Task 17: Opinion of Probable Construction Cost (Options A and B)
<br />... .... ....:... ........_................ .,....... ................... .......... ...,........... ......... ...,........ ,.......,...,........
<br />................,...........
<br />Kimley-Horn will prepare an Opinion of Probable Construction Costs (Estimate) based on quantities,for comparison to
<br />project budget and assist during the Contractor's bidding process. Unit prices will be derived from readily available current
<br />bid Information based on similar projects within the area. Backup will be generated for lump sum Items. Contingencies will
<br />be shown, as agreed upon with City staff. r
<br />Deliverables: 30%, 60, and Final Estimates, electronic files In PDI:
<br />Kimsey* Horn is rnacrrazs.rri GUY utSputa Ann
<br />25E-33
<br />Task 13: Storm Drain Plans TOTPJ
<br />We will ptepara storm drain plans ahowing proposed catch basins' andleleral connections to the existing main lines,
<br />@
<br />Catch basin sizing, inlet: dimensions, and laterals pipe sixes wilf be determined as, part of Task d. Potential conflicts with
<br />existing utilities will be shown on profiles with approximate location of utilities, per the utility agencies readily available
<br />record drawings. Storm drain plans will he prepared at a scale of 1" = 20' horizontal and t" = A' verbal for profiles.
<br />' �+
<br />DeBvsrobles: x0'16, 60%, and Final Plans, aloctronlc.flfes. n Mlorostation V81 and PDP (final plans will ba sealed and
<br />signed), and responses to previous review comments from the City.
<br />Task 14: Street Light and Electrical Alms (Option k3)
<br />...
<br />Kimlay Hom wippreparestroet Ilght"pians foe tha pmjeot, Plans wlIf incorporate street lighting along both sides of the
<br />f
<br />street. We will conduct voltage drop calculations tb.determine the wiring sixes, Part of this task wilt include coordination
<br />Cr
<br />with Southern California Olson to, determine new and existing service polms, We will provide a photemetrle.analysls to
<br />determine requiredillumination for this corridor
<br />0
<br />Deliverables: 30%, e0%, and Final Plans, electronic files in Microstatlon V81 and PDF (final plans will be sealed and
<br />( )
<br />signed), and responses to previous review comments from the Clty,
<br />t
<br />Task 1 & TraMic Signal Plans (Opti'on B) .
<br />t t
<br />We will prepare traffics(gnai plans ko incorporate 1ha naw Improvements along project area. Installation of closed aroult
<br />television (CCTV), video detection, conduits, and cables or modification of existing communication systems is anticipated
<br />within the project,limits and will be shown on thetraffic signal plans. Plans will show the connection to each signalized
<br />C; f
<br />Intersection within the project limits. Pull box details and modification of conduit sweeps for the signal Interconnect are
<br />$ (a
<br />included. The traffic signal modification plan will be prepared in accordance with current City and Caltrans standards and
<br />r
<br />will be prepared at a scale of 1" = 20',
<br />Dollverables: 30%, 60%, and Final Plans, electronic files in Microstation V81 and POF (final plans will be sealed and
<br />slgned), and responses to previous review comments from the City.
<br />( '
<br />Task 16: Specificatlons (Options A and t3) ....................................................................................
<br />>'
<br />Kiml®y-He rn wtlI prepare technical spedficatlons based upon the boiler plate supplied by the City. Bid items will be
<br />f,
<br />described as reasonably required in the General Provisions and will be included in the Contractor's bid list. References for
<br />&
<br />the technical provisions to the City's Standards and Standard Speclficaflons for Public Works Construction (Greenbook),
<br />Coltrane, or other appropriate specifications will be shown.
<br />Dollvorablasr.30%, 601, and Final specifications, electronlo files In PDF and word format (final specifications will be
<br />_
<br />sealed and signed), and responses to previous review comments from the City.
<br />Task 17: Opinion of Probable Construction Cost (Options A and B)
<br />... .... ....:... ........_................ .,....... ................... .......... ...,........... ......... ...,........ ,.......,...,........
<br />................,...........
<br />Kimley-Horn will prepare an Opinion of Probable Construction Costs (Estimate) based on quantities,for comparison to
<br />project budget and assist during the Contractor's bidding process. Unit prices will be derived from readily available current
<br />bid Information based on similar projects within the area. Backup will be generated for lump sum Items. Contingencies will
<br />be shown, as agreed upon with City staff. r
<br />Deliverables: 30%, 60, and Final Estimates, electronic files In PDI:
<br />Kimsey* Horn is rnacrrazs.rri GUY utSputa Ann
<br />25E-33