Laserfiche WebLink
CONTACTfNFO <br />PHiL KERN PE <br />Phii.kernQnv5.00xn. <br />t 4S.5tS504T7 <br />r. <br />Projedt Engineer <br />i EXPERIENCE <br />... ci­...,.,...w..,,..•...:....... . .............w..... .............. .........._..w..w...... <br />Phil hss, ftPgrs than 34 years ofaxperleace.designing and proee"I'A90ubllo vlofks <br />More than 30 years <br />pro,(eets, He hAs performed in the capacity of Projaot Manager on a wide variety of civil <br />EDUCATION <br />ongineaYin� profs. Is Involvingtraneportaur n feegIft es, utility repairs and uiigrades, <br />BS Civil Eniphoaringr.Sen <br />and sits WOM. He has been dlreetiyresponsible far the preparation of grading plans, <br />Infr$strUdture improvement plans,speoiffoat(ons traffic control/phasing <br />DI9$outak University <br />(1 83j <br />plans, and <br />oenstruetidn administration for numsroas csjnpieit civilengindsring projects. In addition <br />to hgvhtg:special technical emphasis In the areas of hydrology, hydraulics, aite.and <br />Conificate.CafEMASol* <br />transportation design, Phil's capabilities are enhancedby.fiis eye for date If and skills in <br />organization, projsQt planning, and Wrlttlsn ooriimanica0m.. <br />AsseastnentArogram <br />_ Evaluator -#01% <br />Project EveripncO. <br />♦ <br />t iDENSEs <br />P ai`Englneer-QA <br />nw....wn....nuww.....w,«n..n...www.i.... ..•www.i:.u...�... �w,•H.inwi.p..nny..........a.. <br />Cast Valley Parkway Widening i City of Escondido <br />#40831 <br />Project Manager for design ofpneholflirile.wideningofr atValiay'ParkwayandVdilay <br />ProfosslQnalEnonaer-iVV <br />Center Rood to Prime arterial MAndards between Seven Drive and the rfortheriycity <br />IfmjtswhereIt'joinadimprovementspreviouslyconettuotedbyti1pCountyThis"M <br />#9144 <br />project will 'elirrilnate a traffic bottleneck and features a bridge widening, traffic signal <br />Modifications, streatacape design, and.praparption Of right of way documents snd <br />environmental services, Top designers jd4k special care duringthe geotnsbfoapprovsi <br />phase of the pro)egt to ensure that the Improvements were nomore then needed to <br />accommodate future.trafflc prxijectlons;eaving the City capital funds that couldbe <br />applied to other heads. <br />Nieirosa Drive Extension i City of Oceanside <br />QA/QC offfcarfor the design of the missing link of Melrose Drive between Spur Avenue, <br />located about one-half mile south of State Route 75, and North Santa Fe Avenue, 300 <br />feet north of Willowbrook Drive. This 3,0004ba Medway. extension includes the design <br />of a proposed bridge crossing over Quajome Lake (toad and some wetiand habitat <br />Addltlonaly, Melrose Drive will be widened for 1,000 fast between North Santa Pe <br />Avenue and Sagewood Drive. <br />College Boulevard Widening i City of Oceanside <br />Project manager for preliminary design of widening of College Boulevard from four <br />to six lanes between Oliva Avenue and Camino de Is Plata in the City of Oceanside. <br />Efforts included geometric desigh, detailed field surveying of constraints, siting water <br />quality SMP0 and environmental coordination. <br />San Diego County Women's Detention Facility i County of San Diego <br />Project manager for preliminary and final clvll engineering of a design -build project <br />to replace the existing women's detention facility with a state-of-the-art, $221 <br />million, 478,000-squarefoot facility on a 45 -acre site. Design challenges include <br />maintaining operations at the existing Las Colinas facility during construction of Phase <br />1, stormwater compliance at the riverside site, and obtaining approvals by the local <br />municipality and utilities. <br />25E-467 <br />