|
Michael
<br />Fisher CS
<br />PE,QSa/P
<br />Prinolpal Engineer ooNsuMAWS
<br />LICENSES and
<br />Mr. Fisher Is a civil engineer with over 25 years of experience in civjllroadway design,
<br />CERTIFICATIONS
<br />drainage design, trafficenginaefte, sp'eciā¬ication writing, engineering report writing and
<br />w0esslai OW EdliW
<br />project management, He has managed teams of engineers, working to deliver over a
<br />$tate tf elbma
<br />dozen projects ranging in size from MAW to $22,O00,000 with project status ranging
<br />[ 136130
<br />from project Initiation/feaslbility/studyphase toapproval/environmentalphasetofinai
<br />MVP gevabperlPrecRikmr
<br />design and construction. Mr. Fisher: has extensive experience working on roadway design,
<br />j i&eff
<br />including intersection and median projeois, His design wor( Includes horizontal and
<br />vertical geometric layout titflity coordination, traffic signal design, signing and Striping
<br />EDUCATION
<br />design and drainage design. His projects have incorporated current LID design practice's
<br />1136410r of Nance, OVii II111Iaetdsl,
<br />Including biofiltrAition, infiitfation, and detention basins,
<br />Its lose Iute univeniq
<br />lies jere,:(A
<br />RELEVANT EXPERIENCE
<br />PROFESSIONAL
<br />Sunnyvale Pavement Rehabilitation 2011[City of .Sunnyvale, CA
<br />AFFILIATIONS
<br />Mr. Fisher served its the Project Manager fat this ormualstraatpavement rehettilitation
<br />South Illy Hanspottados We" Aaedatian
<br />project. The scope Involved the rehabilitation of 2 streets in the City of bunnyvale. work
<br />jIRTOA1 fast Ptesideal
<br />included the, design of grind and HMA overlay, digotits; utiAtyadjustmen% curb remps,
<br />Touan Laos latmational
<br />concrete sidewalk, curb, gutter and driveway replacement, and striping. plans,
<br />Oobiilown
<br />Felr'CialksmkewayondStreetscopeI City of Sunnyvale, CA
<br />Mr. Fisherserved as the Aroject'Manager for the design of Crass 2 Bicycle Ganes on Fair
<br />OaksAvenue between Old San Francisco Read to Evelyn Road; Klfer Avenue to Arques
<br />Avenue, and Woife Road to Ahwanee Avenue, Key project elements included
<br />recoofiguringth'e roadway, roadway resurfacing, additlon,ofgreen blkalanes,
<br />modifications to-the existing concrete median islands, modification ofparking, and
<br />installation of related signage. Mr. fisher led public outreach meatings to keep the
<br />residents lnformed ofthe praject.
<br />First Street ahclCityAiley Resurfacing Project: [ City of Los Altos,CA
<br />Mr. Fisher served as the Project Manager for these two resurfacing projects, which
<br />Involve rehabilitation of 20 city alleyways as well as First Street between West With
<br />Avenue and State Street, He oversaw preparation of the project PS&E package, Oasis of
<br />Design Report, and coordinated with utility owners for adjustments of their facilities.
<br />JurelperoSerra atKing Boulevard Intersection Improvements [City of South San
<br />Francisco, CA
<br />Mr. fisher served as the Project Manager for this bicycle and pedestrian friendly traffic
<br />signal upgrade project, the project goal was to improve mobility for all modes, and brings
<br />the intersectionupto current standards for bicyclists, pedestrians, And ADA access:
<br />Project Included preliminary design, community outreach, agency coordination Including
<br />Caltrans. The project scope included redesign of the existing medians and right -turn
<br />Islands to Improve Intersection geometry and provide ADA compliance, replacement of
<br />the existing traffic signals located inthe median with mast arm signals to improve
<br />visibility, addition of a speed feedback sign on southbound iunlpero Serra, and extension
<br />of existing bike lanes along Junipero Serra Boulevard through the King Drive intersection
<br />to improve bicycle safety.
<br />W. Edith and University Crosswalk improvements I City of Los Altos, CA
<br />Mr. fisher served as the Project Manager for the design of traffic calmingelements to
<br />allow for safe visible crossing of'Edith Avenue, The design also included the installation of
<br />crosswalk sign; and in -ground warning lights,
<br />25E-359
<br />
|