Laserfiche WebLink
CONTACrINFO <br />CHARLIE WKINLEY, PE <br />charlie mokiMaytdnv5.com <br />949.585.04'77 <br />r0 9c r <br />Project Mian <br />..._,.....»».........»._.....»._......._..»...........».. <br />EXPERIENCE <br />................... .,........................ -- ................». <br />Mr McKinley has more than 30 years of experience as a professional engineer for <br />80 years <br />both large scale Capital Improvement protects and small infrastructure improvement <br />EDUCATION <br />projeots. He has 0 broad range of protect <br />experience with a focus on pipelines, pump <br />8.5. Bk.medical <br />stations, roservotm and treatment Mr. <br />McKinley brings an enthusiastic approach to <br />Engineering <br />Planning, regulatory permitting, detailed design and operations review to facilitate civil <br />LlCEt4,"•iES . <br />and envImnnnantal enginoaring projects. <br />Civil EngineerICA) <br />Project Experience <br />1`10. 08484 <br />»...»..........:..............._._....»....................... .,»»..................... ,..........,..........,,»......,............ . <br />AFFILIATIONS <br />„„...... <br />Coronado Coys.Sewage Lift Station <br />Member,. Board of <br />CiTY Of CORONADO 1 CORONADO, CA <br />Dlrectors,.So Wty <br />Task Leader. Mr,McKinley was the task leader for the design ofacomplete overhaul <br />of American Military <br />of an 870 gpm subirrarsibta pumpstation. Pumps, oontrots, wetweil t dMfigui ation, and <br />tngineers, Orange County <br />various facility elements wake replaced with current technology as part of the protect, <br />Post <br />Membar,American Public <br />Back Basin Storm Wator Pump Station <br />Works Association <br />ELISINOREVALLEY MUNICIPAL WATER DISMICTILAKE ELSINORE,CA <br />Projoot Manager. This prgiact consisted of the prellntinary and final design of a 2;500 <br />Inland empire Chapter <br />gPm skarmwater pump station to accommodated the evacuation of stormwater from the <br />President, WateRause, <br />back basin wetlands during an overflow event from Lake Elsinore. <br />Association <br />Mountain Belle Pump Station and Water Main <br />VISTA IRRIGATION DISTRICT I VISTA, CA <br />Project Enginaar. As Project engineer, Mr. McKinley was responsible for the design <br />of an interzone transmission main. Challenging terrain. alignments and steep slope <br />Installations were evaluated, a$ well as surge and.hydraullos, <br />Fullerton Road Grade Separation Stormwater and Groundwater Pump <br />Stations <br />ROWLAND WATER DISTRICT I INDUSTRY, CA <br />P#eject Manager. Responsible for the design of &120,500 gpm stormwaterpump <br />station and a 200 Spin groundwater pump station for the depression of Fullerton Road <br />under UPRR railroad traoks. The project included a hydreulio analyses of storm and <br />groundwater inflow conditions to. match with outflow hydrographs, and mechanical, <br />electrical, and structural design, Main pump station was permitted by the LACDPW <br />Dudley Sewer Commission Consulting <br />TOWN OF DUDLEY i DUDLEY, MA <br />Project Manager. Development of design plans and specifications for three Separate <br />sewer extension projects involving approximately 1.3,000 feet of gravity sewer, 7,000 <br />feet of force main, and four duplex submersible Pump stations with emergency power, <br />odor control, and several low-pressure service areas with individual grinder pumps and <br />small diameter force mains. Also completed a tow"Ide Comprehensive Wastewater <br />Management Plan, IncludingobteiningState. Revolving Fund loans and performance of <br />hydraulic modeling of the sewer eystam, as well as an on-site system survey, <br />25E-526 <br />