffic signal modification plan will be prepared in accordance with current City and Caltrans standards and <br />r <br />will be prepared at a scale of 1" = 20', <br />Dollverables: 30%, 60%, and Final Plans, electronic files in Microstation V81 and POF (final plans will be sealed and <br />slgned), and responses to previous review comments from the City. <br />( ' <br />Task 16: Specificatlons (Options A and t3) .................................................................................... <br />>' <br />Kiml®y-He rn wtlI prepare technical spedficatlons based upon the boiler plate supplied by the City. Bid items will be <br />f, <br />described as reasonably required in the General Provisions and will be included in the Contractor's bid list. References for <br />& <br />the technical provisions to the City's Standards and Standard Speclficaflons for Public Works Construction (Greenbook), <br />Coltrane, or other appropriate specifications will be shown. <br />Dollvorablasr.30%, 601, and Final specifications, electronlo files In PDF and word format (final specifications will be <br />_ <br />sealed and signed), and responses to previous review comments from the City. <br />Task 17: Opinion of Probable Construction Cost (Options A and B) <br />... .... ....:... ........_................ .,....... ................... .......... ...,........... ......... ...,........ ,.......,...,........ <br />................,........... <br />Kimley-Horn will prepare an Opinion of Probable Construction Costs (Estimate) based on quantities,for comparison to <br />project budget and assist during the Contractor's bidding process. Unit prices will be derived from readily available current <br />bid Information based on similar projects within the area. Backup will be generated for lump sum Items. Contingencies will <br />be shown, as agreed upon with City staff. r <br />Deliverables: 30%, 60, and Final Estimates, electronic files In PDI: <br />Kimsey* Horn is rnacrrazs.rri GUY utSputa Ann <br />25E-33 <br />