Laserfiche WebLink
CONTACTINFO <br />CHARLIE McKINLEY, PE <br />Whereto:mnWnley�nv5;Com . <br />SAf�.66O47i <br />Project Manager <br />EXPERIENCE <br />Mr: McKinley has more than 30 ye4f$ of experience as a Professional engrpear for <br />36years <br />both larg"CSIO Capital ImprOVOMent projects and small infrastructure improvement <br />EDUCATION <br />PwJects. He has a broad range of project experience with a focus on pipeline$, pump <br />0.1010rriedlcal. <br />stations; reservoiirs, and trestmem Mr. McKinley brings' an enthUslastio approach to <br />:Engineering <br />planning, regulatory permitting, detailed design and operations review to facilitate civil <br />and environmental engineering projeots, <br />OivilEngFhoer:(CA) <br />Rio. <br />Projeot Eifperience <br />038484 <br />AFFILIATIONS <br />...... ............... ._..._. <br />Coronlado.Gays.Sawage Lift Station <br />Member,-Soard of <br />CITYbF:CORONADO l CORONADO, CA <br />t)fractnrs, 9apiety <br />Task Leader. Mr. MnKtnley was the-taakfeader for the design of a Complete overhaul <br />Of American Mii tery. <br />of an 670 gpm submersible pump station. Pumps, controls; wetwell Configuration; and <br />Engineers, Orange CounW <br />post <br />various facility 010miants were replaced with current toohriologyas, part of the projact, <br />Member, American Puypg <br />Back Basin storm Water Pump Station <br />Works. Association <br />ELISI.NOREVALLEY MUNIUpALWAYERI>ISTRiOTILAKE ELSINORE,CA <br />Project Malinger. This project consisted of the I)MIMlnary and finaf design of a 2,600 <br />Inland Empire Chapter <br />President, Wotekeu" <br />gpm stommater pump station to accommodate the evacuation of stormwaterfrom ilia <br />hack basin wetlands duringafl ovadtoiveVontfrom Lake Elsinore <br />Association <br />Mountain Bails Pump Station and Water Main <br />• <br />V15fA IRRIGATION DISTRICT i VISTA. CA <br />ProJaot Engineer. As prajeat anglneer, Mr.. McKinley was responsible for the design <br />of an Interzone transmission main. Challenging terrain alignments and steep slope <br />installations were evaluated, as well as surge and hydraulics. <br />Fullerton Road Grade Separation Stormwater and Groundwater Pump <br />Stations <br />ROWLAND WATER DISTRICT I INDUSTRY, CA <br />Project Manager. Responsible for the design of a 20,500 gpm atormwater pump <br />station and a 200 gpm groundwater pump station inrthe depression of Fullerton Road <br />under UPRR railroad trooks. The project Included a hydraulic analyses of storm and <br />groundwater inflow conditions to. match with outflow hydrpgraphs, and mechanical, <br />electrical, and structural design. Main pump station was permitted by tha.LACDEW. <br />Dudley Sewer Cornmisslon Consulting <br />TOWN OF DUDLEY I DUDLEY, MA <br />Project Manager. Development of design plans and specifications for three separate <br />sewer extension projects Involving approximotaly 18,000 fleet of gravity sewer, 7,000 <br />feet of force main, and four duplex submersible pump stations with emarganoy power, <br />odor control, and several low-pressure service areas with individual grinder pumps and <br />diameter <br />small force mains. Also completed a town -wide Comprehensive Wastewater <br />Management pian, Including obtaining State Revolving Fund loans and performance of <br />NIV 15 <br />hydraulic modeling ofthe sewer system, as well as an on-site system survey, <br />25E-464 <br />