Laserfiche WebLink
CONTACT€NFO <br />DEREK WIESKEr PE <br />derek wieakeenv5.com <br />949.585,0477 <br />Quality ASSurance/Qti$jity control <br />..........................................._. <br />j , I EXPERIENCE <br />-,..........__......,.................._................ .......... ,_....... ,..... <br />Mr. WiDake has more than 25 years of hands-on experlehoe In the development, <br />25 years <br />design and construction of capital improvement projects for public sgencles. His <br />EDUCATION <br />vast catalog of projects includes roadways and pedestrian Improvements; parks and <br />M.S.A, <br />landscaping, water and sewer Infrastructure, and buildings. Mr, Wleske has served in a <br />MS. Civil Engineering <br />variety of roles from City Engineer to Director of public Works for agencies throughout <br />Southern California includingthe cities of Long Beach, Laguna Beach, and Lake Forest <br />B.S;Civil. Engineering <br />ProleCt Experience <br />Licrosts...............................< <br />.w..._......_........ --- .....»................ <br />Civil Engineer (CAI <br />he. 49872 <br />Downtown Area Resurfacing <br />CITY OF LAGUNA BEACH i LACUNA BEACH, 'CA <br />AFFIUATIONS <br />Praleot Manager. Mr, Weeks oversaw the design and construction of the resurfaping <br />Member, American society <br />of the downtown area of Laguna Reach. and coordinated with local businesses to <br />ofClvii Engineers <br />minimize.amnomfo'Impects of construction: in addition tar streetresurfecing, the <br />Member (199841994), <br />mleut Included installation of various trafflo-oalmkig features, such as bulbouts, <br />Standards'8aiting <br />Mr. Weeks Introduced abonusclause inWthospecifications, which significantly <br />CDimy [ttee for the <br />accelerated project oonstrugtion, resulting In praise from [Dail shop owners for <br />CafifomleSta$e8eatd <br />successful project. <br />of t7eat€on for <br />sslo <br />ProfassJonal Enginoers <br />Stormwater Diversion & sterns installation <br />y <br />and Land Surveyors <br />CITY OF LAGUNA BEACH I LAGUNA BEACH ;CA <br />i <br />Member (2402), <br />Project Manager. Mr. Wlaske was rasponsibla for the design and construction of <br />Countrywide New <br />stormwrlter separators (COS Units) to divert urban rune.ff from roadways, and the City <br />Dsvafopmsntand <br />storindrain system to the municipal sewer collection system. Challenges €nclud ed <br />Construauon Waster Quality <br />working with sewer systems without disruptingsarvlco, and the design of aeystem that <br />Task Fares <br />can be maintained with, relative ansa. <br />Lexington Drive Rodd Improve l6rits <br />CITY OF LOS ALAMiTOS I LOS ALAM11M CA <br />Project Manager. Mr. Wieske was responsible forthe installation of a half mffe <br />section of arterial highway from Wells Avenue to Cerritos Avenue. He reviewed <br />and approved plans and specifications and oversaw rill construction manageme€ak! <br />Inspection activities for this project. The project Involved close coordination with the <br />representatives from the City of Cypress and an adjacent community church that was <br />I <br />funding the roadway improvements. <br />Ball Road and Bloomfield Street intersection and Drainage Improvements <br />CITY OF LOS ALAMITOS j LOS ALAMITOS, CA <br />P(Q)Oat Manager, Mr. Wieskaserved as the project manager for the installation of <br />2„400 LF of storm drain and roadway rehabilitation. The design alignment of the <br />storm drain conflicted with multiple utilities, Including sewer, water, gas, electric, <br />and oil plpeliltes. He oversaw the design of the project, including significant value <br />engineering, pian and specification quality control, bidding process, and coordination <br />with partnering funding agency, The project required extensive coordination with utility <br />N <br />V15 <br />agencies to either relocate oracjust conflicting utilities. <br />25E-528 <br />