My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />CONTACT INFO <br />DEREK wIESKEr PE <br />derek.wleskeonvra,com <br />ggg;ggg orl•Ty <br />Quality Assurpnce/Quality Control <br />_ <br />EXPERIENCE <br />E•J.^.Mf•`n!nUMerrs w,etw.,.,w,.e.ru.rw.r......a.a..a...:ua»w.wlaficu.+ivrM.a.:::.,...•,.Ma.+rvn...q....... .....na.w....n�.nv...a:..;roa• <br />Mr,Wieskehas.morethan25years 00400..ane*peoencsin.the .development, <br />2ye�rs <br />design and construction of capital fmprovenreht prgieots.for public agencies. His <br />EDUCATION <br />vast catalog of proJeetslnciudes roadway's and pedestrian improvements; parks and <br />M fZ.A. <br />landscaping, water and sewer infrastructure, and buildings. MG Wleske, has served in a <br />varlety Of ries from City Engineer to Director of public Warks far agancies throughout <br />MA. 0101 Engineering <br />Southern California including the oldes of Long Beach, Laguna Beach, and Lake Forest <br />LICENSI�s <br />I - ` Civil Engihoer{CA) <br />I tVa.49B�2. <br />i I <br />AFFILIATIONS <br />Member, AnredcanSooisty <br />of clvll;Engineers <br />Member (138951994), <br />StandansSetting' <br />OotnmHtsefottho <br />` ' Califonifa Stata,Boatd <br />of itegfstratlon4ar. <br />Prolasslanal Et,ginobrs <br />I <br />and Land surveyors <br />Member (2002), <br />Countrywido Navy <br />Developmontand <br />Construction Water quality <br />Task Force <br />Project Experience <br />... _........... _....... ».................. _... <br />..» <br />Downtown Area Resurfacing <br />CITY Or LAGUNA BEACH I LAGUNA.gF.AGH. GA <br />PtojsctMarLagef. Mr, WledkepVersawthe design and construction of the resurmoing <br />of the downtown area ofLaguna Beach: and coordinated wlth !opal ;qusinesses to. <br />i WITH*60nomfoimpactsofconstruction.:In'addition tostrettresUlUnIng,the <br />pi4e0t.included installation of various traffl"aiming features, such as bulbouts; <br />fair. Wieske Introduced a bonus clause into the spadficatiohs, which significantly- <br />accelerated <br />ignificantlyaccelerated project construction, resulting in'pf <br />successful project, also from local shop ownarsfor a <br />Stor nwatot Diversion 5ysterns installation <br />CITY OF LAGUNA BEACiI I LAGUNA BEACK'CA <br />Protect Manager. Mr, Wleska was responsible for the design end construction of <br />stormivaterseparstora (CDS units) to divert urban runoff from roadways, and the City <br />stormdrain system to the municipal sewer c6lleotl9n system. Challenges included <br />working with sewer systems without disrupting service, and the design of a system that <br />can be maintained with relative ease. <br />Lexington Drive Road Improvements <br />CiTY OF LOSALAMITOS ,I WSALAMITOS, CA <br />ProJect Manager. Mr. Wlaske was: responsible for the Installation of a half -Mile <br />section of arterial highwayfroin Katella Avenue to Cerritos Avenue. Ha reviewed <br />and approved pians and specifications and oversaw all construction management) <br />Inspection activitiesfor this project. The project Involved close coordination with the <br />representatives from the City of Cypress and an adjacent community church that was <br />funding the roadway Improvements. <br />Ball Road and Bloomfield Straot intersection and Drainage Improvements <br />CITY OF Los ALAMrroS I LOS ALAMITOS, CA <br />Project Manager, Mr. Wleske served as the project manager for the installation of <br />1,400 LF of storm drain and roadwayrehabilitatlon. The design aligmnentof the <br />storm drain conflicted with multiple utilities, including sewer, water, gas, efactric, <br />and oil pipelines. He oversaw the design of the project, Including significant value <br />engineering, plan and specification quality control, bidding process, and coordination <br />with partnering funding agency, The project required extensive coordination with utility <br />agencies to either relocate or adjust conflicting utilities, <br />25E-466 <br />
The URL can be used to link to this page
Your browser does not support the video tag.