Laserfiche WebLink
Sewer Rehabilitation and Reconstruction Study <br />CRY OF COMPT"ON I COMPTON, CA <br />project Eagtneer, work consisted of hydraulic an physical eVOluatlons.Of the City s major sewerstapprct iprstely #6000 <br />feet cf8 to'17iha1aptpa),TfreobjeotiVe'waste.eValuatesagmantsfarraplacemalt repair: orrehabllftatlan(liningj:Sower <br />' CCTV data was reviewed, andlotarvtows. were conducted with operatlong end maintenance personal. Spreadsheets were <br />developed to prioritize the Improvements for a multiyear program, finally, apintons.of probable oosw warp: provided, and, <br />the work was:presemed In a Project Study Report. <br />Wastewater Cotiecilon Syste n Upgrade Program <br />CITY OF TORRANCE I TORRANCE,.CA <br />Project Mar pgor: work cons6,Wd of the completion :of seueral projects to' upgrade the City's sewereystelh. The program <br />Included sewer rehabilitation initiated bya syatam-.wide video program,. preparation Of sewer MAlaoiarhent and extension <br />designs, and development of a cpnrspt design for alley sawars: A grease control ordinance was also developed fprths Glty <br />Code. <br />' Fillmore Server interceptors <br />CITY OF FI4MDRE I FILLIVORE, CA <br />Project MOnaor. Mr. McKinley was responsible for the' conceptual ddslgn of new sewarintetcaptomto route all flow to. a <br />new w0a*Water treatment plant site. associate <br />ateo:desligned as part of this prpjest, d.dfveYsfan'faaihtfesand roadway fnfrastruaWre for the new aliment were <br />Mentor e, Botrlevard Sower <br />CITY OF�R€DLANDS i REDLANDS; CA <br />Project Manager. As project fnenager, Mr. MoRinleylead the Planning tend design of a sewer extension on Menton <br />Boulevard (SW38), which Is a majoreacess mute to ArrowheSd/eig Boar utility coordination and traffic control were key <br />challenges addressed. As a separate project, he also completed the design of 5,000 feet of sewer exterasfon. Projaat <br />i Components included. the Sewer Master Wan Update, Prelitnlnary Design Report, and.pians, specifications, and estimates. <br />Buahard Trunk Sewer <br />GRANGE OOUNTYSANITATION DISTRICT I FOUNTAIN VALLEY, CA <br />Projeot.Manager, Work consisted of the design and construction management Ofreplacingthe existing 54-inah pipeline <br />with approximately 27,000 LF of new 108 -Inch concrete•relnforoed pipe. The project included geatechnical and structural <br />pipe design, and coordination with involved cities for traffics control. <br />University of Connecticut WWTP Upgrade and Sewer System recliitles Plan <br />UNIVERSITY OF CONNECTICUT I SM. RRS, CT <br />Project Engineer, Compiation of a sewer system evaluation survey to Identify reaches with excessive inflow end infiltration <br />In the University collection system. An analysis of flaws at the treatment plant was completed, as well as a projection of <br />future flows within the study period. A treatment plant upgrade conceptual plan was also dsveloped, <br />Lakewood Boulevard Recycled Water Pipoilne <br />CITY OF DCi"tNEY 1 DOWNEY, CA <br />Project Manager. Installation of a recycled water main, potable water meter adjustments, and other miscellaneous utility <br />relocations and adjustments associated with the design and construction Of street improvements and enhancements <br />along Lakewood Boulevard from Florence Avenue to Telegraph Road, Project was divided Into two segments: Lakewood <br />Boulevard between Florence Avenue and Gallatin Road (2,800 feet), and Lakewood Boulevard between Galtadn Road and <br />Telegraph Road (2,900 feet). <br />25E-465 <br />