Laserfiche WebLink
Michael <br />Fisher CS <br />PE,QSa/P <br />Prinolpal Engineer ooNsuMAWS <br />LICENSES and <br />Mr. Fisher Is a civil engineer with over 25 years of experience in civjllroadway design, <br />CERTIFICATIONS <br />drainage design, trafficenginaefte, sp'eci€ication writing, engineering report writing and <br />w0esslai OW EdliW <br />project management, He has managed teams of engineers, working to deliver over a <br />$tate tf elbma <br />dozen projects ranging in size from MAW to $22,O00,000 with project status ranging <br />[ 136130 <br />from project Initiation/feaslbility/studyphase toapproval/environmentalphasetofinai <br />MVP gevabperlPrecRikmr <br />design and construction. Mr. Fisher: has extensive experience working on roadway design, <br />j i&eff <br />including intersection and median projeois, His design wor( Includes horizontal and <br />vertical geometric layout titflity coordination, traffic signal design, signing and Striping <br />EDUCATION <br />design and drainage design. His projects have incorporated current LID design practice's <br />1136410r of Nance, OVii II111Iaetdsl, <br />Including biofiltrAition, infiitfation, and detention basins, <br />Its lose Iute univeniq <br />lies jere,:(A <br />RELEVANT EXPERIENCE <br />PROFESSIONAL <br />Sunnyvale Pavement Rehabilitation 2011[City of .Sunnyvale, CA <br />AFFILIATIONS <br />Mr. Fisher served its the Project Manager fat this ormualstraatpavement rehettilitation <br />South Illy Hanspottados We" Aaedatian <br />project. The scope Involved the rehabilitation of 2 streets in the City of bunnyvale. work <br />jIRTOA1 fast Ptesideal <br />included the, design of grind and HMA overlay, digotits; utiAtyadjustmen% curb remps, <br />Touan Laos latmational <br />concrete sidewalk, curb, gutter and driveway replacement, and striping. plans, <br />Oobiilown <br />Felr'CialksmkewayondStreetscopeI City of Sunnyvale, CA <br />Mr. Fisherserved as the Aroject'Manager for the design of Crass 2 Bicycle Ganes on Fair <br />OaksAvenue between Old San Francisco Read to Evelyn Road; Klfer Avenue to Arques <br />Avenue, and Woife Road to Ahwanee Avenue, Key project elements included <br />recoofiguringth'e roadway, roadway resurfacing, additlon,ofgreen blkalanes, <br />modifications to-the existing concrete median islands, modification ofparking, and <br />installation of related signage. Mr. fisher led public outreach meatings to keep the <br />residents lnformed ofthe praject. <br />First Street ahclCityAiley Resurfacing Project: [ City of Los Altos,CA <br />Mr. Fisher served as the Project Manager for these two resurfacing projects, which <br />Involve rehabilitation of 20 city alleyways as well as First Street between West With <br />Avenue and State Street, He oversaw preparation of the project PS&E package, Oasis of <br />Design Report, and coordinated with utility owners for adjustments of their facilities. <br />JurelperoSerra atKing Boulevard Intersection Improvements [City of South San <br />Francisco, CA <br />Mr. fisher served as the Project Manager for this bicycle and pedestrian friendly traffic <br />signal upgrade project, the project goal was to improve mobility for all modes, and brings <br />the intersectionupto current standards for bicyclists, pedestrians, And ADA access: <br />Project Included preliminary design, community outreach, agency coordination Including <br />Caltrans. The project scope included redesign of the existing medians and right -turn <br />Islands to Improve Intersection geometry and provide ADA compliance, replacement of <br />the existing traffic signals located inthe median with mast arm signals to improve <br />visibility, addition of a speed feedback sign on southbound iunlpero Serra, and extension <br />of existing bike lanes along Junipero Serra Boulevard through the King Drive intersection <br />to improve bicycle safety. <br />W. Edith and University Crosswalk improvements I City of Los Altos, CA <br />Mr. fisher served as the Project Manager for the design of traffic calmingelements to <br />allow for safe visible crossing of'Edith Avenue, The design also included the installation of <br />crosswalk sign; and in -ground warning lights, <br />25E-359 <br />