My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer Rehabilitation and Reconstruction Study <br />CnY OF COMPTON I COMPTON, CA <br />Project Engineer. Work consisted of hydraulic and physical evaluations of the elty's major sewers (apprgx4matety 46,000 <br />feet of 8,to 124noh pipe). The objective was to evaluate segments for raplacoment, ropair, lir rehobflitetlon (lining). Saver <br />` CCTV data was reviewed, and Interviews were conducted with operations and maintenance personnel. Spreadsheets were <br />developed to prioritize the improvements for a multiyear program. Finally, opinions of probable costs were provided, and <br />the work was presented in a Project Study Report, <br />Wastewater Collection System Upgrade Program <br />CITY OF TORRANCE I TORRANCE, CA <br />Prejoet Manager. Work consisted of the completion ofseveral projects to upgrade -the City's sewer eystem. The program <br />Included sewer rehabilitation toltiated by a systemwide video progrsm,. preparation of ewer replacement and extension <br />designs, end development of a conoept design for ailW ewers. A grease control ordinance was 8180 developed for the City <br />Code. <br />Fifinnore Sewer interceptors <br />- CITY OF FILLMORE I FILLMORE, CA <br />Proaegt Errgldeer. Mr, MOKiniay was responsible for 1:11e004ceptual design of new sewer. Intercepterstomute ell flow taxa <br />new wastewater treatment plantaite. Associated diversion'faoliitles and roadway lnfrestruoture for the new alignment were <br />also designed as part of this project, <br />Mentons Boulevard Sower <br />j CITY. OF REDLAN63 I REDLANDS, CA <br />Project Manager. As project Manager. Mr. McKinley lead the planning and design of 8 sewer extension on Mentons <br />Boulevard (Aft -SIS), which is a major access route too Anowhaad/Sig Sean Utility coordination and traffic control were key <br />i challenges addressed. As a soparate project, he also completed the design of 5,0001eet of sewer extension. PNeot <br />components included tha.Sswer Master Plah Update, Preliminary Design Report, and plane, speolflcations, And estimates. <br />Bushard Trunk Sewer <br />ORANGE OOuNTYSANITATiON DISTRICT I FOUNTAIN VALLEY, CA <br />Project Manager. Work consisted of the design and construction management of replacing the existing 544nch pipeline <br />with approximately 22,000 LF of new 9.08-inoh concrete -reinforced pipe. The project Included geotechnical and structural <br />pipe design, and coordination with involved cities for traffic control. <br />University of Connecticut WWTP upgrade and Sewer System Facilitles Plan <br />UNIVERSITY OF CONNECTICUT I STORRS, CT <br />Project Engineer. Completion of a sewer system evaluation survey to Identify reaches with excessive inflow and infiltration <br />in the University collection system. An analysis Of flows atthe.treatment plant was completed, as well as a projection of <br />future flows within the study period. A treatment plant upgrade conceptual plan was also developed. <br />Lakewood Boulevard Recycled Water Pipeline <br />CITY OF DOWNEY I DOWNEY, CA <br />Project Manager. installation of a recycled water main, potable water meter adjustments, and other miscellaneous utility <br />relocations and adjustments associated with the design and construction of streat improvements and enhancements <br />along Lakewood Boulevard from Florence Avenue to Telegraph Road. Project was divided Into two segments; Lakewood <br />Boulevard between Florence Avenue and Gallatin Road (2,800 feet); and Lakewood Boulevard between Gallatin Road and <br />Telegraph Road (2,700 feet). <br />25E-527 <br />
The URL can be used to link to this page
Your browser does not support the video tag.