My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gi}NtAGTIN a <br />STEVE SCHAPEL <br />j j j stati�aisaitapel�rv5;afi� <br />49 85:x7477 <br />- <br />Project Engineer <br />............. ................ <br />EXPERIM% <br />,........ 1. ............. ................ <br />Mr. Sohapel has more then 25 years of civil engineering experience in Southern <br />2b yeitrs <br />California. He is an experienced manager who has been responsible for the successful <br />SDUCATiiTN <br />'.experience <br />Rn$inaaring courses <br />completion of environmentallysnd pollUrAlly sonaitiva tlasllin Improvement projects, His <br />includes serving as the project manager and project engineer responsible €or <br />i� <br />preparing project studies and reoom Mohdadons, plans and specifications, and support <br />i <br />during construction. <br />Project Experience <br />................., _........... ti„,.._ ...................... ......... ....... ..._...... ..........,........... . , _..__ ....._.......... <br />Baker Street Rehabilitation j City of Costa Mesa <br />Mr. Sehapel was responsible for preparation of pians, spsefflostions and estimates for <br />the (faker Street Rehabilitation from $adds Street to (Tear Strait. The project consisted <br />of approximately A.4L1p.LFof pavement rehabilitation, reconstruction of damaged curb <br />and gutter, sidewalk,and drivekay, construction of ADA compiiantourb ramps, and all <br />appurtenant Work. <br />Central Avenue Street Reconstruction I City of Chino <br />i <br />Mr. schapel was responsible for preparation of plans, specifications and estimates <br />( <br />for UN LF of pavement reconstruction. Improvements jhcluded.WWI pavement <br />r <br />reconstruction, redesign of existing Cress sections as needed to improve drainage and <br />driveabiiity, and relialr of damaged sections of the asphalt, <br />ii <br />j <br />Alley Pavement Rehabilitation Projects I City of Costa Moss <br />Mr. $chapel was responsible for overseeing the preparation of plans, specifications <br />and estimates for the total reconstruction or pavement rehabilitation ord.d. alleys. Work <br />I i <br />included soil testing,_ structural section design; field surveying;replacemerrt of, alley <br />entrance, damaged curb and gutters, cross gutters and spandrels, sidewalks, driveway <br />and approaches, turf and irrlgatign; Wheal chair ramp (WOR) designs meeting ADA <br />requirements; planting and trimming trees; determining right-of-way; and providing <br />traffic control and striping plans. <br />Temescai Canyon Road Rehabilitation i County of Riverside <br />j <br />Mr; Schapal was responsible for preparation of plans, specilloations and estimates <br />for 2,000 LF of pavement rehabilitation. improvements included grind and asphalt <br />overlay, redesign of existing cross sections as needed to improve drainage and <br />driveability, repair of damaged sections of the asphalt, and reconstruction of concrete <br />Improvements (sidewalk, curb and gutter), <br />industrial Way Water Quality and Storm Drain Improvements i City of <br />Costa Mesa <br />Mr.5chopel was responsible for the preparation of plans, specifications, and estimates <br />for the design of the Industrial Way Water Quality and Storm Drain Improvements with <br />i <br />the objective to eliminate the floodingand current water quality problems caused <br />by the deficiencies within the existing storm drain system. The project consists of <br />V 15 <br />Installing an underground detention/infiltration facility within an open grass field <br />located south of the Anahelm Avenue and 19th Street Interseotion. The project <br />Included a hydraulic analysis of the -entire storm drain system. <br />25E-530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.